• Title/Summary/Keyword: Construction management procedure

Search Result 321, Processing Time 0.031 seconds

Development and Evaluation of Business Productivity of Construction Integrated Management System based on ERP System (ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가)

  • 백명종
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.163-180
    • /
    • 2001
  • New information technology contributes to raising of business productivity in many construction companies. The application of construction integrated management system is expected to save the time of decision-making in business management and shorten the closing account schedule. Construction Integrated Management System based on ERP(Enterprise Resource Planning) system allows to control core business procedure by monitoring technique on real-time. In this paper, we achieves 10% raise up business productivity in site business area, and 30% raise up business productivity in head of nce business area by means of DW-CIMS (Daewoo Construction Integrated Management System)

  • PDF

Development and Business Productivity of Construction Integrated Management System based on ERP System (ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가)

  • 한희석;백명종;배은화
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.127-140
    • /
    • 2001
  • New Information Technology Contributes to raising of Business Productivity in many Construction Companies. The Application of Construction Integrated Management System is Expected to Save the time of decision-making in Business Management and shorten the Closing Account Schedule. Construction Integrated Management System Based on ERP(Enterprise Resource Planning) System allows to Control core Business Procedure by Monitoring Technique on Real-time. In This Paper, We achieves 10% Raise up Business Productivity in Site Business Area, and 30% Raise up Business Productivity in Head Office Business Area by means of DW-CIMS (DAEWOO Construction Integrated Management System)

  • PDF

Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System (CRMS를 활용한 건설공사의 리스크관리 절차모형 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.423-432
    • /
    • 2010
  • This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management.

A Distributed Task Assignment Method and its Performance

  • Kim, Kap-Hwan
    • Management Science and Financial Engineering
    • /
    • v.2 no.1
    • /
    • pp.19-51
    • /
    • 1996
  • We suggest a distributed framework for task assignment in the computer-controlled shop floor where each of the resource agents and part agents acts like an independent profit maker. The job allocation problem is formulated as a linear programming problem. The LP formulation is analyzed to provide a rationale for the distributed task assignment procedure. We suggest an auction based negotiation procedure including a price-based bid construction and a price revising mechanism. The performance of the suggested procedure is compared with those of an LP formulation and conventional dispatching procedures by simulation experiments.

  • PDF

A Postal Transportation Planning Algorithm (우편물 기간운송계획 알고리듬)

  • 최지영;이경식;박성수;김진석;김혜규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.191-194
    • /
    • 2001
  • We consider a postal transportation planning in the transportation network of the form of hub and spoke. Given mail sorting centers and an exchange center, available vehicles and amount of mails to be transported between mail sorting centers, postal transportation planning is to make a transportation plan without violating various restrictions. The objective is to minimize the total transportation cost. To solve the problem, a tabu search algorithm is Proposed. The algorithm is composed of a route construction procedure and a route improvement procedure to improve a solution obtained by the route construction procedure using a tabu search. Computational results show that the proposed algorithm can solve practically sized problems within a reasonable time and the quality of the solution is acceptable.

  • PDF

PROBLEMS AND SOLUTION OF IDENTIFICATION AND APPROVAL OF PRIVATELY FINANCED INFRASTRUCTURE PROJECTS IN CHINA

  • Xiangrong Du;Tsunemi Watanabe
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.731-736
    • /
    • 2005
  • The governmental attitude toward private investment and financing for infrastructure projects has changed from the initial prohibition to the current encouragement in China, which has been embodied in the legal documents and administrative process. However, the problem of identification, bidding, and approval procedure for privately financed infrastructure projects has been observed in policies and administrative measures promulgated by different or even the same government branches, which is prohibitive factors for smooth project implementation. After analysis of the identification, bidding, and approval process of infrastructure projects, the authors proposed a simplified and alternative procedure and clarified the key points of relevant project documents.

  • PDF

DEVELOPMENT OF STATE-LEVEL APPRAISAL INDICATORS OF SUSTAINABLE CONSTRUCTION IN TAIWAN

  • Rong-Yau Huang;Wei-Ting Hsu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.292-298
    • /
    • 2011
  • In this study we examine Taiwan's overall performance in accordance with sustainable construction by developing an appraisal indicator framework. The framework consists of five layers, from bottom to top: the indicator; the indicator category; the core cluster; the theme; and the overall performance. The procedure for the development of a sustainable construction indicator system is outlined. Finally, a framework consists of 3 themes, 10 core clusters, and 33 indicator categories are established. Following the established framework, 67 proper indicators are selected for each category in the framework, and data of the 53 indicators are collected respectively from a nation's statistical databank in Taiwan. Sustainable construction index aggregated step-by-step from the indicators, the indicator categories, the core clusters and the themes is computed to assess Taiwan's progress in sustainable construction. The preliminary results and the discussion are reported.

  • PDF

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

STUDY ON STANDARIZATION OF ENFORCEMENT DESIGN IN UBIQUITOUS CITY (U-CITY) SYSTEM

  • Taewan Kim;Sung-Nam Hong;Changdu Son;Junhyun Park;Sun-Kyu Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1410-1413
    • /
    • 2009
  • A city development has been focused on solving a housing shortage of city resulted from rapid industrialization and population increase in city. However, such a development has caused many problems in environment, economy, safety, and so on. In recent, therefore, a new paradigm of a city development is required, and thus ubiquitous city (U-City) concept appears. U-City development, which combines construction method and IT technique, creates a new composite space, and help people improve quality of life in terms of solving many problems caused by existing method of a city development. However, there is no guide to build U-City up to date, and most present U-City projects have processed following past method of city development. Therefore, an objective of this paper is to suggest an explicit procedure of enforcement design in U-City system.

  • PDF