• Title/Summary/Keyword: Construction schedule management

Search Result 549, Processing Time 0.025 seconds

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

A Study on the Gate Review of Small and Medium-Sized Plants (SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안)

  • Jin Il, Kim;Choong Sub, Yeum;Joong Uk, Shin;Sang Bae, Lee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members (합성 PC부재에 의한 그린 프레임의 철근물량 산출 자동화 알고리즘)

  • Lee, Sung-Ho;Kim, Seon-Hyung;Lee, Goon-Jae;Kim, Sun-Kuk;Joo, Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.118-128
    • /
    • 2012
  • As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.

A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings (초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구)

  • Kim, Gwang Hee;Kim, Jae Yeob;Seo, Deok Seok;An, Sung Hoon;Choi, Hee Bok;Jung, Beong Won
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.

Requiremental Function Method based Owner's Requirement in VE Process Application at Planning Stage (기획단계 발주자 요구사항 기반 Requiremental Function Method VE 적용)

  • Park, In-Ji;Son, Myung-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.123-125
    • /
    • 2012
  • It is the important accurately to identify the needs of our customers in order to success the project. Requirements in the early stages of business is very abstract or not quantitative, and that will cause problems such as cost or schedule changes. Particularly many people are likely to prefer the early stages of the project, because the time of applying VE related cost savings is important. Owner's requirement analysis for project success in the VE process does not easy, and specific ongoing management of the requirement is difficult. Therefore, the analysis and the application of owner's requirements is limited in project process. The purpose of this study is proposed to the RFM technique to supplement the functional analysis on the basis owner's requirements analysis in planning a building project.

  • PDF

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

Document Management for Jordan Research and Training Reactor Project by ANSIM (원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리)

  • Park, Kook-Nam;Choi, Min-Ho;Kwon, Yongse
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

Current Status and Improvement Plan for Foreign Construction Laborer (외국인 건설 근로자 현황 및 개선방안)

  • Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.555-561
    • /
    • 2015
  • The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

Analysis of Constructability Factors Affecting on the Productivity of Tall Building Construction -With Focus on the Area of Steel Work- (고층 건물에서 시공성 요인이 생산성에 미치는 영향 분석 -철골 공사를 중심으로-)

  • Yoon, Hyunbo;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.30-38
    • /
    • 2014
  • Achieving high productivity and constructability are very important issues in construction industry. Study on constructability have been conducted actively, and many researches referred that improving constructability can enhance cost, quality, schedule, productivity and so on. However, there are lack of quantitative analysis, since most studies have proved correlation between productivity and constructability using questionaries and by case studies. Also, researches are mostly about specific detail scope of work to improve constructability, thus it is hard to apply constructability factors on various work in construction. In this paper, will deduct general factors affecting on constructability and evaluate effects of factors affecting on each work. Furthermore this paper will verify impact of factors affecting on productivity by multi regression anlaysis using actual data sets of high-rise building construction site.