• Title/Summary/Keyword: Construction site office

Search Result 122, Processing Time 0.029 seconds

Research on the Effect of High-Rise Commercial Building Construction on Land Value of Shanghai in the 1920s

  • Sun, Le
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.2
    • /
    • pp.145-154
    • /
    • 2016
  • When the tall office building first appeared in the street of Chicago in the end of Nineteenth Century, this building type has become a commodity in the development of real estate and been defined as a machine that makes the land pay. With the investigation of land price samples of the high-rise commercial buildings and the overall land price development in the central district of International Settlement in Shanghai, this paper tries to examine the site selection and construction of high-rise commercial buildings have important positive effect on the land value development.

Safely Improvement Program for High-Rise Office Building Management (고층건물 관리자의 안전관리 개선방안)

  • Lee, Yong-Sam;Choi, Jong-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.87-96
    • /
    • 2005
  • In the construction industry, most safety related researches have been focused on the safety matters in construction job site while the safety issues regarding facility management have been received limited attention. Hence, this research aimed to uncover the problems of current safety management practices then suggest improvement plans. Through the questionnaire suey and analysis, following conclusions were drawn. Regarding the safety mindset, participation rate in safety prevention activities is average at most. Therefore, the extra attention and effort by property owners and managers are required. Examination of accidents indicated that 88% of them were stemmed from unsafe activities, 10% from unstable mentality and 2% from unavoidable natural disasters. Therefore, 90% of these accidents could be prevented by eliminating unsafe activities. In addition to the above findings, several other facts and suggestions are detailed.

Multi-Dimensional Hybrid Design and Construction of Skyscraper Cluster -Innovative Engineering of Raffles City Chongqing-

  • Wang, Aaron J.
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.3
    • /
    • pp.261-269
    • /
    • 2017
  • Designed by star architect of Moshes Safdie, Raffles City Chongqing includes a total of 6 mega high-rise towers 250 to 380 m tall, a sky conservatory, a 5-storey high shopping mall and a 3-storey basement car parking. Located at the confluence of the Yangtze and Jailing Rivers, the site for the project is imbued with a significance that is immediately symbolic, both as a sign of Chongqing's important past and as a vivid indicator of the city's thriving present and future. The design for the project to be situated at this gateway takes as its governing idea the image of powerful sails upon the water. The outer facades of the project's eight towers - the transparent surfaces that will face the water to the north - are meant to recall a fleet of ancient Chinese ships, with their huge rectangles of white canvas filled by the wind. This is a $1.13million\;m^2$ mega scale integrated project of office, retail, hotel, service residence and high-end residence with the transportation hub and traffic circulation at various levels of the project. This paper presents the multi-dimensional hybrid design, engineering and construction of this mega scale project. The innovations and the cutting-edge technology used in this project are introduced and discussed benchmarking the design and construction of the skyscraper cluster in a major city like Chongqing of China.

The Introduction of Converter Station Construction for HVDC Link Project between Jindo and Jeju (진도~제주간 직류연계 사업을 위한 변환소 건설 개요)

  • Lee, Jong-Seok;Moon, Bong-Soo;Kang, Won-Tag;Kim, Kyeong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.357_358
    • /
    • 2009
  • According to the 4th BPE(Basic Plan for long-term Electricity Supply and Demand), Electricity demand of Jeju island in 2012 will be reached to 682MW. Jeju island will be faced with severe shortage of electricty, also needed to find transport route to supply green energy which will be made from "Carbon free island" energy policy toward land at that time. For that reason, The plan which construct 400MW size HVDC connection line was decided for potential supply stabilization and transportation of green energy. KEPCO organized special construction office not only to observe the successful project completion which aims 2011 December but also to build up professional manpower. KEPCO is putting spur to the HVDC project these days. Construction site of converter stations has been already confirmed and contracts of cable, converter have done as per turn-key early this year. On this report, we would like to discuss about project scheme, main characteristics of system, and the furture progress plan of "Jindo~Jeju HVDC construction project expecially converter station part" which is being pushed by KEPCO.

  • PDF

Field Case Study of Mechanized Form Roads Pavement Construction using Cellulose Fiber Reinforced Concrete (셀룰로오스 섬유보강 콘크리트를 사용한 기계화경작로 확·포장공사의 현장사례 연구)

  • Park, Jong Gun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.57 no.2
    • /
    • pp.47-56
    • /
    • 2015
  • At the present, the mechanized form roads pavement was constructed with plain concrete. Mostly, it was used by welded wire mesh for preventing crack. Cellulose fibers for the reinforcement of concrete offer relatively high levels of elastic modulus, fiber count (per unit weight), specific surface, and bond strength to cement-based materials. The construction of concrete pavement confirmed that cellulose fiber reinforced concrete was applicable to mechanized form roads pavement. In the study, cellulose fibers were used here at 0.08 % volume fraction, which is equivalent to a fiber content of $1.2kg/m^3$. Cellulose fiber reinforced concrete were compared with plain concrete. Field test results indicated that cellulose fiber reinforced concrete showed slightly to increase of 28 days compressive strength and improved the initial strength. it tended to increase of splitting tensile strength. Test results showed that the slump and air content tend to decreased. but, the variation of air contends is very little. Also, construction cost of cellulose fiber reinforced concrete is less than about 25.7 % the case of welded wire mesh previously used. Therefore, The cost reduction is expected to be possible in construction site by mechanized form roads pavement.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Development of Safety Management Index for Contractor Assessment in Bidding Process (입찰단계 수급자 평가를 위한 안전경영지수 개발)

  • Ji, Soung-Min;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.3-13
    • /
    • 2011
  • The construction industry is still the most risky industry and labor accident is a significant management factor on construction site. Safety management has been studied for improving the safety performance on construction sites. However, Almost all of them have been considered on the site safety management for the contractors and evaluation of accident rate. To resolve the limitation of current research, this study is focused on considering accident result and effort by performing the evaluation of safety level of the head office and site in construction companies. By studying the research about a safety management and interviewing with specialists in safety management, 7 items were selected and weighted based on the KOSHA18001 List. Consequently, The checklist was developed to evaluate safety performance management in construction company and Safety Management Index was suggested to coordinate 1) the score of results in accident rate and 2) the effort to evaluate a safety performance management. Safety Management Index is more helpful to evaluate the safety management results and effort. As a result of considering the score of the accident rate and the safety performance management, the outcome of prequalification was changed. Using this index, contractors will attempt to prevent accidents and owners will be able to discriminate individual differences in bidding process.

Design of Network Architecture in Underground Structure Field Information Based on VI-GNSS (VI-GNSS 지하구조물 현장정보 네트워크 아키텍쳐 설계)

  • Jeon, Heung-Soo;Jang, Yong-Gu;Oh, Chang-Kyun;Kim, Min-Koan
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.18 no.1
    • /
    • pp.64-73
    • /
    • 2015
  • Recently, the integrated utilization of technology with IT is in demand for the effectiveness of field management together with the prevention and prompt action on safety accident at construction site. In addition, the establishment of construction site support system is necessary to implement the securing of worker's safety, smooth work instruction, efficiency in construction, and others. Data standardization and network architecture were designed regarding data and sound information for data transmission between systems and management. These were to construct USFSS based on integrated VI-GNSS technology in this research. In the stability test of data for each system constructed through it, around 98% stability was secured between workers and for transfer vehicle system within underground structure and field server system in regards to the data transmission stability, around 100% stability was secured between field server system and control system, respectively. Also, in the sound transmission stability test, around 99% reliability could be secured with 1km distance as its standard in case of sound transmission from underground structure construction site to field office near the field through wireless FRS system.

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

A Study on Cheongju-eup Townscape in the Late 1930s by Modeling the Restoration Image (도심 복원 이미지 제작을 통한 1930년대 후기 청주읍치 경관 고찰)

  • Kim, Tai-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.2
    • /
    • pp.27-34
    • /
    • 2019
  • This study explores the emergence of a modern form of Cheongju-eup townscape in the late 1930s by re-examining the 1960s restoration model of Seongan-dong and Jungang-dong in Cheongju, one of the historic cities in South Korea. According to the acquired data from the restoration model, it is found that the construction of a new urban area during the late 1930 was resulted from the following events: the development of a railroad station located outside of the north gate of Cheongju-eup since 1921, the completion of Musimcheon embankment outside the south gate in 1932, and the construction of Chungcheongbuk provincial office outside the eastern gate in 1937. In this period of development, which the author named 'Cheongju-eup period', the streets in the old castle, consisting only of two-story financial buildings, had been expanded from the existing area at the Seongan-gil intersection to the outside the east gate of Cheongju-eup. In addition, public government buildings, which were mainly located in both Seongan-gil and Yulgok-ro in the east-west direction, were newly constructed during the late 1930s in Seokgyo-dong, a new area in which a large number of commercial buildings including department stores, clothing stores, shoes shops, and watch stores were also built along the streets. Moreover, the modern form of Cheongju-eup was to be formed by several construction projects in the area of Jungang-ro in the late 1930s. Until the 1920s, the townscape outside the northern gate of Cheongju-eup, were composed of primary, agricultural, and female schools built on a largest site of Gyoseo-ro and Daeseong-ro as well as a transportation warehouse and a railway office near the Cheongju station. Then, entering the 1930s, new school buildings and domestic industrial shops and factories were built around the area of Jungang-ro ranging from the railway outside the northern gate to Bangadari. As a result, the expansion of townscape with newly constructed buildings in the late 1930s marked the emergence of a modern form of Cheongju-eup.