The 6th International Conference on Construction Engineering and Project Management
/
pp.87-91
/
2015
For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.
Because of a wide range of performance and diversity of project and uncertainty caused by complexity and a number of stakeholder, conflict occur necessarily in Urban generation including large-scale and many project which do the same time, for long time. So active conflict management which recognized risk before the fact and deal with conflict is necessarily needed. This paper based on the conflict cases related an urban regeneration. In those cases, we proposed the reason of the conflicts by analysis the most frequent combination of the conflicts and a case of conflict between each group.
Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.
BTL 방식의 민간투자사업의 경우 많은 관심과 정부의 추진의지에 의해 급성장을 하고 있음에도 불구하고 도입당시 예상치 못했던 다양한 문제점같이 나타나고 있는 실정이다. 이에 본 연구에서는 이러한 문제점들 중 사업 전(全)단계에 걸쳐 발생할 수 있는 리스크에 대한 관리 능력 및 관리 계획을 개선하기 위하여 리스크 인자별 프로젝트에 대한 영향도를 실제 사례에 대한 민감도 분석을 통하여 제시하고자 하였다. 본 연구는 향후 민간투자사업의 리스크관리에 대한 대처 방안을 연구하는데 있어 리스크 관리의 우선순위를 제시해 줄 수 있을 뿐 아니라 위험이 사업에 미치는 영향을 구조화함으로써 주무관청과 민간사업자 사이에서 발생할 수 있는 리스크분담에 대한 기준을 제시해 줄 수 있을 것으로 판단된다.
최근 전 세계적으로 환경문제에 대한 관심이 증가하면서 건축분야에서도 친환경을 위한 노력이 증가하고 있다. 본 논문은 BIM 모델에 근거하여 친환경 현장시공의 위험도 관리에 관한 연구를 하였다. 친환경건축은 지속가능한 발전을 위한 건축으로 3R(Reducing environment pollution, Reducing resource use and Reducing energy source use)표준에 도달해야 한다. BIM은 3D설계, 시공, 유지관리의 효율성 극대화를 위해 건축설계를 2D에서 3D로 전환하고 수량, 공정 및 각종 분석 등의 정보를 통합적으로 활용하는 기술이다. 그리고 4D는 3D기술에 시간을 추가한 것으로써, 3D 모델이나 4D모델에 기반을 두고 있으며, 원가관리, 계획관리, 설계 및 재료관리 등이 BIM 때문에 변화하고 확대하고 있다. 이를 통해 위험관리도를 분석할 수 있다. 본 논문은 먼저 세 분야(환경요소, 자원요소, 에너지요소)에서 친환경 시공의 위험요소를 분석하고 판별하는 방법을 소개한다. 현장에서 일어날 수 있는 위험 확인은 이 공사를 통해서 위험을 판별하고 위험특성도를 찾을 수 있다. 다음으로 친환경위험과 BIM의 관계를 분석한다. 요즘은 BIM이 많이 활용되어서 쉽게 BIM 모델의 데이터베이스를 이끌어 낼 수 있고, 위험을 미리 예방할 수 있으며 옮길 수도 있다. 친환경위험의 세 분야는 분석을 통해서 개별적으로 위험관리를 할 수 있다. 친환경건물은 에너지분야 비율이 비교적 많은데 현장시공의 친환경도 비슷하다. 따라서 위험을 미리 예방하여 에너지를 절약할 수 있다. 소프트웨어를 통해 공간과 에너지성능을 잘 알 수 있고, 사용될 에너지의 전체를 계산할 수 있고, 라이프 사이클 등을 미리 알 수 있다. 그래서 4D모델이나 5D모델을 이용하면서 시공인원이 잘 판별하면 위험을 예방하거나 옮길 수 있다. 특히 시공환경 분야, 시공소음, 수질 오염 등의 문제점을 분석할 수 있다. 친환경공사는 복잡하고, 시간주기도 길어서 자원과 에너지를 많이 소모하기 때문에 친환경위험관리에 적합한 판별이 필요하며, 이를 통해 지속 가능한 발전을 할 수 있다.
Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.92-96
/
2015
Due to unique characteristics of small construction companies, safety management is comprised of complex problems (e.g., resources constraints, a lack of formalized management structures, low level of management safety commitment etc.). In order to understand causal interdependencies between safety factors at different system levels (regulation, organization, technical and individual), this paper aims to develop a system dynamics (SD) model of safety management in small construction companies. The purpose of the SD model is to better understand why small construction companies have low level of safety performance. A causal loop diagram (CLD) was developed based on literature, with an attempt to map causal relationships between variables. The CLD was then converted into stock and flow diagram for simulation. Various tests were conducted to build confidence in the model's ability to represent the reality. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.
Kim, Minjung;Park, Moonseo;Lee, hyun-soo;Lee, Dowan;Lee, seul bi
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.602-603
/
2015
Despite all efforts to reduce construction disaster, construction site accident rate has steadily increased in Korea since 2008. As a different approach from traditional research, there is a growing issue about design for safety concept to prevent construction disaster. The notion is that construction worker's safety need to be considered at design phase, not only at construction phase. Globally, the notion has been noted that to improve the safety of the worker and used in practice. However, in Korea, most of safety management guidelines are limited to construction phase. From recent statistics, only 1.4 percent of designer feel responsible for safety accident at construction site. In this circumstance, this research find out safety guidelines through literatures reviews and practical experience of safety management in other country which apply design for safety concept. Selected guidelines are verified by survey which is evaluated with risk, function, cost, time and aesthetic view categories. Through the survey, define guidelines which could be effectively applied in Korea. By using proposed safety guidelines for design phase, preventing construction accident and improving designer's recognition of safety issue at design phase are expected.
The 8th International Conference on Construction Engineering and Project Management
/
pp.249-256
/
2020
Historical construction health and safety (H&S) challenges, in terms of a range of resources and issues, continue to be experienced, namely design process-related hazards are encountered on site, workers are unaware of the hazards and risks related to the construction process and its activities, activities are commenced on site without adequate hazard identification and risk assessments (HIRAs), difficulty is experienced in terms of real time monitoring of construction-related activities, workers handle heavy materials, plant, and equipment, and ultimately the experience of injuries. Given the abovementioned, and the advent of Industry 4.0, a quantitative study, which entailed the completion of a self-administered questionnaire online, was conducted among registered professional (Pr) and candidate Construction H&S Agents, to determine the potential of Industry 4.0 to contribute to resolving the challenges cited. The findings indicate that Industry 4.0 technologies such as augmented reality (AR), drone technology, virtual reality (VR), VR based H&S training, and wearable technology /sensors have the potential to resolve the cited H&S challenges as experienced in construction. Conclusions include that Industry 4.0 technologies can finally address the persistent H&S challenges experienced in construction. Recommendations include: employer associations, professional associations, and statutory councils should raise the level of awareness relative to the potential implementation of Industry 4.0 relative to H&S in construction; case studies should be documented and shared; tertiary construction management education programmes should integrate Industry 4.0 into all possible modules, especially H&S-related modules, and continuing professional development (CPD) H&S should address Industry 4.0.
Taegeon Kim;Seokhwan Kim;Minkyu Koo;Minwoo Jeong;Hongjo Kim
국제학술발표논문집
/
The 10th International Conference on Construction Engineering and Project Management
/
pp.415-422
/
2024
Recent advances in construction automation have led to increased use of deep learning-based computer vision technology for construction monitoring. However, monitoring systems based on supervised learning struggle with recognizing complex risk factors in construction environments, highlighting the need for adaptable solutions. Large multimodal models, pretrained on extensive image-text datasets, present a promising solution with their capability to recognize diverse objects and extract semantic information. This paper proposes a methodology that generates training data for multimodal models, including safety-centric descriptions using GPT-4V, and fine-tunes the LLaVA model using the LoRA method. Experimental results from seven construction site hazard scenarios show that the fine-tuned model accurately assesses safety status in images. These findings underscore the proposed approach's effectiveness in enhancing construction site safety monitoring and illustrate the potential of large multimodal models to tackle domain-specific challenges.
베트남의 경제 성장률과 도시인구는 꾸준히 증가함에 따라 베트남의 인프라 개발 건설 시장 규모는 더욱 커질 전망이다. 그러나 인프라 개발을 위한 베트남 정부는 재정 및 행정 능력의 한계로 이러한 문제를 해결하기 위한 방안으로 PPP를 채택하고 있다. PPP는 10년 이상 지속되는 장기 사업으로 사업 실패 시 장기적 큰 피해가 될 수 있어 위험관리가 매우 중요하다. 본 연구에서는 리스크 관리에 대한 리스크 요인의 영향과 관리정도 분석에 SOM분석을 제안한다. SOM분석 방법은 시각화 분석으로, 각 리스크 요인의 색상 패턴을 통해 상관 분석이 가능하다. 본 연구는 SOM을 활용하여 베트남 PPP 사업의 위험요인의 우선순위를 결정하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.