USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage (기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰)

  • Jo, Seong-Min;Cho, Sung-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF

DEVELOPING U-CITY MARKET SCENARIOS THROUGH A SCENARIO PLANNING APPROACH

  • Yong-Ho Kwon;Jae-Jun Kim;Suk-Hee Han;Jin-Sik Kim;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.459-468
    • /
    • 2007
  • The u-City construction project has become a hot topic in the construction market because it seems economic value-added field for construction firms. However, construction firms don't willingly participate in the u-City construction market because environments of the future business for the u-City are very uncertain. Scenario planning is a very powerful method in managing this uncertain planning situation and is based on scenarios that help each enterprise appropriately adapt itself to its own business environments. Therefore it is based on the main principles of systems thinking and multiple futures. For the purpose of dealing with such uncertainties, this paper attempts to develop the possible market scenarios of the u-City construction market in S.Korea through a scenario planning approach. From this perspective, we considered various aspects of the u-City construction such as market demands, technology development, policy level and management environment. After considering the relevant issues, we identified the main trends and key uncertainties. Finally, we developed three coherent u-City construction market scenarios. Construction firms can use these scenarios as a basic reference for market analysis and business strategy. Therefore, this paper is able to enhance the participation of construction firms in the u-City construction market.

  • PDF

Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry

  • Kissi, Ernest;Adjei-Kumi, Theophilus;Badu, Edward
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.8-15
    • /
    • 2016
  • Cost planning practices in the construction industry worldwide has gained much popularity in recent times due to economic recession and stringent measures that various procurement laws prescribe in most developed and developing countries. Nevertheless, these practices in developing countries such as Ghana are constrained with the existence of critical barriers that render them non-effective and hence, accounting for the numerous abandonment of both private and public projects. Consequently, this study was enunciated with the aim to examine the critical barriers to the practice of effective cost planning in the Ghanaian construction industry. Through an in-depth literature review and a pilot survey, questionnaires were designed and administered to quantity surveyors. Data generated from the field survey was subjected to principal component analysis. The findings of the study revealed weak cost planning knowledge base, poor cost databases and understanding, inadequate designs and planning and external conditions are the major barriers to cost planning practices in the Ghanaian construction industry. The need for this study cannot be doubted since it provides an insight for experts in the construction industry on the barriers of the practice of cost planning in the industry. The awareness of these barriers will therefore facilitate efficient and effective efforts to resolve them. A future study is thereby proposed by this study to explore effective cost planning practices in the Ghanaian construction industry that will ensure private and public stakeholders get value for their money invested.