• Title/Summary/Keyword: Construction site operation

Search Result 298, Processing Time 0.028 seconds

Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis (경제성분석에 의한 소수력 개발의 최적규모 결정 방안)

  • Kim, Kil-Ho;Yi, Choong-Sung;Lee, Jin-Hee;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.12
    • /
    • pp.995-1005
    • /
    • 2007
  • This study presents a framework for optimum scale determination for small hydropower development in a river basin. The framework includes the construction of hydrology and topography data, the simulation of hydropower operation, the economic analysis, and the determination of optimum scale of the small hydropower. The optimum scale of design flow and facility are determined by Net Present Value among economic analysis indices. The investment cost is estimated by the cost function derived from the construction cost of existing small hydropower plants. The benefit from power generation is estimated by the price announced by government. The presented framework is applied to the two potential sites in Cho River basin for the dam and run-of-river type of plants. Finally, the sensitivity analysis for a design flow and scale of the plant is performed for the each site. The usage of the framework presented in the study is highly expected for the estimation of potential hydropower resources or the decision support tool for a proprietor by estimating the optimum scale and economical feasibility in advance.

Field Application and Maintenance of sidewalk concrete block for PV Power Generation (태양광 발전을 위한 보도형 콘크리트 블록의 현장 적용과 유지관리)

  • Kim, Bong-Kyun;Kim, Yun-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.75-83
    • /
    • 2019
  • In order to fulfill the obligation to voluntarily reduce greenhouse gas emissions under the Paris Climate Agreement, the proportion of coal and nuclear power generation is reduced worldwide and national efforts are being made to spread renewable energy including solar power generation. Korea also intends to increase the proportion of renewable energy generation to 30~35% by 2040 by introducing laws and regulations. In addition, while the country is trying to apply solar power generation to sidewalks and roads, there is no research related to it in Korea. Therefore, as a precedent study to develop solar power generation roads, solar power generation concrete blocks applicable to sidewalks and plazas were developed and the applicability was evaluated by constructing them on the site. As a result of indoor experiment, compressive strength was measured by 25.5~35.7MPa and flexural strength was measured by 5.1~10.5MPa, which showed that all domestic standards were satisfied. However, the higher the unit cement amount, the lower the strength was measured according to the mixing of the broken fine aggregate. The absorption rate was 5.7%, which satisfied the domestic standard of 7% or less. As a result of the freeze-thawing test, the reduction rate of the compressive strength after 100 cycles was up to 6.3%. As a result of measuring the settlement amount after construction, the maximum of 2.498mm was measured and irregular settlement occurred in the overall area, which is because the resolution of the sand layer was poor during construction. Maintenance techniques of sidewalk concrete block and solar panel need to be established more efficiently through long-term operation in the further.

A Study on the Optimal Location of the Inclinometer and Strain Gauge in Small-Scale Underground Excavation (소규모 지하굴착에서 지중경사계와 변형률계의 최적 위치 선정에 대한 연구)

  • Gichun Kang;Jinuk Park;Byeongjin Roh;Jiahao Sun;Seong-Kyu Yun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.2
    • /
    • pp.23-33
    • /
    • 2023
  • Currently, there are cases in Korea where economic damage has occurred due to the ambiguity instrument installation and operation standards in the construction of temporary earth retaining wall, failing to prevent collapse of temporary earth retaining wall at the construction site in advance. Therefore, in this study, a numerical analysis was conducted to find the appropriate installation location of the inclinometer and strain gauge among the installed instruments shown in the design drawing of the temporary earth retaining wall. As a results, It was found that the installation position of the underground inclinometer is the corner of the retaining wall in the case of plane-deformation analysis, and the most displacement occurs in the center of the excavation surface in the case of 3D analysis. When the stress and moment are comprehensively analyzed, the corner is judged to be a vulnerable point. In the case of the strain gauge, In plane-deformation analysis and 3D analysis, the maximum bending stress occurred at the wale connection where the end of the strut and the counter strut are in contact. At this point, it is analyzed that it is necessary to focus on installing and managing the connection to prevent accidents from being vulnerable.

Study on the Selecting of Suitable Sites for Integrated Riparian Eco-belts Connecting Dam Floodplains and Riparian Zone - Case Study of Daecheong Reservoir in Geum-river Basin - (댐 홍수터와 수변구역을 연계한 통합형 수변생태벨트 적지 선정방안 연구 - 금강 수계 대청호 사례 연구 -)

  • Bahn, Gwonsoo;Cho, Myeonghyeon;Kang, Jeonkyeong;Kim, Leehyung
    • Journal of Wetlands Research
    • /
    • v.23 no.4
    • /
    • pp.327-341
    • /
    • 2021
  • The riparian eco-belt is an efficient technique that can reduce non-point pollution sources in the basin and improve ecological connectivity and health. In Korea, a legal system for the construction and management of riparian eco-belts is in operation. However, it is currently excluded that rivers and floodplains in dam reservoir that are advantageous for buffer functions such as control of non-point pollutants and ecological habitats. Accordingly, this study presented and analyzed a plan to select a site for an integrated riparian ecol-belt that comprehensively evaluates the water quality and ecosystem characteristics of each dam floodplain and riparian zone for the Daecheong Dam basin in Geum River watershed. First, the Daecheong Dam basin was divided into 138 sub-basin with GIS, and the riparian zone adjacent to the dam floodplain was analyzed. Sixteen evaluation factors related to the ecosystem and water quality impact that affect the selection of integrated riparian eco-belt were decided, and weights for the importance of each factor were set through AHP analysis. The priority of site suitability was derived by conducting an integrated evaluation by applying weights to sub-basin by floodplains and riparian zone factors. In order to determine whether the sites derived through GIS site analysis are sutiable for actual implementation, five sites were inspected according to three factors: land use, pollution sources, and ecological connectivity. As a result, it was confirmed that all sites were appropriate to apply integrated riparian ecol-belt. It is judged that the riparian eco-belt site analysis technique proposed through this study can be applied as a useful tool when establishing an integrated riparian zone management policy in the future. However, it might be necessary to experiment various evaluation factors and weights for each item according to the characteristics and issues of each dam. Additional research need to be conducted on elaborated conservation and restoration strategies considering the Green-Blue Network aspect, evaluation of ecosystem services, and interconnection between related laws and policy and its improvements.

A Study of the Construction and Change of Chugyeongwon in Donggweol (동궐(東闕) 추경원(秋景苑)의 조영과 변천에 관한 고찰)

  • Oh, Jun-young
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.1
    • /
    • pp.44-63
    • /
    • 2019
  • This study empirically investigated the construction and aspects of change in Chugyeongwon, which is located in Donggweol (東闕). In detail, this study investigated the location of the construction and range of Chugyeongwon, the background and intention of the construction, and the affiliated system and aspects of spatial changes of it. The research results can be summarized as follows: First, Chugyeongwon has been assumed to be the space near Haminjeong (涵仁亭) or between Simindang (時敏堂) and Jinsudang (進修堂) in Changgyeonggung Palace. However, according to related historical materials, it is said that Chugyeongwon was located west of Dochongbu (都摠府) in Hyeopsangmun (協祥門) and near Sungmundang (崇文堂). Through Donggweoldohyeong (東闕圖形), evidence of the construction of Chugyeongwon can be found, which verifies such claims. According to The Plan of Changgyeonggung Palace (昌慶宮配置圖), in the form of modern measured drawing, Chugyeongwon today is the green space created in the south of Munjeongjeon (文政殿) and Sungmundang in Changgyeonggung Palace. Second, According to Donggweoldo (東闕圖), Chugyeongwon was a green space where trees grew on the ground within the walls. No artificial facilities were constructed inside. In addition, Chugyeongwon was located at a site with an altitude higher than the surroundings. Especially, the composition forms and location characteristics of Chugyeongwon are similar to those of the Palace Outer Garden located in Hanyang. Thus, based on this evidence about the form and other aspects of the operation of the Palace Outer Garden, it can be inferred that Chugyeongwon was constructed for the preservation and cultivation of the geographical features inside Donggweol. Third, in the late Joseon period, Chugyeongwon was assigned to Changdeokgung Palace or Changgyeonggung Palace in the same manner as was Donggung (東宮). Thus, it is very likely that Chugyeongwon served as a garden for the Royal Family in the Donggung area. The west boundary of Chugyeongwon, which originally consisted of walls and a side gate, was changed into the form in which the walls and colonnades were combined. Chugyeongwon has been modified due to various acts of development since the Japanese colonial era, and in the end, it has disappeared so that no trace can be found.

An approximate study on flood reduction effect depending upon weir or gate type of lateral overflow structure of washland (강변저류지 월류부에서 월류제 또는 수문 형식에 따른 홍수저감효과에 관한 개략적 연구)

  • Ahn, Tae Jin
    • Journal of Wetlands Research
    • /
    • v.15 no.4
    • /
    • pp.573-583
    • /
    • 2013
  • Construction of large-scale structures such as dams would be suggested actively to cope with change of flood characteristics caused by climate change. However, due to environmental, economic and political issues, dams are not ideally constructed. Thus flood damage reduction planning projects would get started including washland or detention pond for sharing the flood in basin. The washland made artificially by human being is an area of floodplain surrounded by bank to be intentionally inundated by overflowing through overflow structure adjacent to main channel during flood season. Flood reduction capacity at just downstream of each washland could be affected by type, length, and crest elevation of overflow structure in addition to shape of design hydrograph, storage volume of washland, etc.. In this study flood reduction effects of washland are estimated for overflow weir type and gate type to compare the results of flood reduction respectively subjected to given hydrograph in sample site, the Cheongmicheon stream. It has been shown that even if gate type at overflow structure could yield more flood reduction than overflow weir type, economic aspect such as initial cost, operation cost and maintenance cost should be considered to select the type of overflow structure because flood reduction rate by gate type could not be significant value from engineering point of view.

A case study on variation of the coefficients K and n with proceeding of blasting works at the felsite zone (규장암지역에서 발파공사중 K 및 n의 변화에 대한 연구)

  • 안명석;박종남
    • Explosives and Blasting
    • /
    • v.16 no.4
    • /
    • pp.29-39
    • /
    • 1998
  • A case study was made on in site vibration velocity data collected for two months in the construction area of the Daeduck cultural City Hall. Taegu The geology over the area shows distributions of weathered and some crack developed hornfels of mud-shale in the upper part, underlain by less weathered and hard compact quartzite. For the period of 2 months of blasting event, the vibration velocities were measured and these data were analysed for K and n for three different period the test period, first month and second month. The data for the test period show that K and n are 2464 and 1.621 with the cube root method, and 7154 and 1.791 with the sqare root one, respectively. The data for the first month collected mostly from blasting in the upper hornfels show that K and n are 1668 and 1,492 for the cube root and 1219 and 1,366 for the square root, respectively. Such a significant decrease in the K and n values from the test period through the first month for the weathered and comparatively well crack developed rocks hard and compact lower quartzite, may be due to difference in attenuation of waves propagating through physically different media. Therefore, for more effective safety design and blasting, it seems that it may be n to adopt appropriate K and n values, with getting lower step by step while proceeding the operation. In the meantime, the attenuation rate of K and n together with SD cross point for the cube and square root methods indicates that the cube root one appears to be more applicable than the square root for this area with limited distance(The maximum is 100m).

  • PDF

The Distributional Characteristics of High Schools in Daegu Viewing from Public Service Facilities (도시공공서비스 측면에서의 대구시 고등학교 분포특성)

  • Woo, Jong-Hyeon
    • Journal of the Korean association of regional geographers
    • /
    • v.8 no.3
    • /
    • pp.314-325
    • /
    • 2002
  • The aims of this study is to find the facts of regional inequality and to suggest the desirable location of educational facilities and its related policies through the analysis of the distributional characteristics of high schools in Daegu viewing from public service facilities. The results are as follows. As of 2000 year, there are 76 high schools in operation in Daegu. The number of private high schools is more than that of national public ones in terms of their founders, and the number of general high schools outnumbers that of vocational high schools by their operational types. As a whole, the distribution of schools in Daegu is closely related to the population distribution(redistribution). In case of high schools, it shows that there is severe unevenness between demand and supply of educational facilities per district. The regional inequality of school facilities is getting worse by transfer and new establishment; inter-district transfer is mainly caused by the redistribution of population while intra-district transfer is accelerated by the pressure on better use of land. Recently there is a tendency that schools are newly established by public sector(national public schools) rather than by private sector(private schools). And the predilection or avoidance of a certain area in the process of choosing the site for transfer or new establishment of schools lead to inequality of education opportunities per district. In conclusion, the educational facilities should firstly be placed in the practice of public service facilities in terms of public welfare as well as the convenience of residents and regional inequality. Consequently, both construction of new high schools and the relocation of existing high schools have to be further activated. To achieve them, the role of public actions is particularly more important than that of private ones.

  • PDF

A Study on the Creation Rural Experience Village Reflecting the Travel trends of the Post-Corona - A Case of Wi-bong Village in Jeollabuk-do - (포스트 코로나 시대 관광 트렌드를 반영한 농촌체험마을 조성방안 연구 - 전라북도 완주군 소양면 위봉마을을 사례로 -)

  • An, Phil-Gyun;Eom, Seong-Jun;Cho, Suk-Yeong;Kim, Sang-Bum
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.4
    • /
    • pp.27-39
    • /
    • 2020
  • With the COVID-19 pandemic, the global economy has stagnated and our daily lives have changed. The rural economy is also experiencing damage, such as an average of 65% or more decrease in the number of visitors to rural experience resort villages due to the spread of COVID-19. In order to minimize the damage arising from the prolonged coronavirus, a hospitality system in response to changes in rural tourism behavior and consumer demand is needed to revitalize rural areas and maintain continuous economic independence. Therefore, this study attempted to find ways to utilize landscape resources such as education, culture, history, and ecology in order to complement the existing experience programs in connection with local resources and local environment. Wibong Village, which is the subject of the study, attempted to revitalize the village using the resources through the "Creative village creation" project in 2015. Due to poor management of historical resources, difficulty in operating experience programs, and response to changes in the natural environment, the rate of implementation of the project plan was very low. Currently, the demand for experience is also decreasing due to the COVID-19 effect, so it was judged that it was necessary to develop an experience village program suitable for the needs of experienced visitors by discovering additional local resources for the continuous operation of the experience village. In order to solve the problem of the use of landscape resources and the spatial composition of the study site, additional investigations of local resources were made, and an experience program course that could be operated by theme was proposed by configuring a space suitable for the use of landscape resources. By dividing the additionally investigated landscape resources into history, ecology, and region, an experiential course was created to separate the traffic lines, and the space composition for large-scale experienced visitors that had been previously operated was constructed in a form suitable for the post-corona era. In addition, at least two experiential tour courses that can be operated by period were proposed to maintain economic effects. Starting with this study, if further research on the creation and spatial composition of a rural experience village centered on the connection with the region, it will be used as research results that can be referenced in projects such as village creation, rural space planning, and living area analysis. It is expected that it will be able to effectively cope with the construction of a rural area suitable for the post-corona era, where demand is expected to increase in the future.

Strength and Earth Pressure Characteristics of Industrial Disposal Flowable Filling Materials Utilizing Backfiller (뒤채움재로 사용된 산업폐기물 유동화 처리토의 강도 및 토압특성)

  • Bang, Seongtaek
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.3
    • /
    • pp.5-13
    • /
    • 2021
  • Due to population growth and industrial development, the amount of industrial waste is increasing every year. In particular, in a thermal power plant using finely divided coal, a large amount of coal ash is generated after combustion of the coal. Among them, fly ash is recycled as a raw material for cement production and concrete admixture, but about 20% is not utilized and is landfilled. Due to the continuous reclamation of such a large amount of coal ash, it is required to find a correct treatment and recycling plan for the coal ash due to problems of saturation of the landfill site and environmental damage such as soil and water pollution. In recent years, the use of a fluid embankment material that can exhibit an appropriate strength without requiring a compaction operation is increasing. The fluid embankment material is a stable treated soil formed by mixing solidifying materials such as water and cement with soil, which is the main material, and has high fluidity before hardening, so compaction work is not required. In addition, after hardening, it is used for backfilling or filling in places where compaction is difficult because higher strength and earth pressure reduction effect can be obtained compared to general soil. In this study, the possibility of use of fluidized soil using high water content cohesive soil and coal ash is considered. And it is intended to examine the flow characteristics, strength, and bearing capacity characteristics of the material, and to investigate the effect of reducing the earth pressure when applied to an underground burial.