• Title/Summary/Keyword: Construction lift

Search Result 158, Processing Time 0.025 seconds

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Applications of Construction Sequence Analyses to Prototype Models of Twisted Tall Buildings (비틀림 초고층 프로토타입 모델에 대한 시공단계해석의 적용)

  • Choe, Mi-Mi;Kim, Jae-Yo;Eom, Tae-Sung;Jang, Dong-Woon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.1
    • /
    • pp.89-97
    • /
    • 2013
  • With regard to complex-shaped tall buildings whose plans and constructions have been gradually on the increase, this study was aimed to analyze their structural behaviors during construction by applications of construction sequences analyses to prototype models. For twisted tall buildings, total 18 models of with three conditions of a lateral load-resisting system, a twisting angle, and a construction method were selected. A diagrid system and a braced tube system were applied as a lateral load-resisting system. For each lateral load-resisting system, three types of plan with $0^{\circ}$, $1^{\circ}$, and $2^{\circ}$ twisting angles and three construction methods with construction sequences of exterior tube and interior frame were assumed. The structural performances of tall buildings under constructions were analyzed with results of lateral displacements from construction sequence analyses. Also, construction performances of the construction period and the maximum lift weight were compared.

A Study on Combustion Experiments of Color Nonwoven (칼라 부직포의 연소실험에 관한 연구)

  • Min, Se-Hong;Im, Sang-Bum
    • Fire Science and Engineering
    • /
    • v.25 no.3
    • /
    • pp.99-106
    • /
    • 2011
  • Experiments of Cone calorimeter test and Lift spread flame apparatus test are carried out in order to appraise fire hazard in color nonwoven used mostly on the spot in construction works. As the result, in color nonwoven combustibility is discovered not firing flame in surface, but firing under state of combustible gas occuring in the state of melting. In the case of Lift spread flame apparatus test, color nonwoven is very brittle which almost no flame spread owing to contracting and break by firing strength. The following data are agree with basis: total heat release is 2.66 MJ/$m^2$, limited combustible material (10 min) of incombustible rating appraisal in interior material of building, and incombustible materials (5 min) 8 MJ/$m^2$ in spite of the above data mentioned, those data are only as basis of interior finish, and so I cannot judge color nonwoven have incombustible rating retain through the above data. Accordingly, the basis of incombustible rating and experiment method about exterior finish must be arranged also.

Innovative Methodology for Assembling Jack up Leg of 205m on ground of Ultra

  • Yang, Yeong-Tae;Sim, Song-Seop;Lee, Seung-Yeop;Hwang, Oe-Ju;Sin, Bong-Yeong
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.87-92
    • /
    • 2003
  • Generally, in jack up rig design for harsh environment, its leg height is a major factor for achieving a sufficient serviceability & operability in terms of the worst environment and the workable depth. Due to difficulties in constructing such a high-slender leg, inaccessibility of yard fabrication equipment, etc. the construction of Jack up rig fur harsh deep sea has not been common. Method using heavy crawler crane, fabrication tower or extension by the floating crane vessel is still conventional construction but, considering high cost fur mobilizing heavy lift vessel (HLV) or additional marine work for implementing preload / full height test at sea, the ground-base construction is much advantageous. Air skidding method (ASM hereafter) is ground-based construction methodology, newly developed due to such requests. ASM could also be extended to similar engineering fields. This paper presents the operating sequence, design parameters and procedure which were verified through successful operation at the end of May 2002.

  • PDF

The Case Study on the Erection Construction Method for Soft Retractable Roof Structures (연성개폐 지붕구조물 Erection 시공법에 관한 사례 연구)

  • Park, Keum-Sung;Kim, Hyung-Do;Kwak, Myong-Keun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.101-108
    • /
    • 2016
  • Lifting plan in the large spacial structure is an important factor influencing the efficiency and economy of the construction process. The purpose of this study was deriving the requirements for lifting techniques as the basic research in the double spoke wheel roof structure construction. In the lift up erection method, management plan of the interference error in the column and outer-ring was needed that occur during lifting roof structure. In the bent erection method, material usage reduction plan was required by the structural design of the temporary bent. In the hybrid erection method, lifting plan was needed that minimizes weather condition and crane usage. All lifting techniques were required Value Engineering model for reduction of cost and construction period.

A Study on the control system for the Unintended Car Movement Protection Means to meet the International Standards of lifts

  • Choi, Youngkiu;Lee, Hochul
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.5
    • /
    • pp.2079-2087
    • /
    • 2017
  • As the number of tall buildings is increasing, the high-speed lift is necessary in the modern world. Therefore, the further considerations for associated safety devices of lifts were required by the International Standards. In order to stop the moving of cage and keep it, the lifts have to be provided with means that can detect the unintended car movement. Therefore, the International Standard Safety Rules for the construction and installation of lifts had been revised. This paper describes the operation principles of the Rope Brake to fit the Unintended Car Movement Protection (UCMP) means required by the International Standards. This paper confirmed that the performance of these devices was suitable in the scope of the safety standards. This paper also analyzed that the shocks on working of these devices in a car would be dangerous to each passenger differently. Thus, this paper proposes a new design that the circuit diagram of the Unintended Car Movement Protection systems should be improved from the existing design to solve these internal shock problems. So, it is expected to protect passengers from the internal shocks by working of Rope Brake due to irrelevant factors.

Back analysis on shear failure of compacted soil liner in composite liner system (역해석을 통한 복합차수시스템의 점토차수재 사면파괴 사례 연구)

  • Lee, Chul-Ho;Min, Sun-Hong;Choi, Hang-Seok;Stark, Timothy D.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1315-1323
    • /
    • 2010
  • This paper deals with a case study on a unique slope failure in a liner system of a municipal solid waste containment facility during construction because the sliding interface is not the geomembrane/compacted low permeability soil liner (LPSL) but a soil/soil interface within the LPSL. From the case study, it is concluded that compaction of the LPSL should ensure that each lift is kneaded into the lower lift so a weak interface is not created in the LPSL, and the LPSL moisture content should be controlled so it does not exceed the specified value, .e.g., 3% - 4% wet of optimum, because it can lead to a weak interface in the LPSL. In addition, drainage materials should be placed over the geomembrane from the slope toe to the top to reduce the shear stresses applied to the weakest interface, and equipment should not move laterally across the slope if it is unsupported but along the slope while placing the cover soil from bottom to top.

  • PDF

Field Application of Mass Concrete Using Setting Time Difference of Super Retarding Agent for Reduction of Hydration Heat (초지연제의 응결시간차를 이용한 매스 콘크리트의 수화열 저감을 위한 현장 적용)

  • 전충근;심보길;손성운;신동안;오선교;한천구
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.11-14
    • /
    • 2004
  • In this paper, field application of mass concrete using setting time difference of super retarding agent is reported to reduce hydration heat of concrete placed at newly constructed apartment house in Busan. Horizontal placing lift is applied. According to test results. slump and air content meets the requirement of target values. For compressive strength, it exceeds the nominal strength ordered by the costumer. Compressive strength of concrete cured in place is achieved more than the values of nominal strength at l4days. For temperature history, maximum temperature of center at top section shows 58.5$^{\circ}C$, and at bottom section, 62.6$^{\circ}C$. According to naked eye's investigation, no hydration heat crack is observed at the surface of concrete.

  • PDF

Steel Plate Girder Railway Bridge Ballast System using Rail Transfer Method(III) (선로이송 가설공법을 적용한 철도판형교 유도상화(III))

  • Min, Ji-Hong;Jang, Jun-Hyun;Kim, Jin-Yong;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1569-1576
    • /
    • 2011
  • To install heavy structures in the railway bridges, crane methods or launching methods using temporary structure have been applied. These methods are uneconomical because working yard is required, temporary cut of rail system, etc. In this study, various construction methods has been developed which are suitable to the filed conditions. In the case of simple span structure like plate girder bridges, the girder is loaded to troy system at the working yard and then transferred to the working place. To lift and lower the girder system, a new transfer system was developed. Different methods each for simple span bridge girder and long span girder were developed and detailed work procedures were proposed. Using these methods, the heavy structures can be installed with simple and safe work procedures and the construction cost and duration can be reduced.

  • PDF

Field Application of Setting Time Difference Method Using SRA for Reduction of Hydration Heat of Mass Concrete (매스콘크리트의 수화열저감을 위한 초지연제 응결시간차 공법의 현장 적용 -대전 가오지구 코오롱 하늘채 아파트 현장-)

  • Jeon Chung-Keun;Kim Jong;Shin Dong-An;Yoon Gi-Won;Oh Seon-Gyo;Han Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.21-24
    • /
    • 2005
  • In this paper, field application of mass concrete using setting time difference of super retarding agent is reported to reduce hydration heat of concrete placed at newly constructed apartment house in Daejeon. Horizontal placing lift is applied. According to test results,: slump and air content meets the requirement of target values. For compressive strength, it exceeds the nominal strength ordered by the costumer. For temperature history, maximum temperature of center at top section shows $25.6^{\circ}C$, and at bottom section, $35.4^{\circ}C$. According to naked eye's investigation, no hydration heat crack is observed at the surface of concrete.

  • PDF