• Title/Summary/Keyword: Construction site operation

Search Result 298, Processing Time 0.026 seconds

A Study on the Dual Control Platform for Drone Field Training (드론 교육현장 이중화 제어 플랫폼 연구)

  • Ryu, Ukjae;Kim, Yanghoon
    • Journal of Platform Technology
    • /
    • v.10 no.2
    • /
    • pp.20-26
    • /
    • 2022
  • Interest and investment in drones that apply the concept of the 4th industrial revolution and ICT convergence advanced technology are continuing. The purpose of drone operation has been widely spread from the initial military use to the use of various industries such as construction, forestry, facilities, and agricultural support. In these industries, the training of pilots who can actually operate drones is increasing centering on the qualification system. However, the detailed standards including the training place, training place, educational environment, and education method for nurturing pilots are ambiguous, so the education through the oral instruction of the training instructor is continuing at the drone training site. In order to solve this problem, this study conducted a study on a dual control platform in which a training instructor could directly intervene in the pilot's flying drone to execute a map in order to improve the quality of synesthesia, which is essential in the field.

A Study on How to Build a Disaster Recovery System that can Minimize Recovery Time Objective(RTO) and Recovery Point Objective(RPO) to Ensure Business Continuity (비즈니스 연속성 보장을 위한 복구 시간 목표(RTO) 및 복구 지점 목표(RPO)를 최소화할 수 있는 재해복구시스템 구축 방안 연구)

  • Kang, Hyun-Sun
    • Journal of Software Assessment and Valuation
    • /
    • v.17 no.2
    • /
    • pp.91-99
    • /
    • 2021
  • In the current business environment where dependence on IT has increased rapidly, the risk from disasters or cyber-attacks is also increasing. Business continuity, the ability to continue to provide service in the event of a business disruption caused by a disaster, is essential. In other words, you need to have a plan in place to keep your core business functions uninterrupted with rapid recovery within a predetermined Recovery Time Objective (RTO) and Recovery Point Objective (RPO) time frame. In this paper, we propose a disaster recovery system construction method that can minimize RTO and RPO to ensure business continuity. The system configuration adopts Tier 7 disaster recovery model, synchronous storage replication, hot disaster recovery site, and operation management automation solution. This ensures continuity of core business with virtually no data loss and minimal RTO and RPO.

Retrofitted built-up steel angle members for enhancing bearing capacity of latticed towers: Experiment

  • Wang, Jian-Tao;Wu, Xiao-Hong;Yang, Bin;Sun, Qing
    • Steel and Composite Structures
    • /
    • v.41 no.5
    • /
    • pp.681-695
    • /
    • 2021
  • Many existing transmission or communication towers designed several decades ago have undergone nonreversible performance degradation, making it hardly meet the additional requirements from upgrades in wind load design codes and extra services of electricity and communication. Therefore, a new-type non-destructive reinforcement method was proposed to reduce the on-site operation of drilling and welding for improving the quality and efficiency of reinforcement. Six built-up steel angle members were tested under compression to examine the reinforcement performance. Subsequently, the cyclic loading test was conducted on a pair of steel angle tower sub-structures to investigate the reinforcement effect, and a simplified prediction method was finally established for calculating the buckling bearing capacity of those new-type retrofitted built-up steel angles. The results indicates that: no apparent difference exists in the initial stiffness for the built-up specimens compared to the unreinforced steel angles; retrofitting the steel angles by single-bolt clamps can guarantee a relatively reasonable reinforcement effect and is suggested for the reduced additional weight and higher construction efficiency; for the substructure test, the latticed substructure retrofitted by the proposed reinforcement method significantly improves the lateral stiffness, the non-deformability and energy dissipation capacity; moreover, an apparent pinching behavior exists in the hysteretic loops, and there is no obvious yield plateau in the skeleton curves; finally, the accuracy validation result indicates that the proposed theoretical model achieves a reasonable agreement with the test results. Accordingly, this study can provide valuable references for the design and application of the non-destructive upgrading project of steel angle towers.

A Study on the Direction of Promoting Self-Reliant Islands Using Ocean Energy (해양에너지를 활용한 에너지 자립 섬 구축방안)

  • Lee, Woong Kyu
    • Journal of Digital Convergence
    • /
    • v.21 no.2
    • /
    • pp.1-7
    • /
    • 2023
  • This study examines the policy direction for energy self-reliant islands using marine energy. In other words, it was suggested that the environmental characteristics of the ocean should be considered by conducting a strategic marine environmental impact assessment when establishing an energy-independent island project plan. It was also suggested to proceed with preemptive site selection. In particular, it was emphasized that continuous monitoring of the marine environment should be carried out during the construction and operation of the marine energy development project. In addition, I emphasized the need to seek ways to expand marine environmental impact data and to actively participate and support the residents of the island, which is important in promoting self-reliant islands using ocean energy. This can be said to have a high probability of success when the government-led smart grid project group and KEPCO collaborate with each other. The results of the study analyzed through literature review are as follows. First, active participation and support for initiatives led by residents are needed. second,. KEPCO must collaborate with specialized public institutions such as the Smart Grid Project Group. Third, a strategic marine environment impact assessment should be introduced. Fourth, continuous marine environmental impact investigations should be conducted.

Preliminary Review on Function, Needs and Approach of Underground Research Laboratory for Deep Geological Disposal of Spent Nuclear Fuel in Korea (사용후핵연료 심층처분을 위한 지하연구시설(URL)의 필요성 및 접근 방안)

  • Bae, Dae-Seok;Koh, Yong-Kwon;Lee, Sang-Jin;Kim, Hyunjoo;Choi, Byong-Il
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.11 no.2
    • /
    • pp.157-178
    • /
    • 2013
  • This study gives a conceptual and basic direction to develop a URL (underground research laboratory) program for establishing the performance and safety of a deep geological disposal system in Korea. The concept of deep geological disposal is one of the preferred methodologies for the final disposal of spent nuclear fuel (SNF). Advanced countries with radioactive waste disposal have developed their own disposal concepts reasonable to their social and environmental conditions and applied to their commercial projects. Deep geological disposal system is a multi-barrier system generally consisting of an engineered barrier and natural barrier. A disposal facility and its host environment can be relied on a necessary containment and isolation over timescales envisaged as several to tens of thousands of years. A disposal system is not allowed in the commercial stage of the disposal program without a validation and demonstration of the performance and safety of the system. All issues confirming performance and safety of a disposal system include investigation, analysis, assessment, design, construction, operation and closure from planning to closure of the deep geological repository. Advanced countries perform RD&D (research, development & demonstration) programs to validate the performance and safety of a disposal system using a URL facility located at the preferred rock area within their own territories. The results and processes from the URL program contribute to construct technical criteria and guidelines for site selection as well as suitability and safety assessment of the final disposal site. Furthermore, the URL program also plays a decisive role in promoting scientific understanding of the deep geological disposal system for stakeholders, such as the public, regulator, and experts.

Hydrogeological Stability Study on the Underground Oil Storage Caverns by Numerical Modeling (수치모델링을 이용한 지하원유비축시설의 수리지질학적 안정성 연구)

  • 김경수;정지곤
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.35-51
    • /
    • 2002
  • This study aims to establish the methodology for design of an optimum water curtain system of the unlined underground oil storage cavern satisfying the requirements of hydrodynamic performance in a volcanic terrain of the south coastal area. For the optimum water curtain system in the storage facility, the general characteristics of groundwater flow system in the site are quantitatively described, i.e. distribution of hydraulic gradients, groundwater inflow rate into the storage caverns, and hydrogeologic influence area of the cavern. In this study, numerical models such as MODFLOW, FracMan/MAFIC and CONNECTFLOW are used for calculating the hydrogeological stability parameters. The design of a horizontal water curtain system requires considering the distance between water curtain and storage cavern, spacing of the water curtain boreholes, and injection pressure. From the numerical simulations at different scales, the optimum water curtain systems satisfying the containment criteria are obtained. The inflow rates into storage caverns estimated by a continuum model ranged from about 120 m$^3$/day during the operation stage to 130~140m$^3$/day during the construction stage, whereas the inflow rates by a fracture network model are 80~175m$^3$/day. The excavation works in the site will generate the excessive decline of groundwater level in a main fracture zone adjacent to the cavern. Therefore, the vertical water curtain system is necessary for sustaining the safe groundwater level in the fracture zone.

Site Monitoring System of Earthquake, Fault and Slope for Nuclear Power Plant Sites (원자력발전소의 부지감시시스템의 운영과 활용)

  • Park, Donghee;Cho, Sung-il;Lee, Yong Hee;Choi, Weon Hack;Lee, Dong Hun;Kim, Hak-sung
    • Economic and Environmental Geology
    • /
    • v.51 no.2
    • /
    • pp.185-201
    • /
    • 2018
  • Nuclear power plants(NPP) are constructed and operated to ensure safety against natural disasters and man-made disasters in all processes including site selection, site survey, design, construction, and operation. This paper will introduce a series of efforts conducted in Korea Hydro and Nuclear Power Co. Ltd., to assure the safety of nuclear power plant against earthquakes and other natural hazards. In particular, the present status of the earthquake, fault, and slope safety monitoring system for nuclear power plants is introduced. A earthquake observatory network for the NPP sites has been built up for nuclear safety and providing adequate seismic design standards for NPP sites by monitoring seismicity in and around NPPs since 1999. The Eupcheon Fault Monitoring System, composed of a strainmeter, seismometer, creepmeter, Global Positioning System, and groundwater meter, was installed to assess the safety of the Wolsung Nuclear Power Plant against earthquakes by monitoring the short- and long-term behavioral characteristics of the Eupcheon fault. Through the analysis of measured data, it was verified that the Eupcheon fault is a relatively stable fault that is not affected by earthquakes occurring around the southeastern part of the Korean peninsula. In addition, it was confirmed that the fault monitoring system could be very useful for seismic safety analysis and earthquake prediction study on the fault. K-SLOPE System for systematic slope monitoring was successfully developed for monitoring of the slope at nuclear power plants. Several kinds of monitoring devices including an inclinometer, tiltmeter, tension-wire, and precipitation gauge were installed on the NPP slope. A macro deformation analysis using terrestrial LiDAR (Light Detection And Ranging) was performed for overall slope deformation evaluation.

Determination on Connection Type of Entrance/Exit on Urban Roads (도시부 도로상의 진출입부 접속형태 결정에 관한 연구)

  • Lee, Hyung-Mu;Kwon, Sung-Dae;Oh, Seok-Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.219-230
    • /
    • 2023
  • Cities are continued to be highly advanced and metropolitanized. Lands adjacent to road make entry/exit connection increase along with construction of facilities for various purposes. However, in the absence of specific installation standards of entry and exit connection, inappropriate access location, types of access, and operation methods are deteriorating the level of traffic services at existing roads and intersections. Therefore, in order to minimize the traffic impact from entrances connected to minor arterial roads and colletor roads, first, this study re-established the waiting length in the intersection of upstream and downstream and length required for changing lanes and between entrance/exit and connection, considering the road and traffic environment in contact with the entrance. Second, it is suggested that the operation method depending on the connection type and whether to install left turn lane and acceleration and deceleration lane can be determined quantitatively by relation with the service level of nearby intersection after calculating the threshold amount of business site through negative social cost, which is the difference between the installation cost of the left turn lane and the acceleration and deceleration lane according to the type of access to the entrance and exit.

Bleeding control of an injury to the infrarenal inferior vena cava and right external iliac vein by ipsilateral internal iliac artery and superficial femoral vein ligation after blunt abdominal trauma in Korea: a case report

  • Hoonsung Park;Maru Kim;Dae-Sang Lee;Tae Hwa Hong;Doo-Hun Kim;Hangjoo Cho
    • Journal of Trauma and Injury
    • /
    • v.36 no.4
    • /
    • pp.441-446
    • /
    • 2023
  • Inferior vena cava (IVC) injuries, while accounting for fewer than 0.5% of blunt abdominal trauma cases, are among the most difficult to manage. Despite advancements in prehospital care, transportation, operative techniques, and perioperative management, the mortality rate for IVC injuries has remained at 20% to 66% for several decades. Furthermore, 30% to 50% of patients with IVC injuries succumb during the prehospital phase. A 65-year-old male patient, who had been struck in the back by a 500-kg excavator shovel at a construction site, was transported to a regional trauma center. Injuries to the right side of the infrarenal IVC and the right external iliac vein (EIV) were suspected, along with fractures to the right iliac bone and sacrum. The injury to the right side of the infrarenal IVC wall was repaired, and the right internal iliac artery was ligated. However, persistent bleeding around the right EIV was observed, and we were unable to achieve proximal and distal control of the right EIV. Attempts at prolonged manual compression were unsuccessful. To decrease venous return, we ligated the right superficial femoral vein. This reduced the amount of bleeding, enabling us to secure the surgical field. We ultimately controlled the bleeding, and approximately 5 L of blood products were infused intraoperatively. A second-look operation was performed 2 days later, by which time most of the bleeding sites had ceased. Orthopedic surgeons then took over the operation, performing closed reduction and external fixation. Five days later, the patient underwent definitive fixation and was transferred for rehabilitation on postoperative day 22.

A Study on the Accuracy Analysis of Position Measurement Target for Underground Facilities by Retro-reflection (재귀반사체를 이용한 지하시설물 위치측정 타깃의 정확도 분석에 관한 연구)

  • Min, Kwan Sik;Kim, Jae Myeong;Choi, Yun Soo
    • Spatial Information Research
    • /
    • v.21 no.1
    • /
    • pp.45-52
    • /
    • 2013
  • Recently 3D surveying is recommended to manage underground facilities systematically before refilling of site operation. As the demand of realtime localization increases, cost reduction and consistent data construction which are realizable by using one man surveying method with unmanned target, are necessary for constructing DB of all sorts of the underground facilities with more speediness and correctness. This study sets a goal to develop a new type of surveying target which allows realtime localization to be performed by one man, through making an optimum reflector(triangle, quadrangle, and semispherical shape) by using the retro-reflection principle of optical prism which is being used for surveying currently. The new surveying target makes realtime surveying possible. To check reliability of its data, the accuracy is compared with surveying coordination of total station for each type in a quantitative method. In the result, the usefulness of the reflector for Underground Facilities localization is proved. Thus the foundation for underground DB construction conducted by one man is established for acquisition of 3D location information in more efficient way through using unmanned target.