• Title/Summary/Keyword: Construction technical development

Search Result 533, Processing Time 0.039 seconds

Modelling issues in the development of a simulation game for teaching construction management

  • Saad Al-Jibouri;Michael Mawdesley
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.774-780
    • /
    • 2009
  • Simulation is becoming increasingly popular in construction for training, planning and for assessment of projects. There are, however, significant problems inherent in simulating construction which are not common to other simulations. This paper describes the development and use of computer-based game for teaching and learning of some aspects of construction project management. It is concerned with the development of a model used to simulate the construction of a rock- and clay-fill dam. It includes detailed physical modelling of the performance of individual pieces of equipment and their interaction with the ground, the geography of the project and the weather in which the equipment operates. The behaviour of all of the individual pieces of equipment when acting as fleets is also discussed. The paper also describes the modelling issues of non-technical aspects of earthmoving operations. These include environmental impact, safety, quality and risks. The problems of integrating these with the physics-based models of the equipment performance are discussed. The paper also draws on real experience of using the game in classes in three universities in different countries.

  • PDF

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF

A Study on the Technical Development for the Exterior Wall System of Container House (컨테이너 하우스 외벽 구성 시스템 기술개발연구)

  • 김환식;백기영
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.2 no.2
    • /
    • pp.57-63
    • /
    • 2001
  • This paper aims at searching the attentiveness and method in planning. design and construction procedure of the container house system where container is used as core framework. For this. we try to produce researching fundamental materials for the construction performance and design standards of steel house, and finish the sample exterior wall system of the container house. By applying this sample system to the two case study of container housing construction we find out that there are considerable efnciency of the cost saving and catch up schedule compared with existing brick housing construction system. This study is significant in that it shows future direction of technical development and investment on the prefabricate housing market through development of the prefabricated container housing system.

  • PDF

Current State and Technical Development of Geosynthetics-Reinforced Earth Wall (토목섬유 보강토옹벽의 기술현황 및 개발동향)

  • Cho, Sam-Deok;Lee, Kwang-Wu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.141-157
    • /
    • 2008
  • Since 1984, block-type reinforced earth wall with geogrid reinforcement has been widely used for retaining wall applications till now in Korea. The use of geogrid as a reinforcement in the reinforced earth wall is steadily increased in an amount over $6,500,000m^2$ in a year. However, still need exists that some problems in design and construction practices should be made to review. Therefore, this paper reviewed current state and development items of geosynthetics-reinforced earth wall technology on design and construction point of view.

  • PDF

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

Priliminary Study on the Construction Management of Facade System Using Cable-net (케이블넷을 이용한 파사드 시스템의 시공관리를 위한 기초연구)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.189-191
    • /
    • 2013
  • Analysis of cable net facade by examing the literature and technical manual for it's characteristics, types, elements of construction management. And it will be performed research on the construction quality management such as development of guidelines and specification, analysis of the structural behavior.

  • PDF

A Measure for Improving the Systematic Evaluation of the Life Cycle Cost in Technical Proposal Tendering (기술제안입찰에서의 계적인 생애주기비용 평가를 위한 개선방안)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.71-83
    • /
    • 2012
  • The use of technical proposal tendering has been expanding recently with the aim of effecting cost reduction, quality enhancement, technological development and value realization centered on multifunctional administrative cities, innovation cities, and the Yongsan relocation project. In line with the increasing interest towards life cycle cost improvement measures as an important evaluation category concerning technical proposal tendering, efforts in preparing measures that can execute the security of credibility and objective evaluation concerning architectural life cycle cost are being made. However, problems such as lack of applicable cases of design development and detail design, distortion of initial construction costs concerning the original plan, combination of constant price and current price, the ambiguity of the calculation standards between tendering corporations, inaccuracy of terms, and insufficient compositional formats concerning life cycle improvement measures are being cited. Accordingly, this study sought to propose a measure to improve the compositional guidelines, format, and standards so that a systematic life cycle cost evaluation can be executed for the reliable distinction of each participating corporation, enhanced credibility and objective evaluation of the life cycle cost improvement measure for technical proposals.

Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents (특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발)

  • Kang, Sang-Chan;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

RECENT RESEARCH AND DEVELOPING TREND OF ENGINEERING MANAGEMENT IN CHINA BASED ON TEXT MINING

  • Shaohua Jiang;Wenling Zhang;Zhaohong Qiu;Shaojun Wang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.814-820
    • /
    • 2009
  • With the rapid development of China economy, many engineering projects with large scale and investment were constructed in China and some were the biggest ones in the world. With the development of engineering practice, great progress in the research of engineering management of China was made and a large number of research findings were embodied in content of research papers and were represented by technical words. To know the state of arts in the research field of engineering management in China, three major parts, namely title, abstract and keywords of research papers in last five years from three representative Chinese journals about engineering management were chose as research materials. Unlike western languages, there are no delimiters between the words of Chinese, so the maximum matching and frequency statistics (MMFS) method, a text segmentation technique of text mining Chinese, was presented to extract the features consisting of technical words, phrases and words from the research materials. Recent research and developing trend of engineering management in China were found by comparing and analyzing the difference of technical words in the research materials of last five years.

  • PDF