• Title/Summary/Keyword: Construction quality management

Search Result 1,569, Processing Time 0.028 seconds

Research on Construction Quality Problem Prevention

  • Shaohua Jiang;Jingqi Zhang
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.846-854
    • /
    • 2024
  • A project's success is directly guaranteed by the prevention of construction-related problems. Nevertheless, the prevention of quality issues frequently overlooks how issues are coupled with one another, which might result in a domino effect of quality issues. In order to solve the above problems, this work first preprocesses unstructured text data with quality problem coupling. Then the pre-processing data is used to build a knowledge base for the prevention of construction quality problems. Then the text similarity algorithm is used to mine the coupling relationship between the qualities and enrich the information in the database. Finally, some text is used as test object to verify the validity of the method. This study enriches the research around the prevention of building quality problems.

Quality Management of Exposed Concrete at Construction Phase (시공단계 노출 콘크리트 품질관리 방안)

  • Kim, Tae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.164-165
    • /
    • 2016
  • To express the original texture of the concrete, exposed concrete finishing technique has been applied in many buildings. However, it is likely to cause quality problems after construction is completed. In addition, because of costs and time issues, reconstruction and maintenance works are difficult and ineffective. Therefore, step-by-step proactive quality management based on sufficient consensus among participants(client, designer, contractor) is very importatnt. This study analyzed factors causing low quality exposed concrete and quality contol points applied to 'A' headquarter construction project.

  • PDF

Analysis on Quality Defect Status in the Construction Site of Domestic Educational Facilities (국내교육시설건설공사 현장에서의 품질하자 현황분석)

  • Ryoo, Chong-Hyuck;Park, Young-Ki
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.1
    • /
    • pp.44-52
    • /
    • 2008
  • Amid the rapidly changing constructional business conditions, the volume of BTL business sectors has expanded largely during two or three years. Especially, construction works fur educational facilities of elementary, middle and high schools has been performed by the mid-sized construction companies who are not capable of doing effective and systematic quality management while the requirements of the customers are getting higher and higher. In order to have a flexible deal with the rapidly changing business conditions and also to enhance the quality level, it is the high time to reorganize the effective quality management systeme by doing the overall analysis about the quality defects in construction site. Accordingly through the investigation about the quality defects in the construction sites of domestic educational facilities, this study will focus on what kind of quality defects show. It is aimed at providing the preliminary data for the establishment of quality management fur the construction site of the domestic educational facilities by analysing the investigation results.

Improved Estimating Guideline for Quality Management Cost (건설공사 품질관리비 신출기준 개선방안)

  • Kim Kyoon-Tai;Ahn Bang-Ryul;Park Hyeong-Geun;Kim Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.75-83
    • /
    • 2002
  • Korea government established a domestic quality management system under the Law for Construction Technology Management, which was revised in 1997. This Law prescribes that the owner has to assign quality management cost into the construction project budget However, there are some conflicts among internal regulations and prescriptions on the scope of quality management engineer's roles was not specific. In order to overcome these limitations, this research identifies proper scope of quality management engineer's roles and suggests an approach for an improved estimating guideline for construction quality management cost.

QUALITY MANAGEMENT CONCEPTS, PRINCIPLES, TOOLS AND PHILOSOPHIES: A VALID METHODOLOGY FOR DEPLOYMENT WITHIN UK CONSTRUCTION-RELATED SMEs

  • Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.206-217
    • /
    • 2007
  • Generally, there is confusion as to what constitutes TQM, though it can be regarded as a set of concepts and tools for getting all employees focused on continuous improvement, various schools of thought have defined or classified the critical success factors as constructs, concepts and principles. Therefore the main aim of this paper is to provide a practical approach for understanding the quality management terminology. Using the existing quality management measurement instruments available in literature, the terminology used is classified into constructs, practices and finally tools or techniques. Quality Management may then be viewed as a combination of the three sets of terminology. Drawing on the quantitative study which investigated the implementation of TQM within the SME, the critical factors of TQM as used in that study as used to demonstrate the practical approach or methodology for the understanding of the terms thus used. For the benefit of practitioners within the Construction Management field, a bit of clarity is required as regards the terminology used. This study contributes to clarifying the conflicting results being reported in the quality management literature which inevitably leads to having different levels of analysis of Quality Management. Accordingly, the strength of quality management compared with other business philosophies should then focus on the practical methodology, namely the practices and techniques.

  • PDF

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

Performance Measurement of ISO Quality Management System in the Construction Industry (건설산업 ISO 품질경영시스템의 성과측정에 관한 연구)

  • Lee Woo-Chang;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.414-418
    • /
    • 2004
  • Quality system of construction industry in Korea was a means to prevent unqualified construction work. But lately, it has became an essential requirement. So, lots of construction companies acquire ISO quality management system which provides fundamental management criteria. Now, most of the Korean construction companies have got IS0 quality management system. So, getting ISO quality management system doesn't mean advantage in public competition of construction bidding and that causes increase in the maintenance cost. That's why some construction companies abandon the 150 certificate. Therefore, the authors need to check the effect of ISO quality management system. For this, the authors provide the performance measurement index of ISO quality management system.

  • PDF

A Study on Improvement of the Quality Management for Fire Doors (방화문의 현장품질관리 개선방안에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.93-94
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. In order to improve the on-site quality management of the fire door, we comprehensively classify the quality management items of the fire door according to the management subject and the step by stage and set the field quality management procedure, the field quality management inspection item, regulations and standardized checklists were presented.

  • PDF

QUALITY ASSURANCE IN ROADWAY PAVEMENT CONSTRUCTION

  • Myung Goo Jeong;Younghan Jung
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.596-601
    • /
    • 2013
  • In the current pavement construction practice, the state agencies traditionally determine the quality of the as-constructed pavement mix based on individual mixture material parameters (e.g., air voids, cement or asphalt content, aggregate gradation, etc.) and consider these parameters as key variables to influence payment schedule to the contractors and the present and future quality of the as-constructed mixture. A set of empirically pre-determined pay adjustment schedule for each parameter that was differently developed and being used by the individual agencies is then applied to a given project, in order to judge whether each parameter conforms to the designated specifications and consequently the contractor may either be rewarded or penalized in accordance with the payment schedule. With an improved quality assurance system, the Performance Related Specification, the individual parameters are not utilized as a direct judgment factor; rather, they become independent variables within a performance prediction function which is directly used to predict the performance. The quantified performance based on the prediction model is then applied to evaluate the pavement quality. This paper presents the brief history of the quality assurance in asphalt pavement construction including the Performance Related Specifications, statistical performance models in terms of fatigue and rutting distresses, as an example of the performance prediction models, and envisions the possibilities as to how this Performance Related Specification could be utilized in other infrastructures construction quality assurance.

  • PDF

A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system (건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.