A Case Study on Risk Analysis of Large Construction Projects

대형건설공사의 리스크 분석에 관한 사례적용연구

  • 강인석 (경상대학교 토목공학과) ;
  • 김창학 (진주산업대학교 토목공학과) ;
  • 손창백 (세명대학교 건축공학과) ;
  • 박홍태 (천안공업대학 토목공학과)
  • Published : 2001.06.01

Abstract

This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

본 연구에서는 프로젝트의 성공적 이행을 보장하기 위하여 리스크분석모델을 제안하였다. 리스크분석 모델은 CRAS라 칭하였으며, 시공자가 RBS를 통해서 리스크를 체계적으로 확인하고 분석하고 관리하는데 도움을 줄 수 있도록 설계되었다. 제안된 CRAS모델은 크게 3단계의 분석과정으로 이루어진다. 첫 단계는 시공자가 프로젝트와 관련된 리스크를 확인하고 분석해서 입찰여부를 판단하는 것이다. 두 번째 단계는 영향도, 의사결정나무, Monte Carlo 시뮬레이션을 이용하여 리스크를 정량적으로 평가하여 예비비를 산정하는 것이며, 세 번째 단계는 확률 노드, 확률 칼렌다 등의 일정관리기법과 시뮬레이션을 통해 공사일정상의 리스크를 파악하여 프로젝트의 성공여부를 판단하는 것이다. 결과적으로 본 모델은 시공자로 하여금 프로젝트에 내재된 리스크가 프로젝트의 공기와 공사비에 미치는 영향을 정량적으로 평가할 수 있도록 함으로서 시공자가 이들 리스크를 제거하는데 필요한 여러 대안을 고려할 수 있도록 하였다.

Keywords