• Title/Summary/Keyword: Construction management procedure

Search Result 321, Processing Time 0.034 seconds

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

A Study on the Improvement of Pfocedure Management in the Painting Works (전문건설업체의 업무관리절차 개선에 관한 연구 - 공사단계별 도장공사 참여를 중심으로 -)

  • 송천수;임상모;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.153-156
    • /
    • 2003
  • Recently, as changing construction environment, we have come to need rational systematic and transparent in construction industry. In other to consider application possibility of CM in specialty construction, in this study improvement of procedure management by several construction phases in the coating with paint work.

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

KNOWLEDGE MANAGEMENT DEVELOPMENT PROCEDURE AND ITS INTRODUCTION PLAN FOR CONSTRUCTION COMPANY

  • Ji yun Lee;Young woong Song;Yoon ki Choi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1199-1202
    • /
    • 2005
  • Knowledge has been considered one of the important elements that determine our future. Competitive power of an enterprise has also been transformed from labor, capital, and technology-oriented to knowledge-oriented. Current construction environment is experiencing overall decrease of number of construction contracts due to opening of domestic construction market and economic slump, problems on methods of receiving orders/bidding, and change of costumers' attitude, which intensify competition, therefore many companies consider adopting knowledge management to secure their competitive power. However, there are difficulties in adopting knowledge management and increasing the use by establishing management plan, Performance Measurement, and knowledge maintenance system in reality. Therefore, this study is to provide assistance to successful realization of knowledge management by suggesting development plan of knowledge management that enables knowledge management more efficient with certain goals.

  • PDF

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

On the Construction of Initial Basis in the Simplex Method (단체법에서 효과적인 초기기저의 설정)

  • 임성묵;김기태;박순달
    • Korean Management Science Review
    • /
    • v.17 no.2
    • /
    • pp.13-20
    • /
    • 2000
  • In this research, we compare and analyze the two initial basis construction procedures: LPAKO’s procedure proposed by Seo et. al. and symbolic crash procedure proposed by Maros et. al.. Based on the analysis, we present a new procedure which complements the previous procedures. The new procedure shows superiority to the previous procedures with respects to the optimality of initial basis. Also, the linear basis Also. the initial basis constructed by the new procedure reduces the number of simplex iterations.

  • PDF

A Basic Study for Accumulating Scheduling Knowledge-Base (공정관리 지식기반 구축을 위한 기초적 연구)

  • Jang Se-Han;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.83-91
    • /
    • 2001
  • Generally the level of accumulating scheduling knowledge-base in Korean construction companies is in the scheduling knowledge-base infrastructure construction phase and Even in top 10 construction companies, the level is in early scheduling knowledge activity phase. The principle causes of this situation are unawareness of importance to scheduling knowledge and absence of procedure related to scheduling knowledge-base. This research analyzes the problems to accumulate scheduling knowledge-base in Korean construction companies and proposes a procedure model to accumulate scheduling knowledge-base property, which adds items of scheduling knowledge-base infrastructure and scheduling knowledge activity to the existing scheduling procedures of Korean construction companies. Using procedure model for accumulating scheduling knowledge-base, Korean construction companies can develop a new scheduling procedure and accumulate scheduling knowledge accordingly. If scheduling knowledge were accumulated property according to the procedure, a framework for knowledge management system could be provided.

  • PDF

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.