• Title/Summary/Keyword: Construction technical development

Search Result 534, Processing Time 0.029 seconds

The Use of Bituminous Subballast on Future High-Speed Lines in Spain: Structural Design and Economical Impact

  • Teixeira, P.F.;Ferreira, P.A.;Pita, A. Lopez;Casas, C.;Bachiller, A.
    • International Journal of Railway
    • /
    • v.2 no.1
    • /
    • pp.1-7
    • /
    • 2009
  • The development of structural solutions for high-speed or very high-speed tracks that minimize total life cycle costs of the system is a key issue to improve the operational profitability of new investments. In opposition to conventional ballasted tracks, slab track solutions can be a cost-effective solution, but only in the cases where the benefits due to the increase in track availability and the reduction of track maintenance offsets its much higher construction costs. In the cases where such investment is not feasible, it is worth to evaluate possible structural improvements to ballasted track that allow reducing its maintenance needs without increasing too much its construction costs. This paper evaluates the design requirements and the impact of improving conventional high-speed ballasted tracks by using a bituminous subballast layer. It is divided into two main parts: first the design requirements of the structural solutions with bituminous subballast and its possible benefits on high-speed track deterioration, and secondly the evaluation of the economic impact, in terms of construction costs, of using this structural solution material in future Spanish high-speed lines.

  • PDF

How to develop corporate real estate? A decision support tool for CREM

  • Dorr, Anne;Pfnur, Andreas
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.19-33
    • /
    • 2017
  • Various forms of procurement are open to companies when constructing new owner-occupied properties. The selection of a form of procurement is an important decision-making problem for companies and their Corporate Real Estate Management (CREM) departments. With this in mind, a decision support tool has been developed to optimise the outcome and success of company's proposed real estate development projects and is presented in this paper. This model can also be used for current real estate portfolios to optimise returns in the long term. In pursuit of this objective and in order to provide an academic basis for this study, decision-relevant goals and parameters were initially identified from the referenced literature used in our research. These were subsequently evaluated in a case study of a corporate development project and identified as specific decision criteria from the perspective of the CREM. The investigation identified 15 criteria that are relevant to the corporate decision-making process in procuring and/or developing property. A model for supporting and resolving decision-making problems of this type was derived from decision theory. In this paper, a decision-making tool is presented that takes into account all the decision criteria from the CREM point of view for the first time. This model should therefore serve as an aid in implementing the decision-making process for the development of real estate projects in a more structured and transparent manner.

Development Framework of Interactive Electronic Technical Manual for Urban Regeneration

  • Son, Bo-Sik;Yu, Jung-Ho;Park, Moon-Seo;Jeong, Jin-Wook;Lee, Sang-Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.20-26
    • /
    • 2012
  • Urban regeneration is a large-scale program that must address challenges such as a significant number of involved projects, diverse participants and their conflicting objectives, and a long life span. In an effort to address these issues, the Interactive Electronic Technical Manual (IETM) is applied to urban regeneration in order to provide a guideline to enhance urban regeneration program management. Through a survey, three major functionalities required in the IETM are identified: process map provision, customized information delivery, and communication ability with other information systems. To achieve these functionalities, the development framework of the IETM and the associated technologies are examined.Its characteristics can be sum up ontology-driven metadata, user-oriented process map composition system and so on. Finally, the usage scenarios of the IETM are discussed.

Development and Operation of Integrated Technical Information System(ITIS) for an Aircraft Development (항공기 통합기술정보시스템(ITIS) 개발 및 운용)

  • Chung, Joon-Young;Lee, Joon-Woo;Kim, Cheon-Young
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.2
    • /
    • pp.75-83
    • /
    • 2006
  • The Aircraft Development Department operated a Technical Document Management System that was effectively managed using a database management system for the management of the technical information created by a research and development phase of an aircraft and managed a technical information of a research and development varied by the project on a lot of the aircraft development program. While managing the user management and technical information project, it caused some problems on the workflow of the Work Memo and a search of some technical information, etc. As result, we developed the web-based Integrated Technical Information System(ITIS) which be able to totally manage the Technical Document Management System varied by program. According to the construction and operation of this system, we can access by program using user account and privilege and dramatically increased the productivity of a research and development because of performing the workflow of the Work Memo and some search of technical information by the integrated screen of the ITIS.

  • PDF

An Estimating Space Program of Technical High School for Future Educational Curriculum (전문교과 교육과정에 대응하기 위한 공업계고등학교 공간규모 산정에 관한 연구)

  • Lee, Sang-Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.12-29
    • /
    • 2008
  • The problem should be approached in terms of recovering essential functions of technical high school and identification to supply stable and quality human resources in technical sector. An adequate space programming for technical high school is needed to educate effective skills and techniques. Considering the education directions of vocational high school, the article covers principals of technical school's construction plan and directions and, based on this, suggest the way of estimating the scale in construction plan of technical school. Through this research, systematic and reasonable space planning can be possible. The range of this research is based on development directions of society and education and an objective standard in a newly reformed the 7th Stage of Education. In addition, the research is limited to technical high school among kinds of vocational high school. The purpose is to redefine the role of technical school that face identification crisis currently, comparing to the past, and to suggest a more effective space planning. The research limits the space to classes for specialized subjects, a core space for education in technical school among diverse spaces.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Development of TIM Module for Construction PDM (PDM 구축을 위한 TIM 모듈개발)

  • 이승우;송준엽
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.307-310
    • /
    • 2001
  • In this paper, development of TIM Module for constructing PDM will be introduced. Technical information relevant product data influences cost, quality, precision and productivity. One of the very important feature of product data is organizing not by oneself but very closed to many technical information such as document, file, image and analysis sheet. To manage various technical information, several kinds of management system are used in multi level of production system. PDM and TIM systems are being developed for suitable purpose and are in need of Network technology, Information Technology, Database, sharing and distributing information. Developed TIM system is based on Web environment. By using this system, we can manage systematic technical information and reduce cost for constructing PDM system. And also we will put to practical use another technical information management system for mold plant.

  • PDF

Development of Stage-Cut Method for medium depth Shaft in Korea (국내 중저심도(20~80m) 수직구에 적합한 Stage-Cut 공법 개발)

  • Hong, Chang-Soo;Lee, Ji-Su;Hwang, Dae-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1522-1529
    • /
    • 2009
  • When a shaft is excavated in Korea, the mechanized method such as RBM(Raise Boring Machine) or RC(Raise Climber) is used independently of depth. But usually, the mechanized method is useful for the deep depth. On the contrary, when the depth of shaft is short, the cost of excavation increase. So in the case of shaft constructon less than 100m, we need to consider more suitable method of shaft construction such as Stage-cut which is one of blasting methods. Stage-Cut is widely used in the field of shaft construction in Japan as a tool of rock excavation. The main purpose of this study is to provide technical guidance for design and construction of shafts in rock, using Stage-cut method which is suitable for 20m~80m depth shaft. In this study, Blasting tests was performed in field, according to rock classification. Finally, the stage-cut method which is suitable for the geology of Korea was developed.

  • PDF

FACTOR ANALYSIS ON CONTRACTOR COMPETITION STRATEGY: A HONG KONG STUDY

  • L. Y. Shen;Y. T. Tan;S C Song;M X Yu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.289-298
    • /
    • 2007
  • The development of construction industry has led to the increase in the number of criteria imposed by project clients for selecting contractors. For example, clients often request tenderers to satisfy various conditions such as tight programme, financial strength, managerial ability, relevant work experiences, technical strength, high workmanship standard, safety requirement, quality specification, and yet others. This trend has attracted research interests of devising various methods for helping project clients to assess contractors' bids. For example, in recent development, the Works Bureau of the Hong Kong Government has introduced two mechanisms in tender evaluation for various public work contracts, namely, the Marking Scheme effective from June 2002 and the Formula Approach effective from November 2002 [1], [2]. These approaches evaluate a contractor's tender by considering collectively its tender price and performance attributes, the latter including contractor experience, past performance, technical resources and technical content of his proposal. The tender with the highest combined price and performance score (CPPS) will be normally recommended for acceptance. It appears, however, that there is little existing research in helping contractors to identify a competition strategy that enables the contractor to offer his most competitive bid collectively taking into account his resource capacities and project client's multiple performance criteria. This paper examines the factors affecting contractor's competition strategy to compete for works in Hong Kong. The understanding about the factors will contribute to identifying effective competition strategy. The data used for the analysis were collected from Hong Kong construction industry. The research findings may provide valuable references for investigating effective competition strategies in other construction industries outside the region.

  • PDF

Modelling issues in the development of a simulation game for teaching construction management

  • Saad Al-Jibouri;Michael Mawdesley
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.774-780
    • /
    • 2009
  • Simulation is becoming increasingly popular in construction for training, planning and for assessment of projects. There are, however, significant problems inherent in simulating construction which are not common to other simulations. This paper describes the development and use of computer-based game for teaching and learning of some aspects of construction project management. It is concerned with the development of a model used to simulate the construction of a rock- and clay-fill dam. It includes detailed physical modelling of the performance of individual pieces of equipment and their interaction with the ground, the geography of the project and the weather in which the equipment operates. The behaviour of all of the individual pieces of equipment when acting as fleets is also discussed. The paper also describes the modelling issues of non-technical aspects of earthmoving operations. These include environmental impact, safety, quality and risks. The problems of integrating these with the physics-based models of the equipment performance are discussed. The paper also draws on real experience of using the game in classes in three universities in different countries.

  • PDF