BIM-based Lift Planning Workflow for On-site Assembly in Modular Construction Projects

  • Hu, Songbo;Fang, Yihai;Moehler, Robert
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.63-74
    • /
    • 2020
  • The assembly of modular construction requires a series of thoroughly-considered decisions for crane lifting including the crane model selection, crane location planning, and lift path planning. Traditionally, this decision-making process is empirical and time-consuming, requiring significant human inputs. Recently, research efforts have been dedicated to improving lift planning practices by leveraging cutting-edge technologies such as automated data acquisition, Building Information Modelling (BIM) and computational algorithms. It has been demonstrated that these technologies have advanced lift planning to some degree. However, the advancements tend to be fragmented and isolated. There are two hurdles prevented a systematic improvement of lift planning practices. First, the lack of formalized lift planning workflow, outlining the procedure and necessary information. Secondly, there is also an absence of a shared information environment, enabling storages, updates and the distribution of information to stakeholders in a timely manner. Thus, this paper aims to overcome the hurdles. The study starts with a literature review in combination with document analysis, enabling the initial workflow and information flow. These were contextualised through a series of interviews with Australian practitioners in the crane-related industry, and systematically analysed and schematically validated through an expert panel. Findings included formalized workflow and corresponding information exchanges in a traditional lift planning practice via a Business Process Model and Notation (BPMN). The traditional practice is thus reviewed to identify opportunities for further enhancements. Finally, a BIM-based lift planning workflow is proposed, which integrates the scattered technologies (e.g. BIM and computational algorithms) with the aim of supporting lift planning automation. The resulting framework is setting out procedures that need to be developed and the potential obstacles towards automated lift planning are identified.

  • PDF

A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project (효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구)

  • Joo, Sang-Hyun;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.96-110
    • /
    • 2008
  • Differing from civil engineering and construction, landscape architecture projects are far from efforts in operation and project management. Under the circumstances, it is worthwhile to adopt scope definition from project management for construction and civil engineering in some respects. First, scope definition is able to be conducted through a simple procedure without additional investment in capital and time. Second, the output produced by scope definition is very substantial. The research scrutinized scope definition procedures accompanied by landscape architecture project execution and derived various methods in order to help scope definition for efficient landscape architecture projects. Based on the literature review, a design case study, and an exert interview, the project success elements were developed consisting of 3 sections, 8 categories and 50 elements, grounded on the theoretical base of PDRI. The elements are expected to pave a way to an adequate level of scope definition among participants of landscape architecture projects and contribute in efficient project execution.

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

The Strategy for the Advancement of Groundwater Management in Korea (국내 지하수 통합관리 선진화 전략)

  • Kang, Sunggoo;Kim, Jiwook;Choi, Yongjun;Park, Minyoung;Park, Hyunjin;Lee, Jinkwan
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.2
    • /
    • pp.36-40
    • /
    • 2022
  • To respond to rapidly changing water circumstances such as climate change, drought, etc., the korean government (MOE) established four advanced strategies for integrated groundwater management. The first strategy is watershed-based management of groundwater. The second strategy is total quantity management of groundwater including improvement of groundwater preservation area policy and procedure of investigation for groundwater influence area, additional construction of groundwater dam, installation of large-scale public wells, extention of spilled groundwater use. The third strategy is prevention of groundwater contamination including expansion of monitoring wells, introducing declaration of groundwater contamination. The last strategy is advancement of groundwater information management including integrated management of data, setting up a big-data based open platform. The above-mentioned four strategies will be reflected in the 4th National Groundwater Management Plan to secure implementation power, and it is expected to laid the foundation for advanced and rational groundwater management system.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

Development of Building Monitoring Techniques Using Augmented Reality (증강현실을 이용한 건물 모니터링 기법 개발)

  • Jeong, Seong-Su;Heo, Joon;Woo, Sun-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.3-12
    • /
    • 2009
  • In order to effectively distribute the resources, it is very critical to understand the status or progress of construction site quickly and accurately. Augmented Reality (AR) can provide this situation with information which is convenient and intuitive. Conventional implementation of AR in outdoor or construction site condition requires additional sensors or markers to track the position and direction of camera. This research is aimed to develop the technologies which can be utilized in gathering the information of constructing or constructed buildings and structures. The AR technique that does not require additional devices except for the camera was implemented to simplify the system and improve utility in inaccessible area. In order to do so, the position of camera's perspective center and direction of camera was estimated using exterior orientation techniques. And 3D drawing model of building was projected and overlapped using this information. The result shows that by using this technique, the virtual drawing image was registered on real image with few pixels of error. The technique and procedure introduced in this paper simplifies the hardware organization of AR system that makes it easier for the AR technology to be utilized with ease in construction site. Moreover, this technique will help the AR to be utilized even in inaccessible areas. In addition to this, it is expected that combining this technique and 4D CAD technology can provide the project manager with more intuitive and comprehensive information that simplifies the monitoring work of construction progress and planning.

Reengineering of TACT Process Management Analyzed on Task Information (업무정보 분석을 통한 TACT공정관리 프로세스 재설계)

  • Kim, Ok-Kyue;Park, Jun-Mo;Kim, Beop-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.113-124
    • /
    • 2012
  • TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.

A Study on the Realization of Infrastructure for Electronic Trade (전자무역 기반사업의 구현에 관한 연구)

  • Lee, Bong-Soo
    • International Commerce and Information Review
    • /
    • v.12 no.1
    • /
    • pp.55-73
    • /
    • 2010
  • The thesis examines new innovation of various aspect to overcome lots of problems which come by when we execute simplification of trade procedure and administration fairly. Practical implications regarding the innovation of electronic trade infrastructure are as follows. First, it will propel the standardization of electronic trade section in the technical side and the construction atmosphere of international authentication system must be created. The work process should be redesigned in order to implement export-import procedures that meet the relevant standards. Second, the improvement of system for electronic process is necessary in the law and institutional aspect. In order to eliminate any obstacles to the trade procedure, clearer legal grounds regarding legitimate controls and minimum necessity must be established. Also, laws should be revised to admit mutual recognition among certification organizations, in lieu of international agreement-based mutual recognition between government. Third, the detailed improvement for the integration of the electronic trade infrastructure will be demanded. Additionally, user-centered quality management protocols should be established via connections with the systems already existing in governmental bodies. Fourth, various trade institution should harmonized and interconnected with other partners through mutual cooperation for standardization of operational system. A system which can monitor and remotely diagnose and resolve system errors should be established to provide tailor-made service and improve operational efficiency. At the same time, it is necessary to build a cooperative system to share information and promote comprehensive management for efficient operation.

  • PDF

A Tabu Search Algorithm for the Vehicle Routing Problem with Time Window and Dock Capacity Constraints (시간제약과 하역장 용량제약이 있는 차량경로문제에 대한 타부탐색 알고리즘)

  • Zang Heejeong;Lee Kyungsik;Choi Eunjeung;Park Sungsoo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.4
    • /
    • pp.45-60
    • /
    • 2005
  • We consider a vehicle routing problem with time window and dock capacity constraints (VRPTD). In most traditional models of vehicle routing problems with time window (VRPTW), each customer must be assigned to only one vehicle route. However demand of a customer may exceed the capacity of one vehicle, hence at least two vehicles may need to visit the customer We assume that each customer has Its own dock capacity. Hence, the customer can be served by only a limited number of vehicles simultaneously. Given a depot, customers, their demands, their time windows and dock capacities, VRPTD is to get a set of feasible routes which pass the depot and some customers such that all demands of each customer are satisfied Since VRPTD is NP-hard, a meta-heuristic algorithm is developed. The algorithm consists of two Procedures : the route construction procedure and the route scheduling procedure. We tested the algorithm on a number of instances and computational results are reported.