Identification of Major BIM-applicable Tasks with Contribution to Achieving Objectives and Expected Benefit in Construction Stage: Focused on the Case of Public Apartment Housing Projects

목표달성기여도와 예상적용효과에 의한 시공단계 BIM 주요 업무 도출 - 공공부문 공동주택 건설사업 사례를 중심으로 -

  • 송상훈 (한국토지주택공사 토지주택연구원) ;
  • 방종대 (한국토지주택공사 토지주택연구원) ;
  • 손정락 (한국토지주택공사 토지주택연구원)
  • Received : 2019.08.02
  • Accepted : 2019.09.27
  • Published : 2019.09.30

Abstract

As a central part in smart construction, BIM has been rapidly spread in construction industry at large. However, the level of applying BIM in construction stage is still relatively lower than that in design stage due to unclear application method, inadequate design BIM model, technical faults of BIM itself, etc. Under these circumstances, public owners inevitably need to adjust the scope and pace in BIM application considering their internal support and capabilities of contractors. This study aims to suggest major BIM-applicable tasks during construction stage in the process of establishing gradual long-term and short-term introduction strategy for public apartment housing projects. Those major tasks were identified with the combination of the importance of tasks and the future benefits of BIM using IPA method. To do so, the degrees of contribution to achieving objectives in construction, current task execution, and communication requirement were investigated by internal site managers. On the other hand, the expected benefits and current level of using BIM were assessed by BIM experts. Among operational tasks by phases, design review, construction plan review, making as-built drawing, etc. were categorized as major tasks. In addition, progress control, regular meeting, master schedule development, work inspection, on-site quality check, etc. were also drawn as major tasks by management areas. The results of this study will provide the useful reference for owners concerned about the introduction of new technologies.

Keywords

References

  1. Bryde, D., Broquetas, M., Volm, J. M. (2013). The project benefits of Building Information Modelling (BIM), International Journal of Project Management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
  2. Building and Construction Authority (2013). BIM essential guide for contractor.
  3. Chan, A. (2001). Framework for measuring success of construction projects, CRC for Construction Innovation, pp. 8-13.
  4. Cheng, J. C. P., Lu, Q. (2015). A review of the efforts and roles of the public sector for BIM adoption worldwide, Journal of Information Technology in Construction, 20(27), pp. 442-478.
  5. Dodge Data & Analytics (2018). The key performance indicators of construction, Autodesk, pp. 5-14.
  6. Jeon, S. H., Yun, S. H., Paek, J. H. (2007). A study on analysis of the correlation between Building Information Modeling and project management information system, Proceedings of AIK Conference 2007, 27(1), pp. 757-760.
  7. Jin, J. H., Wang, M. H., Shim, C. S., Kang, J. Y. (2018). Policy toward Ex-BIM & manual of construction phase for smart construction site, Magazine of KIBIM, 8(4), pp. 56-66.
  8. Jo, C. W. (2010). Present and future of the roles of BIM actors, Review of Architecture and Building Science, 54(1), pp. 41-44.
  9. Jung, Y. S. (2012). BIM and IPD of facility construction owners , Cad & Graphics, 2012(3), pp. 124-126.
  10. Kam, C., Senaratna, D., McKinney, B., Xiao, Y., Song, M. (2016). The VDC scorecard: formulation and validation, CIFE, Stanford University, pp. 10-16.
  11. Kang, B. C., Cho, C. W., Lee, W. J., Han, J. S., Park, S. H. (2017). Plan for improving effectiveness of BIM application and case studies, Public Procurement Service, pp. 151-153.
  12. Karppinen, A., Lennox, M., Lehto, M., Maalahti, J., Kiviniemi, M. (2012). Common BIM requirements 2012(v 1.0): Series 13. Use of models in construction, COBIM project parties, pp. 10-17.
  13. Kim, H. J. (2017). Analysis of applicability of BIM to architectural construction sites, Construction Technology, Ssangyong Engineering & Construction Co., pp. 68-73.
  14. Kim, H. R., Lee, N. K., Jang, H. S. (2013). Analysis of competency assessment using IPA for construction project managers, KJCEM, 14(1), pp. 115-123.
  15. Kim, Y. H., Kim, H. S., Kang, L. S. (2015). A study of BIM delivery model for railway construction project using BIM function breakdown structure, Journal of the Korean Society for Railway, 18(4), pp. 344-353. https://doi.org/10.7782/JKSR.2015.18.4.344
  16. Korea Land and Housing Corporation(LH) (2018). LH Guide for BIM Uses(v1.0), pp. 57-58
  17. Lee, C. J., Lee, G., Won, J. S., Yun, S. C. (2011). Derivation of high-priority items for BIM adoption in CM service: CM service for high rise building, Journal of the Architecture. Institute of Korea, 27(6), pp. 115-122.
  18. Lee, H. S., Lim, J. H. (2014). SPSS 20.0 manual, Jiphyunjae, pp. 376-383.
  19. Messner, J., Anumba, C., Dubler, C., Goodman, S., Kasprzak, C., Kreider, R., Leicht, R., Saluja, C., Zikic, N. (2019). BIM Project Execution Planning Guide, Version 2.2. Computer Integrated Construction Research Program, The Pennsylvania State Univ., pp. 24-29.
  20. Ministry of Land, Infrastructure and. Transport (MOLIT) (2018). Roadmap for Smart Construction Technology, pp. 19-20.
  21. Public Procurement Service (PPS) (2017). Basic Guideline for BIM Application to Construction Projects(v1.32), pp. 88-89.
  22. Shim, J. K., Yi, H. I., Kim, J. J. (2010a). A study on the possibility of BIM(Building information Modeling) application of construction management, Journal of the Korean Digital Architecture Interior Association, 10(2), pp. 49-60.
  23. Shim, J. K., Yi, H. I., Kim, J. J. (2010b). A study on the analysis of Building Information Modeling factors of construction firms using an analytic hierarchy process, The International Journal of The Korea Institute of Ecological Architecture and Environment, 10(4), pp. 123-130.
  24. Shin, C. H. (2010). A study on the application of BIM in CM services. Masters Thesis, Inha University, pp. 62-80.
  25. Song, S. H., Bang, J. D., Sohn, J. R. (2019). Application of BIM in construction phase of apartment housing projects: Focused on BIM-applied cases, Land & Housing Institute, pp. 121-151.
  26. US Army Corps of Engineers (2012). The US Army Corps of Engineers roadmap for life-cycle Building Information Modeling (BIM), pp. 12-13.
  27. Yu, Y., Jeong, J., Jung, I., Yoon, H., Lee, C. (2013), Development of BIM-based work process model in construction phase, KJCEM, 14(1), pp. 133-143.
  28. Yu, J. H. (2012). Development of construction project performance indicators and multi dimensional performance management model, Kwangwoon Univ., pp. 4-8.
  29. Yun, S. H. (2016). Priority analysis of BIM technologies development using cluster analysis, Journal of the Architectural Institute of Korea (Structure & Construction), 32(9), pp. 35-42. https://doi.org/10.5659/JAIK_SC.2016.32.9.35