• Title/Summary/Keyword: Construction management procedure

Search Result 321, Processing Time 0.029 seconds

Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia

  • Banawi, Abdul-Aziz;Bilec, Melissa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Over the last decade, Saudi Arabia has experienced significant economic increases as evidenced by the 30% growth in its gross domestic product; furthermore, the construction industry has increased 10% in the same time period. Due to this significant growth, the construction industry is encountering issues related to construction quality resulting in significant waste and associated environmental impacts. In this research, we applied our previously developed framework that integrates three different methods-Lean, Green, and Six-sigma - to a residential construction complex in Saudi Arabia. Our aim of this case study was to explore the application of the framework in practice to glean quantitative results and further validate the framework. In the case study, we used the developed framework to identify a significant issue related to quality and delays - final completion of 53 residential units was delayed because of failed exterior buildings surfaces. We then used the framework to define the causes behind the defects via a field investigation of the 53 units. Of the defect, construction execution was responsible for 43% of the defect, 31% untrained workers, 19% unfavorable construction weather condition, with 7% accounting for other issues. A procedure was developed in concert with the construction manager and overall developer reducing the amount of rework and waste causes revealed by the field examination and the framework. Although two steps were added to the original construction process to overcome waste causes, still save a lot of resources and reduces environmental impact. In summary, we found that the Lean, Green, Six-sigma framework increased productivity, quality, and reduced waste.

A Study of Process Modeling Method for Construction Business Process Reengineering (건설분야 BPR 수행을 위한 프로세스 모형화 기법 연구)

  • Kwak, Joong-Min;Park, Seo-Young;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.80-88
    • /
    • 2010
  • The construction industry concentrates their efforts on construction information technology (IT) including construction CALS. However, the actual circumstances for construction IT focuses on building hardware and it neglects importance of business process reengineering (BPR) for construction tasks. A systematic process modeling method and a computerized model by process concept need for building construction BPR. This study develops a generalized BPR procedure for construction projects, and then suggests a new process modeling method for construction BPR that consists of object-related process model (ORPM). Finally, this study develops a web-based ORPM Builder (ORPMB) based on the ORPM methodology, and the applicability of the developed system is verified by a case study with practical construction processes.

Cause Analysis and Reduction of Safety Accident in Modular Construction - Focusing on Manufacturing and Construction Process - (모듈러 건축에서의 안전사고 원인 분석 및 저감방안 - 제작 및 시공단계 작업을 중심으로 -)

  • Jeong, Gilsu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang;Kim, Hyunsoo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.8
    • /
    • pp.157-168
    • /
    • 2019
  • Modular Construction is regarded as having enhanced safety compared to traditional construction since most of modular manufacturing process in plants. Unlike general consideration for safety in modular construction, several industrial accident data and studies have pointed out that the accident rate of modular construction is not enough less as much as the practitioners have expected. It means that there is a clear need for improvement of safety management in modular construction. To enhance safety, it is necessary to identify the type and cause of accident through accident cases in order to prevent safety accident in advance. In this consideration, this study analyzed the types and causes of accidents through root cause analysis procedure with accident cases of U.S. OSHA. The classification was carried out in the order of process type, accident type and cause of accident. By following the classification criteria in this study, the causal factor was derived and the root cause map was created. Based on the analysis results, cross-analysis was conducted and it is shown that activity characteristics of modular construction are related to safety accidents. In addition, prevention methods to reduce safety accident by major activity are presented in terms of organizational, educational and technical aspects. This study contributes that the result can be used as the basic safety management in the manufacturing and construction process of modular construction.

A Study on Inventory of Cut-Slope using the Mobile PC (Mobile PC를 이용한 절토사면 현황조사에 관한 연구)

  • Rhee, Jong-Hyun;Kim, Seung-Hee;Kim, Seung-Hyun;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.813-820
    • /
    • 2008
  • We have developed inventory database program which is available in the mobile PC. The mobile PC is convenient in terms of portability, data input, modification, practicality of various program and data confirmation in site. By utilizing the inventory database program in mobile PC, we are able to complete database in site. Then, database is converted into the Hangul document and Excel worksheet. Also, based on the above procedure, effective management and utilization of inventory on cut-slope can be achieved.

  • PDF

Selection Method of Remodeling Based on User Request (사용자 요구에 따른 공동주택 리모델링 선정방법)

  • Lim, Jae-Hyun;Yun, Yer-Wan;Yang, Keek-young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.119-123
    • /
    • 2003
  • Lately Construction industry tends to prefer remodeling of existing building rather then new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. Specially in case of Apartment houses, since vagueness on ownership and management authority on common part exists. So in this study we are to present the procedure of analyzing apartment house remodeling method through user request by approaching to several considerable factors in user request side.

  • PDF

The Case Study for Application of Discord Management System In Railway Construction Projects (철도건설 사업 갈등관리체계 적용사례 연구)

  • Roh, Byoung-Kuk;Lim, Kwang-Man;Kim, Yong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1514-1522
    • /
    • 2006
  • This study has described the case that has been experienced personally by centering on discords created in railway construction projects while performing practical duties at the construction field. Accordingly, as seen from the experience of performing one method called discord reconciliation conference, it seems that there are many parts to be improved on for the particular details because the conference was progressed by the position of a non professional in its content or procedure. But as seen from the word origin called "discord", looking at the state of finding one solution after another from vagueness of solving difficult and entangled problems, we could sense that the sincere communication and honesty was more progressive method in the phase of looking for one solution after another. Although this essay was centered on a typical case of railway construction project, I hope for it to spread throughout the whole society and especially hope that many discords created in public work sites such as public works would become settled smoothly between the parties concerned.

  • PDF

Improvement plan for Function Definition using CAFAT in the Construction VE (건설 VE에서 CAFAT을 이용한 기능정의 개선방안)

  • Choi, Chang-Hoon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.102-111
    • /
    • 2006
  • In the analysis of function, which is the core and early phase among the procedure of construction VE Job Plan, the accuracy of function definition directly connects to VE result. However, the method of defining function, which is currently used is not accurate and comprehended or is difficult to utilize it systematically. Also, there is not a clear definition about the function for selecting VE so that many difficulties occur in the organic connection between each of functions in the summarization of function after defining function. Therefore, this study cleared the definition of function and made up any counter measured problem occurred in FAST Diagram later on and suggested CAFAT(Combined Antithetic Function Analysis Technique) in order to induce better phase in functional analysis.

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

Mass curve Calculation of Constructed Section using GIS (지형공간정보시스템을 활용한 기시공 단면의 토적계산)

  • Lee, Yang-Kyoo;Bae, Sang-Ho;Han, Jung-Geun;Kang, Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.739-742
    • /
    • 2007
  • For the mass evaluation on the earth cutting volume, Geographic information system(GIS) based on digital topographical map executed on the ground condition in presents states and after installing utilities, and making visual decision. This study presents that the general reviews considering economical, technological efficiency as well as natural factors was carried. To the rational examines about plan and procedure of development was approved, the geographical analysis was performed that was based on the topographical shape before construction and the field states after construction, which will be utilized more useful data for mass curve calculation.

  • PDF

The Development of a Haptic Interface for Interacting with BIM Elements in Mixed Reality

  • Cho, Jaehong;Kim, Sehun;Kim, Namyoung;Kim, Sungpyo;Park, Chaehyeon;Lim, Jiseon;Kang, Sanghyeok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1179-1186
    • /
    • 2022
  • Building Information Modeling (BIM) is widely used to efficiently share, utilize and manage information generated in every phase of a construction project. Recently, mixed reality (MR) technologies have been introduced to more effectively utilize BIM elements. This study deals with the haptic interactions between humans and BIM elements in MR to improve BIM usability. As the first step in interacting with virtual objects in mixed reality, we challenged moving a virtual object to the desired location using finger-pointing. This paper presents the procedure of developing a haptic interface system where users can interact with a BIM object to move it to the desired location in MR. The interface system consists of an MR-based head-mounted display (HMD) and a mobile application developed using Unity 3D. This study defined two segments to compute the scale factor and rotation angle of the virtual object to be moved. As a result of testing a cuboid, the user can successfully move it to the desired location. The developed MR-based haptic interface can be used for aligning BIM elements overlaid in the real world at the construction site.

  • PDF