• Title/Summary/Keyword: Construction scale

Search Result 2,854, Processing Time 0.031 seconds

Enhancing Small-Scale Construction Sites Safety through a Risk-Based Safety Perception Model (소규모 건설현장의 위험성평가를 통한 안전인지 모델 연구)

  • Kim, Han-Eol;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.97-108
    • /
    • 2024
  • This research delves into the escalating concerns of accidents and fatalities in the construction industry over the recent five-year period, focusing on the development of a Safety Perception Model to augment safety measures. Given the rising percentage of elderly workers and the concurrent drop in productivity within the sector, there is a pronounced need for leveraging Fourth Industrial Revolution technologies to bolster safety protocols. The study comprises an in-depth analysis of statistical data regarding construction-related fatalities, aiming to shed light on prevailing safety challenges. Central to this investigation is the formulation of a Safety Perception Model tailored for small-scale construction projects. This model facilitates the quantification of safety risks by evaluating safety grades across construction sites. Utilizing the DWM1000 module, among an array of wireless communication technologies, the model enables the real-time tracking of worker locations and the assessment of safety levels on-site. Furthermore, the deployment of a safety management system allows for the evaluation of risk levels associated with individual workers. Aggregating these data points, the Safety Climate Index(SCLI) is calculated to depict the daily, weekly, and monthly safety climate of the site, thereby offering insights into the effectiveness of implemented safety measures and identifying areas for continuous improvement. This study is anticipated to significantly contribute to the systematic enhancement of safety and the prevention of accidents on construction sites, fostering an environment of improved productivity and strengthened safety culture through the application of the Safety Perception Model.

The Effects of Time Scale Variation on The Runoff Calculation of TOPMODEL (TOPMODEL 유출계산에서 시간 스케일에 대한 영향 분석)

  • Kim, Kyung-Hyun;Lee, Hak-Su;Kim, Won;Jung, Sung-Won;Kim, Sang-Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.2
    • /
    • pp.125-136
    • /
    • 2002
  • The effects of the temporal scale of input hydrological data on runoff simulation have been studied using hydrological data with various time scales. TOPMODEL has been employed to explores these effects. The Genetic a1gorithm was used to calibrate model Parameters. The results of sensitivity analysis in various time scales provide the insight of parameter space for TOPMODEL operation of different time scale. The variation of temporal scale of input hydrological data appeared to have significant impacts on the model efficiency, average water table depth, the ratio of the surface runoff to the total runoff and the calibrated parameters. Generally, the longer the time scale, the more surface runoff and the less average water table death were calculated. It is found that the impact of lime scale to runoff simulation results from the structure of TOPMODEL and the hydrographic morphology.

Suggestion of a Evaluation Method for Variation of Concrete Workability According to Pumping Condition through Lab-Scale Test (펌핑 조건에 따른 콘크리트 작업성 변화 실내 평가 방법 제안)

  • Lee, Jung-Soo;Jang, Kyong-Pil;Kwon, Seung-Hee
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.4
    • /
    • pp.413-420
    • /
    • 2020
  • In this study, a new lab-scale test equipment was developed to evaluate the variation of concrete workability after pumping. The equipment was designed to simulate the pressure and shearing applied to concrete during actual pumping. In order to examine the feasibility of evaluating variation of concrete workability through lab-scale test equipment, real-scale pumping tests and lab-scale tests were performed together. The design strength of concrete used in the both tests was 24, 35, and 60MPa, and the length of pipe used in pumping tests was 130, 304, and 518m. The lab-scale tests were performed in consideration of actual pumping conditions(pressure, shearing, and pumping duration time). The workability(slump or slum flow) of concrete was measured before test, after the pumping test, and after lab-scale test. In all tests, workability of all concrete mixtures decreased. In addition, the results of both tests were measured greatly similarly.

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

The Analysis of the Psychological Productivity Factors of Construction Foreign Laborers (외국인 근로자의 심리적 생산성 요인 분석)

  • Yang, Gi Nam;Shin, Dae-Woong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.200-201
    • /
    • 2015
  • As manpower shortage of national construction site is continuing, a manpower of foreign laborers are steadily increasing. The construction industry impacts the purpose for productivity of laborers as labor-intensive industry against different industry. Therefore, there is a need of analysis of foreign laborer's productivity. This study analyzes to use foreign labor's psychological productivity factors as a basic standard by comparing to Korean's. Construction foreign laborers seem to put bigger priority on "accomplishment of task," and "job satisfaction," than Korean workers, according to the response results in Likert 5-point Scale Measurement with 11 kinds of psychological causes in theories regarding productivity factors. Thus, this study expects to use as baseline data for productivity management of construction foreign laborers.

  • PDF

A Study on the Stability of Rope Guying of Tower Cranes. (타워크레인 로프가잉 안정성 검토에 관한 연구)

  • Lee, Won-Suk;Ho, Jong-Kwan;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.247-252
    • /
    • 2009
  • With the increasing use of tower cranes higher than free standing height, the importance of lateral support is also growing. Since the fall of 43 tower cranes hit by the last typhoon 'Mami' in 2003, regulations and concerns about safety of construction equipment have increased and construction laws regarding lateral support have been strengthened. In Korea, where there are many large-scale apartment housing construction works with the development of new towns, Rope Guying is a more economical construction method than Wall Brace which fixes building structure like building wall and slab. The safety of this Rope Guying is not verified and many construction works are still carried out based on the experience of site managers. There has been no case of construction work where frame and measurements are applied. The objective of this study is to examine the safety of Rope Guying method and ensure the effective implementation of equipment and prevention of disasters.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

A STUDY ON THE IMPROVEMENT OF POST-EVALUATION ITEM FOR PERFORMANCE MEASUREMENT IN THE BUILDING CONSTRUCTION

  • Lee, Eun-Ji;Ha, Hee-Yoon;Ko, Hyun;Kim, Jae-won;Kim, Jae-Jun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.407-416
    • /
    • 2007
  • The construction industry in South Korea is experiencing great changes: it is becoming developed on a larger scale, specialized to a high degree and rapidly incorporating with other industries. This development has resulted in higher demand of construction industry. Accordingly, the transparency and an objective method of evaluation in the process of projects in the construction industry are gaining more importance. Clients' and customers' needs also require more specific objective evaluation to find whether their projects are successfully performed or not. This study aims to discuss problems on the current post-evaluation items including the qualitative item analysis such as customer satisfaction. Moreover, this paper suggests the improved ways in which enable the application of the effective evaluation system to the construction industry.

  • PDF

Restoring CCTV Data and Improving Object Detection Performance in Construction Sites by Super Resolution Based on Deep Learning (Super Resolution을 통한 건설현장 CCTV 고해상도 복원 및 Object Detection 성능 향상)

  • Kim, Kug-Bin;Suh, Hyo-Jeong;Kim, Ha-Rim;Yoo, Wi-Sung;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.251-252
    • /
    • 2023
  • As technology improves with the 4th industrial revolution, smart construction is becoming a key part of safety management in the architecture and civil engineering. By using object detection technology with CCTV data, construction sites can be managed efficiently. In this study, super resolution technology based on deep learning is proposed to improve the accuracy of object detection in construction sites. As the resolution of a train set data and test set data get higher, the accuracy of object detection model gets better. Therefore, according to the scale of construction sites, different object detection models can be considered.

  • PDF

Collapse Characteristics of Aluminum Extruded Sections and Crash Analysis Using Half Scale Model (알루미늄 압출재의 붕괴 특성 및 축소모형을 이용한 충격 해석 기법 연구)

  • 김범진;허승진;구정서;송달호
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.229-234
    • /
    • 2001
  • The aluminum extruded sections are used to the light construction of the high speed rail vehicle structures. However, the research works on the crashworthy design of aluminum extruded sections are not published sufficiently. In this paper, the collapse characteristics of aluminum extruded sections are investigated by crush test and simulation. The scale model studies are also performed to predict the impact energy absorption characteristics of full scale model through axial crush test and simulation.

  • PDF