• 제목/요약/키워드: Construction management procedure

검색결과 321건 처리시간 0.028초

On condition based maintenance policy

  • Shin, Jong-Ho;Jun, Hong-Bae
    • Journal of Computational Design and Engineering
    • /
    • 제2권2호
    • /
    • pp.119-127
    • /
    • 2015
  • In the case of a high-valuable asset, the Operation and Maintenance (O&M) phase requires heavy charges and more efforts than the installation (construction) phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs), we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM) approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

함정 전투성능 신뢰성 보장을 위한 승조원 수 적절성 시험평가 제한점 및 시험평가 제도 개선방안 (A Study of Test and Evaluation Methods for Manpower of System of System)

  • 안병준;송정호
    • 시스템엔지니어링학술지
    • /
    • 제20권1호
    • /
    • pp.16-25
    • /
    • 2024
  • By deriving the limitations of the test evaluation, it was intended to suggest a plan to improve the test evaluation system for the appropriateness of the number of ship crews according to the design and construction of troops-saving ships. Currently, the number of crew members by ship type is confirmed and specified in the ROC(Operation Requirement Performance) in the early stages of design, such as conceptual design, but there is a limit to testing and evaluating the appropriateness of ensuring reliability of combat performance.

도로시설물의 자산관리를 위한 자산가치평가방법에 관한 연구 (A Study on Asset Valuation Method for Road Facilities Maintenance)

  • 안재민;박종범;이동열;이민재
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.141-151
    • /
    • 2012
  • 도로시설물은 국가 경제 활동의 기반을 형성하는 기초적인 시설물이며 국가에 필수적인 기반 시설물이다. 현재 국내 관리대상 도로시설물은 해마다 증가하고 있으며, 이에 따른 유지관리비 예산의 상승이 예상된다. 이와 같이 건설되어 축적된 도로시설물에 대한 비용 효율적 관리를 위해서는 자산이 지닌 가치를 객관적으로 나타낼 수 있는 지표가 필요할 것이다. 이러한 지표는 자산가치로써 화폐단위로 나타낼 수 있다. 국외에서는 자산관리 및 자산가치평가에 대한 연구가 활발히 진행되고 실제 공용중인 도로시설물에 적용을 하고 있지만 국내에서는 이에 대한 준비나 연구가 부족한 상황이다. 본 논문은 도로시설물의 자산관리를 위한 합리적인 자산가치평가를 도출하기 위한 방법으로 자산가치평가방법을 기존의 문헌과 연구 자료를 통하여 조사 및 정리를 하였다. 이를 바탕으로 도로시설물에 자산가치평가방법들을 적용하기 위하여 국내 실정과 특성이 반영된 자산가치 프로세스를 개발하였다. 개발된 자산가치 프로세스에 따라 실제 공용중인 도로시설물을 적용하고 그 결과를 분석하여 각 자산가치평가방법들의 활용방안을 도출하였다. 또한, 가장 활용성이 높은WDRC(Written Down Replacement Cost)방법을 이용하여 자산관리업무 수행 절차를 위한 자산 관리 업무지원 모식도를 제시하였다.

공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구 (A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment)

  • 윤우성;고성석
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.65-78
    • /
    • 2011
  • 건설사업은 복합, 중장기적인 사업특성상 프로젝트의 기획부터 시공 완료 단계까지 정확한 공사비 예측 및 확인, 정산 절차가 매우 중요하며, 기획에서 실시설계, 물량산출의 전 단계에 이르기까지 공사비와 관계된 리스크요인의 검토와 판단이 강조되고 있다. 그러나 공공주택의 입낙찰 금액의 심사 및 실행예산 편성 시 실적데이터에 의한 공사비 초과요인에 대한 검토와 조치, 공사비 리스크의 적절한 대응이 이루어지지 않고 있는 실정이다. 이에 본 연구에서는 2004년~2010년 준공분 공공주택 40개 현장의 준공정산서를 대상으로 세부공종별 실적공사비 항목을 사업초기 실행예산을 기준으로 비교하여, 실적공사비의 변동관계에서 나타나는 편차 및 변동 폭을 분석함으로써 불규칙적 공사비 리스크요인을 파악하고 정량적 분석을 실시하였다. 연구결과 연도별, 연면적별, 지역별, 공사금액별, 분양/임대방식별 다양한 공사비 리스크 요인 및 결과를 도출하였다. 연도별 정책과 경기 변동에 따른 공사비 리스크를 알 수 있었으며, 지역별, 연면적별 공사특성에 따른 공사비 리스크 항목을 도출하였다. 공사금액별 리스크 분석에서는 최저가낙찰제의 문제점을 알 수 있었으며, 공사비 초과 리스크 비중은 외주비와 자재비 항목에서 가장 크게 발생하는 것으로 나타났다. 직접공사비 중 외주비 리스크는 지붕공사와 타일공사가 높게 나타났고, 자재비 리스크는 철근, 시멘트가 높게 나타났다. 본 연구결과는 향후 공공주택 실행예산 편성 시 분류 방식에 따라서 공사비 리스크 검토 공종 및 관리요소 분석을 위한 자료로 활용할 수 있을 것으로 판단된다.

Design of Real-Time Monitoring System for Recycling Agricultural Resourcing Based on USN

  • Ji, Geun-Seok;Min, Byoung-Won;Oh, Yong-Sun;Mishima, Nobuo
    • International Journal of Contents
    • /
    • 제9권4호
    • /
    • pp.22-29
    • /
    • 2013
  • In this paper, we propose a integrated real-time monitoring system for recycling agriculture resourcing based on USN. We design and implement the monitoring system so that we can integrate the quality control of farmyard and liquid manures, barn environment monitoring, and positioning information control into a total management system performing recycling of excrement and manure. Selection of sensors and sensor-node construction and requirements, structure of wire/wireless communication networks, and design of monitoring program are also presented. As a result of operating our system, we can get over various drawbacks of conventional separated system and promote the proper circulation of excrement up to the farmyard. We confirm that these advanced effects arise from the effective management of the total system integrating quality control of farmyard/liquid manure, barn/farmhouse information, and vehicle moving monitoring information etc. Moreover, this monitoring system is able to exchange real-time information throughout communication networks so that we can construct a convenient information environment for agricultural community by converging IT technology with farm and stockbreeding industries. Finally we present some results of processing using our monitoring system. Sensing data and their graphs are processed in real-time, positioning information on the v-world map offers various moving paths of vehicles, and statistical analysis shows all the procedure from excrement occurrence to recycling and resourcing.

건축설계에서 BIM(Building Information Modeling) 적용에 관한 연구 -계획설계 BIM(Building Information Modeling) 프로세스를 중심으로- (A Study on the BIM Application in Architecture Design Phase - Focus on BIM(Building Information Modeling) Process for Schematic Design-)

  • 민영기;이재국
    • 한국디지털건축인테리어학회논문집
    • /
    • 제11권4호
    • /
    • pp.29-38
    • /
    • 2011
  • In this study, neighborhood facility and office building to target two cases were performed BIM process. In the initial design phase of the planning process was conducted for the BIM process modeling, BIM in the design stage while performing the required range and level of the process were studied. Accordingly, from architectural firms to leverage BIM process, the proposed methods, efficient use of the modeling process proposed. Quality management information and input for the modeling and design process should be determined from the initial design and construction, including, for each field should be considered BIM, which require an appropriate range of information, according to these requirements, BIM creation and expansion of the level of information should be clearly defined. Perform the procedure for BIM in the process of communicating with stakeholders is critical. In addition, the input data and output data needed to perform management and to perform at the level obtained BIM design process and the model should be clear.

FDS를 이용한 외장재의 수직 확산 화재의 모델링에 관한 연구 (A Study on the Modeling of Vertical Spread Fire of Exterior Panel by Fire Dynamic Simulation (FDS))

  • 민세홍;윤정은
    • 대한안전경영과학회지
    • /
    • 제11권2호
    • /
    • pp.77-85
    • /
    • 2009
  • Considering heat insulation and beautiful sight of construction, making use of exterior panels is increasing. Recently the exterior panels now are weak very much, and so in consequence of the weakness fire spreads rapidly. Compared with internal fire, external vertical fire spread rate goes rapidly and it is extensive in spread range, therefore it is dangerous very much. Accordingly, under present condition of poor standard of exterior panels, it is required to take measure to meet the appropriate situation. In this study, by making use of FDS(Fire Dynamic Simulation) program about external vertical fire of high rise building, fire behavior is searched by computer. It is important that realizing by computer fire modeling about external vertical fire must be included certainly in procedure of fire performance design in the future. In modeling program, FDS version 5 is available, and aluminium composite panel is applied in external panels. In this study, for realizing of actual fire condition, FDS is applied by details of fire scenarios considering influence of wind.

공간정보 처리를 위한 데이터베이스 미들웨어 구현 (Implementation of Database MiddleWare for Geospatial Data Processing)

  • 이진규;안기호;김태희;이형진;이용우
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2009년도 춘계학술발표회 논문집
    • /
    • pp.145-150
    • /
    • 2009
  • 본 논문은 차세대 수치지도 구축을 위해 지형정보 처리를 위한 미들웨어의 구현에 대한 논문이다. 구현되는 미들웨어는 분산된 이기종 공간데이터베이스를 기반으로 하여 이들간의 분산 트랜잭션 처리, 비 표준화 상태의 공간데이터의 처리, 글로벌 스키마 관리, UFID를 기반으로한 객체 관리와 분산된 대용량 데이터를 처리할 수 있는 기능을 가지고 있다. 또한, 사용자의 필요한 로직을 구현을 할 수 있도록 Corba와 RMI를 활용한 분산 인터페이스를 제공하여, 사용자 프로시져의 생성, 유지 및 호출을 할 수 있는 기능을 가지고 있다. 본 논문에서는 이기종 공간 데이터 저장소를 이용한 대용량 수치지도 관리에 적합한 분산 객체형 데이터베이스 미들웨어 구현에 대해 설명한다.

  • PDF

What Factors Do Government Subsidy Programs Care about for Inter-Firm Collaboration? Priortization of Evaluation Criteria of Small Business Collabortation Grant, Korea

  • SHIN, Woo-Jin;KANG, Minsu;YANG, Dongwoo
    • 한국프랜차이즈경영연구
    • /
    • 제13권1호
    • /
    • pp.1-17
    • /
    • 2022
  • Purpose: In this study we aim to identify factors affecting successful inter-firm collaboration. We tried to find out whether government subsidies to small-business owners should be made to experienced and competent cooperatives or to cooperatives with potential even if inexperienced. Research design, data and methodology: Using analytic hierarchy process (AHP), we examine if evaluation criteria for the Small Business Collaboration Grant (SBCG) reflect the potential of successful collaboration of applicant cooperatives. Results: We found that experts tend to think that applicant cooperatives without any experience as a recipient for the SBSG need to be evaluated by their growth potential and their preparation of the application rather than by their business performance or achievement history. The weight of the evaluation must be different between the growth potential and the achievements already achieved. By means of an expert survey, we confirmed that Rookies should weigh evaluation indicators that can reflect their growth potential, and experienced groups should give weight to evaluation indicators that can reflect their achievements. Conclusions: For SBCG applicants with experiences, experts tend to weigh more on SBCG business performances and feasible sharing systems. The screening procedure for the first applicant cooperatives need to focus more on "partner selection" stage, whereas elements related to "realization" apply to experienced applicant cooperatives.

양방향 LSTM과 데이터 조합탐색 및 딥러닝 관련 기법을 활용한 철근 가격 단기예측에 관한 실험적 연구 (Experimental Study on the Short-Term Prediction of Rebar Price using Bidirectional LSTM with Data Combination and Deep Learning Related Techniques)

  • 이용성;김경환
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.38-45
    • /
    • 2020
  • 본 연구는 양방향 LSTM, Random Search, 데이터 조합, Dropout을 이용한 철근 가격 단기예측 딥러닝 모델을 개발하는 체계적인 절차를 제시한다. 일반적으로 사용자가 직관적으로 이러한 값을 결정하여 예측성능이 우수한 결과를 탐색하는데 시간이 많이 걸리고 반복적인 시도를 하게 되는데, 이러한 시도로 찾아낸 결과가 우수하다고 보장할 수 없다. 본 연구에서 제시하는 제안된 접근방식으로 단기 가격예측의 평균 정확도는 약 98.32%이다. 그리고 이 방식은 철근 이외의 건축재료를 비롯하여 통계기반의 시계열 데이터로 가격을 예측하는 연구에서 본 연구에서 제시한 내용이 우수한 예측결과를 도출하기 위한 기초적 자료로 활용될 수 있을 것이다.