• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.028 seconds

Analyzing the Market Structure of International Construction Contracts : Focusing on Korean Construction Firms (국내 건설기업의 해외건설 계약실적 구조 분석)

  • Lee, Kang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.124-132
    • /
    • 2019
  • Notwithstanding the crucial contribution of international construction industry in the national economy, previous studies on international construction contracts had mainly focused either on trend investigation or market share analysis at a point of time. Fundamentally, the international construction industry is fragmented due to its project-based nature, is heterogeneous that has to involve different firms from diverse fields, and tends to be dynamic according to macroeconomic conditions. Therefore, the combination of static and dynamic analyses is necessary to understand its underlying structure. This study analyzes the market structure of international construction contracts using the data of 9,173 projects awarded by Korean construction firms from 2000 to 2017. Industry-level performance data is analyzed both in static (market concentration) and dynamic (market mobility and instability) methods, and detailed methodology is also provided. Consequently, the static analysis result shows that the competition among Korean construction firms has been more intensified, and the dynamic analysis result indicates that market positions of Korean construction firms are unstable and vulnerable in most of the regions and the sectors. The combination of static and dynamic indices is found to be helpful to understand the underlying aspects of market structure and can be utilized as an effective strategic reference in the highly competitive market.

A Study on the Development of Construction Budget Estimating Model for Public Office Buildings based on Artificial Neural Network (인공신경망 기반의 공공청사 공사비 예산 예측모델 개발 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.22-34
    • /
    • 2023
  • Predicting accurately the construction cost budget in the early stages of construction projects is crucial to support the client's decision-making and achieve the objectives of the construction project. This holds true for public construction projects as well. However, the current methods for predicting construction cost budgets in the early stages of public construction projects are not sophisticated enough in terms of accuracy and reliability, indicating a need for improvement. The objective of this study is to develop a construction cost budget prediction model that can be utilized in the early stages of public building projects using an artificial neural network (ANN). In this study, an artificial neural network model was developed using the SPSS Statistics program and the data provided by the Public Procurement Service. The level of construction cost budget prediction was analyzed, and the accuracy of the model was validated through additional testing. The validation results demonstrated that the developed artificial neural network model exhibited an error range for estimates that can be utilized in the early stages of projects, indicating the potential to predict construction cost budgets more accurately by incorporating various project conditions.

Treatment of Concrete Wastewater in Repair of Bridge Deck (교량 바닥판 보수공사에서 발생하는 콘크리트 폐수처리 방안)

  • Lee, Bong-Hak;Choi, Pan-Gil;Kim, Jung-Ki
    • Journal of Industrial Technology
    • /
    • v.28 no.A
    • /
    • pp.125-132
    • /
    • 2008
  • As of 2003, construction waste has been produced at the level of 130,614.8 tons/day, in which the amount of waste concrete was 92,639.1 tons/day and accounted for about 66.4% of the amount of construction waste. Waste concrete is mainly produced in construction work and civil engineering work. Especially, road surface crushing method using a large amount of water requires thorough management of concrete wastewater. The aim of this study was to analyze water pollution due to concrete wastewater generated in repair of bridge deck using road surface crushing equipment and to suggest reasonable countermeasures for solve the problem. In this study, it was surveyed current conditions of produced concrete wastewater in bridge deck repair, analyzed physical features of concrete wastewater, expected effects of water pollution on inflow rivers if it is not treated, established treatment plan of water pollution by categories, and calculated capacity of each treatment process and required amount of necessary chemicals. As a result of sampling wastewater generated in field sites and testing it at a lab scale, it was revealed that the original wastewater was produced in removing concrete from bridge deck slabs using surface crushing equipment whose pH was 12.53, CODMn was 12.910mg/L, SS was 547.0mg/L, and other heavy metals were included in extremely small quantities.

  • PDF

Identification of Evaluation Items for Mutual Cooperation between General Contractors and Specialty Contractors (일반건설업과 전문건설업의 상생협력평가항목 개발에 관한 연구)

  • Park, No-Seong;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.678-681
    • /
    • 2008
  • After rapid economy growth, Korean economy and Korean enterprises are aware of the importance on Mutual Cooperation. However, Korean society is not ready to proceed Mutual Cooperation and there are no theoretical model yet. Therefore, this study will suggest the theoretical basis for Mutual Cooperation, though identifying the most commonly used factors of three reliable sources: Mutual Cooperaton Manual(Ministry of Construction and Transportation 2006), selected distinguishing Mutual Cooperation Cases by Ministry of Construction and Transportation and Mutual Cooperaton Manual of other leading fields. through this study, it is expected to find reliable factors to evaluate Mutual Cooperations between General Contractor and Specialty Contractor.

  • PDF

Utilizing noise mapping in environmental impact assessment in a downtown development area (도심지 개발사업에 따른 환경영향평가시 소음지도 적용방안에 관한 연구)

  • Lee, Shi-Won;Chang, Seo-Il;Park, Younge-Min;Choi, Jin-Kwon
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.535-540
    • /
    • 2005
  • In environmental impact assessment, noise impact assessment usually consists of three stages surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of project. When predicting noise level in urban area, this method does not consider acoustic phenomena like multi reflection, diffraction and absorption due to complex topographic configuration of building and terrains. For the purpose, a noise mapping tool is utilized to produce a series of noise maps, which are those for the present, for the works of construction and for the future. For accurate noise mapping, acoustical and topographic information is essential. Standard sound power levels and directivities of various construction equipments are required and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.

  • PDF

A Study on the Drawings on the Design and Construction after the Middle of the Choson Dynasty (조선 중기 이후의 설계와 시공도면에 관한 연구)

  • 전영옥
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.6
    • /
    • pp.16-28
    • /
    • 2001
  • The purpose of this study is to arrange the terminology of the drawings in Chosun Dynasty, and to investigate the characteristics of drawings after the middle of Chos n Dynasty. This study is based on the and analysis of historic documents and drawings including drawings from China and Japan. In order to accomplish this, the drawings for the process of design were studied first, and the techniques of drawing were studied next in comparison with Japanese drawing techniques. Lastly, the technicians of drawing were studied. The results of this study were as follows; 1) Though the procedures of design Choson dynasty were not divided into planning, designing, construction and maintenance just like those of modern society, a variety of drawings in that time were used in each level. 2) The drawings in Choson Dynasty ere divided into Tohyong and Tosol, and mostly, those for design and construction were Tohy ng. 3) Based on the interpretation of Japanese drawings, several suggestions were presented to solve the questions of the drawing techniques for design and construction. 4) The technicians of drawing were the painters who were trained in a government organization in charge of royal paintings. In the future, research of this area should be continued in to deepen study on drawings as historical materials. This research provides meaningful of guidance in the analysis of historic drawing paintings.

  • PDF

Evaluation of 2+1 Roads Application to Improve Rural Two-lane Highway in Korea (국내 2+1차로 도로 도입에 따른 교통운영 및 경제적 비용 측면의 기대효과 분석)

  • Chae, Chan Dle;Lee, Dong Min;Cho, Han Seon
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.85-92
    • /
    • 2013
  • PURPOSES: The purpose of this paper is to estimate expected effects on traffic operational and economic aspects of 2+1 roads application in Korea. METHODS : Micro simulation study using VISSIM 5.0 was used to analyze the operation efficiency of 2+1 roads compared to two-lane highways and four-lane highways. Some scenarios for various traffic volumes were set up in order to analyze the effect of 2+1 roads under various traffic situations. Also imaginary road networks were set up for each type of roads. The MOEs to measure the operation efficiency were selected with average travel speed and delay. For analyzing economic effect of 2+1 roads, construction cost of a specific imaginary 2+1 road was compared to construction cost of a four-lane highway with same conditions. RESULTS: The results of study show that a 2+1 road is more effective with 19 percents higher average travel speed and 39 percents lower average delay than a two-lane highway. In the economic analysis, construction costs to construct a 2+1 road are saved as approximately 26.4~40.7 percents when compared to construction of four-lane highway. CONCLUSIONS: It can be concluded that 2+1 roads can improve the traffic operational level of service for two-lane highways and 2+1 roads can be applied as an effective design alternative for higher-volume two-lane highways in Korea.

Ballasting plan optimization for operation of a 2D floating dry dock

  • Yoon, Kyungho;Kim, Hyo-Jin;Yeo, Seungkyun;Hong, Younghwa;Cha, Jihye;Chung, Hyun
    • Structural Engineering and Mechanics
    • /
    • v.74 no.4
    • /
    • pp.521-532
    • /
    • 2020
  • A floating dry dock is an advanced structure that can provide a solution for dry dock space shortages. The critical point in floating dock operation is compensating the deflection caused by a heavy payload by adjusting the water level in the ballast system. An appropriate ballasting plan warrants safe and precise construction on a floating dock. Particularly, in the case of a 2D floating dock, ballasting plan evaluation is crucial due to complex deformation modes. In this paper, we developed a method to calculate the optimal ballasting plan for accurate and precise construction on a 2D floating dock. The finite element method was used for considering the flexibility of the floating dock as well as the construction blocks. Through a gradient-based optimization algorithm, the optimal ballasting plan for the given load condition was calculated in semi-real time (5 min). The present method was successfully used for the actual construction of an offshore structure on the 2D floating dock.

Investment Incentive for Capacity Supply in a Period of Introduction of competition (경쟁체제 도입기의 수급안정화를 위한 설비투자 인센티브 설정 연구)

  • Kim, Chang-Soo;Rhee, Chang-Ho;Jin, Byung-Mun
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.406-408
    • /
    • 2000
  • Recently, Korea's electric industry is in the midst of a period of profound changes in the structure and function, including the introduction of market competition in the generation sector. Therefore, it is difficult to promote long-term capacity planning and new generating capacity construction which have been driven by KEPCO so far, after the introduction of market competition, so new generating capacity construction and security of reserve margin is needed through self·regulation plan of private generation producers by market mechanism. According to the competition in the generation sector, a new paradigm is necessary to the long-term capacity planning driven by the Government. This paper analyzes the plan and the incentive level able to guide the new generation capacity construction considering the uncertainty risk in a period of introduction of competition. In addition, this paper analyzes the plan able to guide the new capacity construction by market function at the stage which market become established and Government's role to solve the anxiety about the capacity supply and demand.

  • PDF

An experimental study on the effect of deterioration of drainage system on tunnel structures (배수시스템 수리기능저하가 터널구조물에 미치는 영향에 대한 실험적 연구)

  • Kwon, Oh-Yeob;Shin, Jong-Ho;Yang, Yu-Hong;Joo, Eun-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.970-979
    • /
    • 2006
  • Construction of underground structure requires higher standard of planning and design specifications than in surface construction. However, high construction cost and difficult working environment limit design level and construction quality. One of the most sensitive factors to be considered are infiltration and external pore-water pressures. Development of pore-water pressure may accelerate leakage and cause deterioration of the lining. In this paper, the development of pore-water pressure and its potential effect on the linings are investigated using physical model tests. A simple physical equipment model with well-defined hydraulic boundary conditions was devised. The deterioration procedure was simulated by controlling both the permeability of filters and flowrate. Development of pore-water pressure was monitored on the lining using pore pressure measurement cells. Test results identified the mechanim of pore-water pressure development on the tunnel lining which is the effect of deterioration of drainage system. The laboratory tests were simulated using coupled numerical method, and shown that the deterioration mechanism can be reproduced using coupled numerical modelling method.

  • PDF