• Title/Summary/Keyword: Construction management procedure

Search Result 321, Processing Time 0.032 seconds

Decision Making Methodology on Ventilation System for Road Tunnels Based on Multi-Attribute Utility Theory (다속성 효용이론을 활용한 터널환기방식 선정)

  • Lee, Hye-Jin;Kang, Sang-Hyeok;Park, Won-Young;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.106-115
    • /
    • 2007
  • The size and length of road tunnels have been gradually expanded as industry developed. Consequently, the risk has been increased. The decision making process for ventilation system for road tunnels involves a large amount of information on economic feasibility, construction methods, and safety etc. In situation where systematically structured decision making process is unavailable, almost decisions about ventilation systems are made based on engineers' private knowledge and experiences. Procedure and criteria to choose the best optimized ventilation system among many alternatives are proposed, breaking away from the economic dependency-oriented decision making. This paper presents a Multi-Attribute Utility Theory and AHP based function with which planners can calculate overall utility of each alternative. It is anticipated that the effective use of the proposed methodology for decision making on ventilation systems ould be able to reduce the likelihood of the occurrence of potential safety risks as well as increase the overall ventilation performance.

A Study on the Procedures and Application Examples for Establishment of Master Plan Standard for the Utility Tunnel (공동구 기본계획 기준수립을 위한 절차 및 적용사례에 대한 연구)

  • Oh, Wonjoon;Cho, Choongyeun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.100-107
    • /
    • 2020
  • In this paper, a study was conducted on the method of establishing the master plan standard for rational decision-making about utility tunnel construction in the existing urban. In the previous study, the optimal route was selected by the feasibility assessment. However, in order to increase the objectivity of the installation conditions of the utility tunnel in the master plan standard, comprehensive evaluation of the results by feasibility and economics analysis calculates the overall ranking for all sections analyzed. In addition, based on the results of the comprehensive evaluation, a method for establishing a mid·long term investment plan was introduced after reviewing the project to be conducted in the region. Additionally, in order to review the establishment of the standard suggested in the paper, an analysis was conducted by applying the master plan procedure to the northwestern urban zone of seoul.

A Study on Dispute Claim to the Apartment Reconstruction Projects (공동주택 재건축 사업의 분쟁 클레임에 관한 연구)

  • Lee, Mi-Ae;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.268-273
    • /
    • 2008
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.

  • PDF

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.2
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

A Study on the Estimation of Remodeling Method by Focused on Apartment House User's Request (공동주택 사용자 중심의 리모델링 방법 평가에 관한 연구)

  • Yoo, In-Geun;Kim, Chun-Hag;Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.211-222
    • /
    • 2004
  • Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.

A Study on the Priority Ranking Algorithm for Bridge Management at Network Level (Network Level을 고려한 교량의 우선순위 산정 알고리즘에 관한 연구)

  • Kim Kwang-Soo;Kim Hyeong-Yeol;Park Sun-Kyu
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.3 s.87
    • /
    • pp.323-328
    • /
    • 2005
  • Bridge structures are properly designed in accordance with the design specifications with required safety margin. However, due to the heavy vehicle traffic and environmental attacks, bridge often requires repairs and the deteriorated one should be replaced or rehabilitated. In this paper, a prior ranking algorithm is proposed to assist a decision making process in bridge management at network level. Based on the literature survey for the existing studuies, two important factors which affect the decision making procedure for bridge management at network level are identified. These factors are implemented into the algorithm as a load carrying capacity function and traffic function, respectively.

The Study on the Character and Formation of the Honjeon during the Reign of Sukjong in Joseon Dynasty - Centering on Munjeongjeon in ChangkyeongGung - (조선조 숙종대 혼전조성과 그 특징에 관한 연구 - 창경궁 문정전을 중심으로 -)

  • Shin, Ji-Hye
    • Journal of architectural history
    • /
    • v.19 no.3
    • /
    • pp.31-49
    • /
    • 2010
  • This study intends to look into management and architectural space composition of Honjeon during the reign of Sukjong. Also it purposes to inspect how to affect management of the Royal Palace. The study is based on each Binjeon Honjeon Dogam Eugwe between late 17C and 18C. And the data on management of the Royal Palace is based on Joseonwangjosillok and Seungjeongwon Ilgi. Because Sukjong used ChangDeokgung and GyeongDeokgung alternately, Honjeon located at Munjeongjeon of ChangGyeonggung during Sukjong stayed at ChangDeokgung and located at Gyesangdang of GyeongDeokgung during Sukjong stayed at GyeongDeokgung. At that time, often movement of the King modified procedure of moving Honjeon. Between the first year of Hyenjong and the 9th year of Sukjong, architectural space of Honjeon was settled. In 1659, territory of Jeongjeon was settled. Also between 1674 and 1684, Goklimcheong was built. Construction of Goklimcheong is noticeable character. As Munjeongjeon was being used as Honjeon continually, it was recognized as Honjeon. Due to its long utilization as Honjeon, several gonvernment offices were transferred. Also it influenced utilization of Myeongjeongjeon.

A Study on Comparison of Density Test Methods for Quality Control of Cement and Mineral Admixture (시멘트 및 혼화재의 품질관리를 위한 밀도 시험방법 비교 연구)

  • Jae-Seung, Lee;Sang-Kyun, Noh;Cheol, Park;Hong-Chul, Shin
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.435-442
    • /
    • 2022
  • In this study, the density of KS L 5110 was compared with that of gas pycnometer and electronic densimeter for efficient density management of cement, blast furnace slag powder and fly ash. Correlation and usability according to the test method were reviewed, and based on the results of the experiment, the availability of alternative test methods was analyzed. As a result of the density test according to test methods, the density of cement, blast furnace slag powder and fly ash tended to decrease in the order of gas pycnometer, KS L 5110 and electronic densimeter. Because the volume range of the sample to be evaluated is different depending on test methods. The coefficient of determination R2 was in the range of 0.71 to 0.93, and the correlation according to test methods showed a relatively good correlation. If correction is applied through correlation, it is analyzed that alternative test methods can be used. As a result of the usability review considering the test procedure, measurement time and coefficient of variation, the gas pycnometer had the simplest test procedure and good reliability. In addition, it is expected that the reproducibility between the testers is relatively high because the skill is not greatly required.

Development of Bridge Management System for Next Generation based on Life-Cycle Cost and Performance (생애주기 비용 및 성능을 고려한 차세대 교량 유지관리기법 개발)

  • Park, Kyung-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.167-174
    • /
    • 2007
  • This study proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the and the life-cycle cost and performance as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

  • PDF

An Analysis of evaluations of Exhibition Design for Cheongju International Craft Biennale (청주국제공예비엔날레 전시회장 조성에 관한 평가와 분석)

  • Cho, Young-Youn;Lee, Kang-Hoon
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.6
    • /
    • pp.60-68
    • /
    • 2009
  • Cheoungju International Craft Biennale is not just an art exhibition but more like a pubic festival which is including an experiential learning and a public participation section as well as a special exhibition and an international competition section. Thus it is strongly required to present an appropriate meaning and mood corresponding to each exhibition hall. The paper has examined the exhibition topics during the last 10 years and the plannings and contents to install the exhibition hall according the yearly topic and it has analyzed the comprehensive evaluations after the exhibition. The research scope is limited to the part related to the exhibition hall and facilities, which is including calculation of dimensions and layout, access and movement system, the appropriateness of the design and construction period, measure of applied technology appropriateness, post management as well as planning intent, estimation of the number of the visitors, preliminaries. With the results shown in the comprehensive evaluation and analysis, the paper has presented two issues, the one related to the procensure and preparation and the other related to the facilities. It is showed that both problems are due to the lack of expertise and it is necessary for the experts to participate from the first step of the procedure including planning for the successful exhibition. For the appropriate exhibition hall corresponding to the exhibition planning and scale, it is required to have the professional considerations of successful space and visitor's movement management, display environment, construction method, and post management. The study presents that architectural and interior design have to take an active part in constructing exhibition design in overall stage including the initial, practice, and evaluation stage.