• Title/Summary/Keyword: Construction project risk management

Search Result 482, Processing Time 0.027 seconds

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.

SE Application Methods of Pre-Business for Effective Operation of Driveless LRT System (무인운전경전철시스템의 효과적 운영을 위한 사업초기단계 SE적용방안)

  • Chung, Su-Young;Park, Soo-Choong;Min, Kyung-Se;Jeon, Seo-Tak
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3312-3317
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to Driverless LRT system. Therefore, PM and SE technique is applied for efficient management of a construction business. In case of SE(System Engineering) in domestic, most foreign companies are doing to lead but we are under effort for the environment that a domestic company can lead. In this study, We emphasize to SE importance of pre-business for operation to be effective of Driveless LRT system, and propose about activities in the SE at requirements definitions and requirements analysis steps of a highest level. To achieve this, We propose SE Application Methods of Pre-Business regarding assistance process of project planning, evaluation and control, and risk management.

  • PDF

Physiological Data Monitoring of Physical Exertion of Construction Workers Using Exoskeleton in Varied Temperatures

  • Ibrahim, Abdullahi;Okpala, Ifeanyi;Nnaji, Chukwuma
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1242-1242
    • /
    • 2022
  • Annually, several construction workers fall ill, are injured, or die due to heat-related exposure. The prevalence of work-related heat illness may rise and become an issue for workers operating in temperate climates, given the increase in frequency and intensity of heatwaves in the US. An increase in temperature negatively impacts physical exertion levels and mental state, thereby increasing the potential of accidents on the job site. To reduce the impact of heat stress on workers, it is critical to develop and implement measures for monitoring physical exertion levels and mental state in hot conditions. For this, limited studies have evaluated the utility of wearable biosensors in measuring physical exertion and mental workload in hot conditions. In addition, most studies focus solely on male participants, with little to no reference to female workers who may be exposed to greater heat stress risk. Therefore, this study aims to develop a process for objective and continuous assessment of worker physical exertion and mental workload using wearable biosensors. Physiological data were collected from eight (four male and four female) participants performing a simulated drilling task at 92oF and about 50% humidity level. After removing signal artifacts from the data using multiple filtering processes, the data was compared to a perceived muscle exertion scale and mental workload scale. Results indicate that biosensors' features can effectively detect the change in worker physical and mental state in hot conditions. Therefore, wearable biosensors provide a feasible and effective opportunity to continuously assess worker physical exertion and mental workload.

  • PDF

Predicting Default of Construction Companies Using Bayesian Probabilistic Approach (베이지안 확률적 접근법을 이용한 건설업체 부도 예측에 관한 연구)

  • Hong, Sungmoon;Hwang, Jaeyeon;Kwon, Taewhan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.13-21
    • /
    • 2016
  • Insolvency of construction companies that play the role of main contractors can lead to clients' losses due to non-fulfillment of construction contracts, and it can have negative effects on the financial soundness of construction companies and suppliers. The construction industry has the cash flow financial characteristic of receiving a project and getting payment based on the progress of the construction. As such, insolvency during project progress can lead to financial losses, which is why the prediction of construction companies is so important. The prediction of insolvency of Korean construction companies are often made through the KMV model from the KMV (Kealhofer McQuown and Vasicek) Company developed in the U.S. during the early 90s, but this model is insufficient in predicting construction companies because it was developed based on credit risk assessment of general companies and banks. In addition, the predictive performance of KMV value's insolvency probability is continuously being questioned due to lack of number of analyzed companies and data. Therefore, in order to resolve such issues, the Bayesian Probabilistic Approach is to be combined with the existing insolvency predictive probability model. This is because if the Prior Probability of Bayesian statistics can be appropriately predicted, reliable Posterior Probability can be predicted through ensured conditionality on the evidence despite the lack of data. Thus, this study is to measure the Expected Default Frequency (EDF) by utilizing the Bayesian Probabilistic Approach with the existing insolvency predictive probability model and predict the accuracy by comparing the result with the EDF of the existing model.

A component-based construction process control system for increasing modifiability (변경 용이성 증대를 위한 컴포넌트 기반의 건설공정관리시스템)

  • Kim, Eui-Ryong;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.303-309
    • /
    • 2015
  • The construction process and safety management are an important means of the total projects for the decision-making. As an important management tool of cost, resources and risks of the project, the analysis and evaluations are recorded as an important asset of company. Also, it has become a safety device that could reduce risk factors repeatedly by the decision-making methods for the future similar projects. Component-based software, by reusing the useful part, which was prepared without newly developing all that, by building a new software product, the long-term continuous/steady through the provision of a component-based software, by securing a sales base, it should be the development and supply a wide range of applications. In this paper, we propose the construction process control systems for increasing modifiability of process creation and modification for business efficiency in accordance with the diverse trends in the construction process as a low-cost niche through a component-based software supplier to solve these problems.

Computer Vision-based Continuous Large-scale Site Monitoring System through Edge Computing and Small-Object Detection

  • Kim, Yeonjoo;Kim, Siyeon;Hwang, Sungjoo;Hong, Seok Hwan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1243-1244
    • /
    • 2022
  • In recent years, the growing interest in off-site construction has led to factories scaling up their manufacturing and production processes in the construction sector. Consequently, continuous large-scale site monitoring in low-variability environments, such as prefabricated components production plants (precast concrete production), has gained increasing importance. Although many studies on computer vision-based site monitoring have been conducted, challenges for deploying this technology for large-scale field applications still remain. One of the issues is collecting and transmitting vast amounts of video data. Continuous site monitoring systems are based on real-time video data collection and analysis, which requires excessive computational resources and network traffic. In addition, it is difficult to integrate various object information with different sizes and scales into a single scene. Various sizes and types of objects (e.g., workers, heavy equipment, and materials) exist in a plant production environment, and these objects should be detected simultaneously for effective site monitoring. However, with the existing object detection algorithms, it is difficult to simultaneously detect objects with significant differences in size because collecting and training massive amounts of object image data with various scales is necessary. This study thus developed a large-scale site monitoring system using edge computing and a small-object detection system to solve these problems. Edge computing is a distributed information technology architecture wherein the image or video data is processed near the originating source, not on a centralized server or cloud. By inferring information from the AI computing module equipped with CCTVs and communicating only the processed information with the server, it is possible to reduce excessive network traffic. Small-object detection is an innovative method to detect different-sized objects by cropping the raw image and setting the appropriate number of rows and columns for image splitting based on the target object size. This enables the detection of small objects from cropped and magnified images. The detected small objects can then be expressed in the original image. In the inference process, this study used the YOLO-v5 algorithm, known for its fast processing speed and widely used for real-time object detection. This method could effectively detect large and even small objects that were difficult to detect with the existing object detection algorithms. When the large-scale site monitoring system was tested, it performed well in detecting small objects, such as workers in a large-scale view of construction sites, which were inaccurately detected by the existing algorithms. Our next goal is to incorporate various safety monitoring and risk analysis algorithms into this system, such as collision risk estimation, based on the time-to-collision concept, enabling the optimization of safety routes by accumulating workers' paths and inferring the risky areas based on workers' trajectory patterns. Through such developments, this continuous large-scale site monitoring system can guide a construction plant's safety management system more effectively.

  • PDF

Development of A Prototype for Wall Formwork Designs using Open BIM (개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발)

  • Jin, Chengquan;Kim, Hyunjoo;Hyun, Chang-Taek;Han, Sang-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.3-13
    • /
    • 2018
  • The formwork cost amounts for a significant proportion of project construction costs. It costs 10-15% of the total construction cost and 30-40% of the frame structure construction cost. In addition, the formwork collapse accidents are frequently causing deaths in the construction industry, and thus, is known to be of relatively high degree of risk. As so, the accuracy of structural calculation and quantity take-off when planning the formwork in a construction project are a very important matter. Accordingly, this study develops a BIM based formwork design prototype, that enables the construction manager to optimize the design through applying the proposed new IFC entities associated with the formwork design. The approach proposed in this study is expected to support the construction manager with accurate quantity calculation and rapid planning and construction. Since this study considered specific small-scale buildings using Euro-form and show the possibility of utilizing BIM entities in the formwork design process, further research is recommended towards the limitations in applying the system to other types of formworks.

Problem Analysis and Improvements Plans for PF ABCP of Apartment Housing Development Projects (공동주택 PF ABCP의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Soo-Yeol;Hwang, Uk-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.133-142
    • /
    • 2011
  • The purpose of this study is to analyze the problems of the parties involved in the issuance of apartment housing development projects. The adapted research method selected four apartment housing development as PF ABCP projects. This study carried out the case about participant institution of PF ABCP funding project including developer, constructor, financial institution so as to draw problems by participant institution. On the basis of the selected case, this thesis proposes methods for involved parties to negotiate and work out problems of the PF ABCP. The results of this study are as follows 1) Launching long-term project financing should be developed, including operating funds and strengthen the ABS and ABCP issuance of credit assessment procedures, combined with the simplicity of the instruments. 2) The Low-risk contract for the construction of simple managerial focus should be the construction, financial institutions essentially dependent on project financing feasibility verification purpose loans to prevent the division a true story, the development should be of interest to be preserved. The proposed included, among other, partial guarantee based on the construction plan financial institutions' share-based investment, and the supplement of legal issues.

A VR-Trainer for Forklift Operation Safety Skills

  • Ahn, Seungjun;Wyllie, Mitchell J.;Lee, Gun;Billinghurst, Mark
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.122-128
    • /
    • 2020
  • This research investigates how a Virtual Reality (VR)-based simulation could be used to train safe operation skills for forklift operators. Forklift operation is categorized as high-risk work by many occupational health and safety regulators and authorities due to high injury and fatality rates involved with forklifts. Therefore, many safety guidelines have been developed for forklift operators. Typically, forklift operation safety training is delivered based on instructional texts or videos, which have limitations in influencing people's safety behavior. Against this background, we propose a VR-based forklift simulator that can enable safe operation skills training through a feedback system. The training program consists of several modules to teach how to perform the basic tasks of forklift operation, such as driving, loading and unloading, following the safety guidelines. The system provides instantaneous instructions and feedback regarding safe operation. This training system is based on the model of "learning-by-doing". The user can repeat the training modules as many times as necessary before being able to perform the given task without violating any safety guidelines. The last training module tests the user's acquisition of all safety skills required. The user feedback from several demonstration sessions showed the potential usefulness of the proposed training system.

  • PDF

A Study on the Multiple Real Option Model for Evaluating Values based on Real Estate Development Scenario (다중 실물옵션을 활용한 시나리오기반 부동산 개발사업 가치평가 연구)

  • Jang, Mikyoung;Ku, Yohwan;Choi, Hyemi;Kwon, Tae-Hwan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.114-122
    • /
    • 2015
  • Real estate development requires significant amount of capital investment. The project duration has been increased according to its enlarged size. For this reason, cost overrun and time delay are important risk factors that should be managed properly. As a method to hedge the risk, varoius real option methods have been presented. However, conventional project value assesment methods such as NPV(Net Present Value) have weakness to support decision making by reflecting dynamic situations in terms of variation of cost and time. Furthermore, the decision making process is serious of actions rather than discrete event. The purpose of this paper is to present a multiple real option valuation method to overcome the deterministic aspect of real option presented in previous research and practice. The method is developed as following: firstly, to select the model that can be applied in the real estate development project through a survey from previous literature on real options analysis; secondly, to apply data from office development case in order to verify the model by applying conventional real option and multiple real option valuation. According to analysis result, multiple real option provides enhanced values comparing to NPV and single real option.