• 제목/요약/키워드: Construction monitoring system

검색결과 899건 처리시간 0.032초

GPS를 내장한 위치추적 데이터로거 시스템의 철도 계측 적용성 연구 (A Study of Monitoring Measurement using Global Positioning Digital Datalogger System for Railway Structures)

  • 이승원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2002-2007
    • /
    • 2010
  • The objective of this study is the developement monitoring measurement using global positioning digital datalogger system for monitoring measurement of railway construction sites. For the replacement of current passive data communication, Global positioning digital datalogger system using active communication is studied for the first time with in a country. Therefore data communication method and analyzing program of automatic measurement data is developed for the global positioning automatic digital datalogger system. The results of this study will be using real time automatic monitoring measurement of railway structures.

  • PDF

Validating the Structural Behavior and Response of Burj Khalifa: Synopsis of the Full Scale Structural Health Monitoring Programs

  • Abdelrazaq, Ahmad
    • 국제초고층학회논문집
    • /
    • 제1권1호
    • /
    • pp.37-51
    • /
    • 2012
  • New generation of tall and complex buildings systems are now introduced that are reflective of the latest development in materials, design, sustainability, construction, and IT technologies. While the complexity in design is being overcome by the availability and advances in structural analysis tools and readily advanced software, the design of these buildings are still reliant on minimum code requirements that yet to be validated in full scale. The involvement of the author in the design and construction planning of Burj Khalifa since its inception until its completion prompted the author to conceptually develop an extensive survey and real-time structural health monitoring program to validate all the fundamental assumptions mad for the design and construction planning of the tower. The Burj Khalifa Project is the tallest structure ever built by man; the tower is 828 meters tall and comprises of 162 floors above grade and 3 basement levels. Early integration of aerodynamic shaping and wind engineering played a major role in the architectural massing and design of this multi-use tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria established at the onset of the project design. Understanding the structural and foundation system behaviors of the tower are the key fundamental drivers for the development and execution of a state-of-the-art survey and structural health monitoring (SHM) programs. Therefore, the focus of this paper is to discuss the execution of the survey and real-time structural health monitoring programs to confirm the structural behavioral response of the tower during construction stage and during its service life; the monitoring programs included 1) monitoring the tower's foundation system, 2) monitoring the foundation settlement, 3) measuring the strains of the tower vertical elements, 4) measuring the wall and column vertical shortening due to elastic, shrinkage and creep effects, 5) measuring the lateral displacement of the tower under its own gravity loads (including asymmetrical effects) resulting from immediate elastic and long term creep effects, 6) measuring the building lateral movements and dynamic characteristic in real time during construction, 7) measuring the building displacements, accelerations, dynamic characteristics, and structural behavior in real time under building permanent conditions, 8) and monitoring the Pinnacle dynamic behavior and fatigue characteristics. This extensive SHM program has resulted in extensive insight into the structural response of the tower, allowed control the construction process, allowed for the evaluation of the structural response in effective and immediate manner and it allowed for immediate correlation between the measured and the predicted behavior. The survey and SHM programs developed for Burj Khalifa will with no doubt pioneer the use of new survey techniques and the execution of new SHM program concepts as part of the fundamental design of building structures. Moreover, this survey and SHM programs will be benchmarked as a model for the development of future generation of SHM programs for all critical and essential facilities, however, but with much improved devices and technologies, which are now being considered by the author for another tall and complex building development, that is presently under construction.

건설 공정 모니터링을 위한 모바일 증강현실 시스템 (Construction Management System using Mobile Augmented Reality)

  • 이석한
    • 디지털콘텐츠학회 논문지
    • /
    • 제18권5호
    • /
    • pp.977-982
    • /
    • 2017
  • 본 논문에서는 실시간으로 건설현장의 공정과정 및 작업 결과를 파악하고 모니터링 할 수 있는 시스템을 제안한다. 기존의 일반적인 건설현장 관리 및 모니터링의 경우 작업 현장의 영상을 작업자가 촬영한 후 이를 관리감독 본부에 직접 전송하여 작업의 진도나 작업결과 정확도에 대한 통제를 받는 오프라인 형식으로 진행된다. 이와 같은 모니터링 과정은 진행 방법의 특성상 많은 시간적 금전적 제약사항이 존재하며 신속한 의사결정 및 작업 현장과의 실시간 의사소통이 불가능하다는 단점이 존재한다. 이러한 단점을 최소화하기 위해서 본 논문에서는 증강현실 기술을 이용한 실시간 건설 공정 모니터링 시스템을 제안하였다. 그리고 최근 각광받는 스마트 모바일 장비를 기반으로 시스템을 구성함으로써 작업자의 사용성을 극대화하고자 하였다. 실험 및 구현 결과를 통하여 제안된 시스템의 효율성을 확인하였다.

항공 및 해상 관제기술 사례연구를 통한 건설장비 관제 시스템 활용 방안에 관한 연구 (Application of Construction Equipment Fleet Management System through the Case Study of Air and Vessel Traffic Control Technology)

  • 박지수;서종원
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.493-500
    • /
    • 2015
  • 최근 세월호사고와 관련하여 항공과 해상교통 관제센터의 중요성이 급격히 증가하고 있다. 항공, 해양 분야에서는 이미 모니터링과 관제 기술을 사용하고 있다, 하지만 복잡하고 위험한 건설현장 운영을 위한 모니터링과 관제 시스템은 아직 쓰이지 않고 있다. 모니터링/관제시스템의 역할은 건설현장에서 건설장비와 관제센터 간의 효율적인 의사소통을 요구하며, 정확한 시공과 건설현장에서의 위험요소 파악을 위한 방안을 제시해주는 역할을 필요로 한다. 따라서 본 연구는 건설장비 관제시스템의 개발을 위해 관제 시스템을 활용하고 있는 항공, 해양관제센터와의 비교를 통해 조종자와 관제센터간의 의사소통에 관하여 연구하고자 한다.

Small Unmanned Aerial System (SUAS) for Automating Concrete Crack Monitoring: Initial Development

  • Kang, Julian;Lho, B.C.;Kim, J.W.;Nam, S.H.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.310-312
    • /
    • 2015
  • Small Unmanned Aerial Systems (SUAS) have been gaining a special attention in the U.S. recently because it is capable of getting aerial footages conveniently and cost effectively, but also because of its potential threat to the safety of our society. Regarding the benefits, one can easily find successful cases. For example, remote controlled or pre-programmed unmanned aircraft help ranch owners monitor their livestocks or crop harvesting status cost-effectively without having to hire human pilots. The professionals in the construction industry also acknowledge the benefits they could gain from using SUAS. Some firms already use a small unmanned aircraft for monitoring their construction activities, which may help project managers figure out construction progress, resolve disputes in real time, and make proactive decisions for quality control. However, there are many technical challenges that my hinder the use of small unmanned aircraft in the construction industry. This paper explores opportunities and challenges in using unmanned aircraft to monitor concrete cracks on the surface of containment building in the nuclear power plant.

  • PDF

벤치마킹 분석을 통한 무인항공시스템 기반 시설물 상태 모니터링 프로세스 수립 연구 (Establishing Unmanned Aircraft System(UAS)-based Facility Condition Monitoring Process through Benchmarking Analysis)

  • 권진혁;김성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.101-102
    • /
    • 2022
  • The current facility condition monitoring has disadvantages such as a slow inspection cycle, a risk of human casualties, and the need for a lot of time and money as the size of the structure is larger, because human access is required with limited use. Drones can reduce the risk of human casualties due to their good accessibility, and can compensate for the shortcomings of the current method by enabling monitoring on a wide scale. The goal of this study is to provide the current domestic monitoring process through benchmarking according to the recent research case of the US Department of Transportation (DOT) to suggest a process suitable for the domestic situation and the direction of future improvement measures.

  • PDF

GIS 및 지구통계학을 이용한 실시간 통합계측관리 프로그램 개발 (Development of Real Time Monitoring Program Using Geostatistics and GIS)

  • 한병원;박재성;이대형;이계춘;김성욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.1046-1053
    • /
    • 2006
  • In the large scale recent reclaiming works performed within the wide spatial boundary, evaluation of long-term consolidation settlement and residual settlement of the whole construction area is sometimes made with the results of the limited ground investigation and measurement. Then the reliability of evaluation has limitations due to the spatial uncertainty. Additionally, in case of large scale deep excavation works such as urban subway construction, there are a lot of hazardous elements to threaten the safety of underground pipes or adjacent structures. Therefore it is necessary to introduce a damage prediction system of adjacent structures and others. For the more accurate analysis of monitoring information in the wide spatial boundary works and large scale urban deep excavations, it is necessary to perform statistical and spatial analysis considering the geographical spatial effect of ground and monitoring information in stead of using diagrammatization method based on a time-series data expression that is traditionally used. And also it is necessary that enormous ground information and measurement data, digital maps are accumulated in a database, and they are controlled in a integrating system. On the abovementioned point of view, we developed Geomonitor 2.0, an Internet based real time monitoring program with a new concept by adding GIS and geo-statistical analysis method to the existing real time integrated measurement system that is already developed and under useful use. The new program enables the spatial analysis and database of monitoring data and ground information, and helps the construction- related persons make a quick and accurate decision for the economical and safe construction.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Strengthen the Construction of Water Resources Monitoring Ability, Support the Strictest System of Water Resources management

  • Jiang, Yun-Zhong;Yi, Wan
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2012년도 학술발표회
    • /
    • pp.27-33
    • /
    • 2012
  • At present, the overall water resources monitoring ability in China is weak since there is an absence of a sound monitoring system and comprehensive monitoring information. In addition to the problem of weak management ability in monitoring, measurement and information, it can hardly meet the need of implementing the strictest management system of water resource and also restricts the practice of the system to some extent. The production states the necessity of further development of water resources monitoring ability and points out the concept of "One Country, One Account" for constructing water resources information. There is an analysis on the demand on further development of water resources monitoring ability and profound discussion about the strategies for supporting "three red-line" management.

  • PDF

제약이론을 적용하여 설계된 선각건조공정 모니터링 시스템 개발 (Development of Monitoring System for Hull Construction Processes Using TOC Analysis)

  • 윤훈희;신동목
    • 대한조선학회논문집
    • /
    • 제45권3호
    • /
    • pp.315-321
    • /
    • 2008
  • A large ship usually consists of 300 to 500 blocks, for which it is extremely difficult to monitor the whole manufacturing processes from assembly to erection. In an effort to unify all the data and procedures, shipbuilding companies are installing ERP systems, which have brought great improvement throughout the company as a whole. In some departments, however, the ERP systems are not being fully utilized. This paper analyzes and solves the problems revealed especially at the production departments after an ERP system is installed. In this research, firstly a TOC(Theory of Constraints) analysis is done to find out the best solution for those problems. Secondly, based on the solution found, a Monitoring System for hull construction processes is developed with an improved user interface. The visualization of data is designed to reflect the needs of the production departments. The new system supplements the ERP system in that it selectively utilizes the unified data base and is operated under ERP environment. The system is installed in the production departments and its usefulness is verified.