SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안 (Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project)

  • 이종식;조승호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제22권1호
    • /
    • pp.64-71
    • /
    • 2018
  • 미국프로젝트관리협회(Project Management Institute)에서는 리스크의 형태를 외부 리스크(External Risk)와 내부 리스크(Internal Risk)로 구분 하고 있다. 외부 리스크는 프로젝트에서 통제가 불가능한 리스크로 정책 및 관련제도 변화, 기후 및 자연재해, 환율 등이다. 내부 리스크는 사업 자체에 존재하는 리스크로, 프로젝트내부에서 통제가 가능한 항목들이다. 프로젝트 관리상의 기술적 위험은 비용, 품질, 시간, 안전, 환경이다. 따라서 건설프로젝트의성공적인 수행을 위해서는 외부 리스크와 내부 리스크를 모두 관리해야 하며, 특히 기술적 리스크 관리를 통하여 시설물의 품질과 안전을 확보할 수 있다. 특히 다수의 시설물로 구성된 복합 시설물은 다수의 단위프로젝트로 구성되어 있고, 다양한 참여주체 및 이해관계자간 갈등이 존재하기 때문에 잠재 리스크에 대한관리의 중요성이 대두되고 있으며, 리스크 관리의 부재는 사업 지연 및 공사비 증가와 더불어 시설물의안전에도 부정적 영향을 미친다. 본 연구는 복합 시설물의 안전성 확보를 위한 사업관리 측면의 리스크관리 프로세스 구축 방안의 제시를 목적으로 수행하였다. 이를 위해 리스크 관리 프로세스의 구축 절차를 제시하고, 각 단계별 활용 가능한 리스크 정보로서, 건설프로젝트에 내재된 리스크의 유형 및 요인, 그리고 대응 전략을 제시하였다.

PROBABILISTIC MEASUREMENT OF RISK ASSOCIATED WITH INITIAL COST ESTIMATES

  • Seokyon Hwang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.488-493
    • /
    • 2013
  • Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.

  • PDF

BTL사업 운영리스크 분석 모형 개발에 관한 연구 (A Study on the Development of an Operation Risk Analysis Model in BTL Projects)

  • 이정순;이정훈;오세욱;유현석;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.475-480
    • /
    • 2008
  • BTL 사업은 시공비보다 운영비의 비중이 크고 장기간의 운영계획을 단시간에 수립하여 계약에 임하기 때문에 계약단계에서 운영 리스크를 예측하는 것은 사업의 성패를 좌우하는 매우 중요한 문제로서, 약정한 수준의 서비스를 제공하고 적정 수익률을 확보하기 위한 운영 리스크의 분석은 필수적이라 할 수 있다. 그러나 국내에 자금 출자와 시설 운영을 수행할 수 있는 전문 운영사의 숫자가 10여개에 불과하고 운영사 대부분의 규모가 영세하여, 운영사 내에 리스크 분석 시스템이 제대로 갖춰져 있지 않은 것이 문제점으로 대두되고 있다. BTL 사업에서 발생 가능한 리스크를 효율적으로 관리하기 위해서는 리스크 인자를 확인하고 경제적 위험도와 비경제적 위험도 그리고 발생빈도를 고려하여 리스크 인자의 우선순위를 도출하는 과정이 필수적이다. 그러므로 이 연구는 설문조사를 통해 운영사 관점에서 BTL 사업에서 발생 가능한 리스크 인자를 도출하고 우선순위를 분석함으로써 운영사의 대응전략 수립 및 리스크 관리업무의 효율성을 제고할 수 있도록 리스크 분석 모형을 제시한다. 이 연구에서 도출된 운영 리스크 분석 모형은 운영사로 하여금 BTL 사업에서 발생될 수 있는 리스크에 대한 대응전략을 수립할 수 있도록 하여 운영 리스크 관리 업무의 효율성을 제고할 수 있을 것으로 기대된다.

  • PDF

공공건설임대주택사업의 현금흐름에 대한 리스크분석 (A Study of the Analysis and Identification of Risk Factor in Regard to Cash Flow in Public Rental Housing Development Project)

  • 이상곤;이재영;이학기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.423-426
    • /
    • 2004
  • 공공건설임대주택의 사업비는 국민주택기금, 임대료, 임대보증금, 공사비, 금융비용 등 다양한 수익과 비용이 복합적으로 나타나게 된다. 따라서 공공건설임대주택 사업은 그 특성상 유동성과 재무탄력성에 대한 유용한 정보를 제공해 줄 수 있는 현금흐름예측이 필요하다. 그러나 현금흐름분석은 일부 시행하고 있었으나, 이를 예측 $\cdot$ 관리하고 있는 곳은 전무한 것으로 나타났다. 현금흐름 예측을 위한 일반적인 사항들은 실적자료와 문헌을 통하여 알 수 있으나, 현금흐름 예측의 정확성을 높이기 위한 리스크에 대한 연구는 전무한 실정이었다. 기존의 리스크에 대한 연구는 사업 전체에 대한 연구로 현금흐름과 정확한 상관관계를 알 수 없었다. 따라서 본 연구에서는 수익성 측면에서의 사업성분석 방법으로 현금흐름 예측방법을 제안하고 공공건설임대주택사업의 정확한 현금흐름예측과 관리를 위하여 현금흐름 각 항목에 영향을 미치는 리스크 인자들을 식별 $\cdot$ 분석 하고 그 대응방안을 모색하고자 한다.

  • PDF

A STUDY ON RISK WEIGHT USING FUZZY IN REAL ESTATE DEVELOPMENT PROJECTS

  • Sung Cho;Kyung-ha Lee ;Yong Cho ;Joon-Hong Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1176-1182
    • /
    • 2009
  • Due to recession in real estate market, interest of risk analysis is increasing. Feasibility study in the first stage takes a great role in a project. There are not objectified tools which are able to cope with uncertainty of project, and feasibility study based on selected method of determinism does not include liquidity of weight risk. Also, shortage of consideration for subjective and atypical external factors causes inappropriate results. Therefore, this study proposes feasibility study model focused on risk factor influences in construction cost and sales cost. Considering effective level of cost based on objective risk factors and probable weight of risk by this model, real workers are able to bring correct and scientific decisions better than former method based on selective analysis of real estate development.

  • PDF

APPLICATION OF CONTRACTORS' RISK PREFERENCE ON THE EVALUATION OF THE PHILIPPINE GOVERNMENT STANDARD CONTRACT

  • Visuth Chovichien;Joel Cesarius V. Reyes
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.144-152
    • /
    • 2009
  • Construction contracts involve the allocation or distribution of the risks inherent to a construction project between or among contracting parties. However, it has been a common practice that only one party drafts the contract due to practical reasons and particular policies of various organizations. Interviews were conducted on some local contractors to gain their meaningful insights and standpoints on the allocation of each risk. These results were compared with the actual risk allocation using the Philippine government standard contract and risk principles from the literature to determine if their considered opinions provide a plausible alternative. A sample application of this evaluation is presented for construction-related risks and risk allocation recommendations are provided in the end.

  • PDF

대형건설공사의 리스크 분석에 관한 사례적용연구 (A Case Study on Risk Analysis of Large Construction Projects)

  • 강인석;김창학;손창백;박홍태
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.98-108
    • /
    • 2001
  • 본 연구에서는 프로젝트의 성공적 이행을 보장하기 위하여 리스크분석모델을 제안하였다. 리스크분석 모델은 CRAS라 칭하였으며, 시공자가 RBS를 통해서 리스크를 체계적으로 확인하고 분석하고 관리하는데 도움을 줄 수 있도록 설계되었다. 제안된 CRAS모델은 크게 3단계의 분석과정으로 이루어진다. 첫 단계는 시공자가 프로젝트와 관련된 리스크를 확인하고 분석해서 입찰여부를 판단하는 것이다. 두 번째 단계는 영향도, 의사결정나무, Monte Carlo 시뮬레이션을 이용하여 리스크를 정량적으로 평가하여 예비비를 산정하는 것이며, 세 번째 단계는 확률 노드, 확률 칼렌다 등의 일정관리기법과 시뮬레이션을 통해 공사일정상의 리스크를 파악하여 프로젝트의 성공여부를 판단하는 것이다. 결과적으로 본 모델은 시공자로 하여금 프로젝트에 내재된 리스크가 프로젝트의 공기와 공사비에 미치는 영향을 정량적으로 평가할 수 있도록 함으로서 시공자가 이들 리스크를 제거하는데 필요한 여러 대안을 고려할 수 있도록 하였다.

  • PDF

해외 건설 프로젝트의 환리스크 관리를 위한 의사결정 지원 모델 (A Decision Support Model for the Exchange Risk Management of Overseas Construction Projects)

  • 안치훈;유현석;김영석
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.109-121
    • /
    • 2012
  • 해외 건설 프로젝트의 수주 물량은 2001년 이후 지속적으로 증가하여 2010년에는 전체 건설 프로젝트 수주 물량의 44.5%를 차지하고 있다. 해외건설 프로젝트는 프로젝트의 성패에 영향을 미치는 환경적 요소가 국내의 경우보다 다양하며 이에 따라 리스크 관리는 더욱 복잡해지고 있다. 현재까지 해외 건설 프로젝트의 리스크 관리에 관한 연구는 특정 지역 혹은 프로젝트의 발생 가능한 리스크 요인을 도출하고 이에 대한 관리 방안을 제시하는 연구가 주를 이루어 왔으나, 최근 환율 변동성의 확대로 인한 환 리스크의 중요성 및 관리기법에 관한 연구는 전무한 실정이다. 따라서 본 연구에서는 환율 변동 및 환리스크 관리 옵션(통화선도, 통화스왑, 이자율 스왑)에 따른 최근 6년간 국내 주요 건설사별 손익현황 분석 결과 및 통계 기법을 활용하여 건설사로 하여금 환리스크 선호도에 따라 해외건설 프로젝트의 환리스크를 효과적으로 관리해 나갈 수 있도록 하는 의사결정 지원 모델을 제시하고자 한다. 본 연구를 통해 제시된 환리스크 관리 의사결정 지원 모델 및 방법론은 건설사 등 해외 건설 프로젝트 수행주체가 환리스크를 사전에 예측하고 대응해 나감에 있어 주요 의사소통의 도구로써 적극 활용될 수 있을 것으로 기대된다.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF