Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects (목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 -)

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.41-53
    • /
    • 2019
  • As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.

Logistical Simulation for On-site Concrete Waste Management in Decommissioning

  • Lee, Eui-Taek;Kessel, David S.;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.4
    • /
    • pp.389-403
    • /
    • 2019
  • Large amounts of concrete waste are likely to arise from the decommissioning of a Kori-1 nuclear power plant. Several studies have been conducted on decommissioning concrete waste in recent decades, however, they have been limited to contaminated concrete issues or were small pilot-scale experiments. This study constructed two industrial-scale models of on-site concrete waste management for clean as well as contaminated concrete. To evaluate the performance of both the models, simulations were conducted using the Flexsim software. The concrete particle size distribution of Kori-1 and concrete processor properties based on widely used construction equipment were used as sources of input data for the simulations. It was observed that it may take over two years to complete the on-site concrete management processes owing to the performance of existing processors. In addition, it was demonstrated that it is essential to identify bottlenecks in the system and enhance the performance of the relevant processors to avoid delays of the decommissioning schedule. Our results suggest that this novel approach can contribute to developing schedules or expediting delayed activities in the Kori-1 decommissioning project.

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF

Development of the Work Information Management System of Pavement Crack Sealing (도로면 크랙실링 작업정보 수집 관리시스템 개발)

  • Byun, Woong-Ho;Oh, Se-Wook;Lee, Hyun-Jung;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.80-91
    • /
    • 2007
  • Crack in Pavements have been continually increased a by water penetration Therefore, the cracks can result in deterioration of the pavements that could be extremely dangerous fro road users. Creak sealing work performed in outdoor is very dangerous, costly and labor intensive. To slove these problems, automated crack sealing systems have been developed. it Would be needed that work information related to crack sealing must be gathered in an effort to used for existing or future crack sealing work. Furthermore, work information related to crack sealing could be utilized in analyzing work productivity and condition. The primary objective of this study is to propose a PDA and Web-based system for work information management of crack sealing which enables to effectively interchange work information between head office and fields, and to accurately collect work information. Finally, it is anticipated that the effective use of the developed PDA and web-based system would be able to effectively share work Information, measure productivity, estimate costs as well as plan future work schedule.

Decision Making Support Tool for Master Architect in Design Development Phase of Mega-Project (메가프로젝트 기본설계단계의 Master Architect 의사결정지원 도구)

  • Cho, Dong-Hyun;Koo, Kyo-Jin;Park, Sung-Chul;Kim, Jong-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.202-206
    • /
    • 2008
  • Recently, as high level of interest for the city regeneration, large-scale projects are planned or being performed such as reconstruction project. These mesa-projects have different characteristics from a single project in the design phase. It is a number of companies involved in design phase of mega-project and principal decision-making entity manage the project from the initial stage of an ongoing business by coordinating an opinions between design companies. The absence of a decision making support system reflected those characteristic causes a variety of problems such as a loss of cost and schedule. Therefore the final object of this paper is to propose a decision making support tool and system interface.

  • PDF

Towards attaining efficient management of berth maintenance in Saudi Arabian Industrial Ports

  • Mohammed E. Shaawat;Abdullah Binomar;Abdulaziz S. Almohassen;Khalid Saqer. Alotaibi;Mahmoud Sodangi;Ahmad Aftab
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.1
    • /
    • pp.25-42
    • /
    • 2023
  • Despite the significance of ports as critical economic infrastructure, the berth facilities usually deteriorate due to heavy loading, unloading, aging, environmental weather conditions, marine growths, and lack of efficient maintenance management. Marine berths require proactive maintenance management to limit deterioration and defects as no berth facility is maintenance-free. Thus, delay in carrying out maintenance work for the marine berths can be devastating to the operational process involving ship entry, loading, and unloading operations. The aim of this research is to coordinate both operations work, and maintenance works that take place inside the berth of a local industrial port in Saudi Arabia, by developing a novel framework that integrates both works without affecting the efficiency and functionality of the berth. The study focused on defining the operational process of the port and identifying the elements with direct and indirect effects. In addition to determining the priority for the entry of ships inside the berth, it also identified the factors involved in designing a framework that included maintenance work as a component of the monthly berth occupancy schedule. By applying a mathematical model, a framework was established, which includes all the important elements of the process. As a result of the mathematical method formulation process, a database was designed that organizes and coordinates the operations of all berths within the port. This creates time to carry out the required maintenance work monthly as well as ease of coordination with the contractors responsible for the implementation of those works.

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.

Design and Implementation of Piping Spool Management Android Application using QR Code (QR Code를 활용한 배관 스풀관리용 안드로이드 어플리케이션 설계 및 구현)

  • Jeon, Sang-Moon;Kim, Kyoung-Su
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.609-616
    • /
    • 2012
  • Plumbing of the plant project is an important discipline. Now workers on the construction site, carry hundreds of piping spool drawings and documents, record the Spool Stage data. Then, The data is input into the system or has been documented in the field office. Because of the work-flow, duplication work occurs. As a result, it is reducing the effectiveness of the Plumbing and causes schedule delays. Also, To manage the integration process, there is a problem, it takes a lot of time. Therefore, The study is conducted to design and implementation of piping spool management Android Application using QR Code. The Application will contribute to the management to the integration of piping work process.

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.