과제정보
이 성과는 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임 (No. 2022R1F1A1064006).
참고문헌
- Baccarini, D. (2005). Estimating Project Cost Contingency - Beyond the 10% Syndrome. Conference Paper of Australian Institute of Project Management National Conference, Nov 9 2005. Victoria: Australian Institute of Project Management.
- Chandgude, S.E., and Sarode G.C. (2020). "To Study Cost Prediction Analysis of Construction Project Using ANN Model(Artificial Neural Network) SVM by Matlab." Journal of Emerging Technologies and Innovative Research (JETIR), JEITIR, 7(7), pp. 291-306.
- Gunaydin, H.M., and Dogan, S.Z. (2004). "A Neural Network Approach for Early Cost Estimation of Structural Systems of Buildings." Journal of Elsevier, Elsevier, 22(7), pp. 595-602.
- Han, H.D., Kim, J.H., Yoon, J.H., and Seo, J.W. (2011). "Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network." Journal of Korean Society of Civil Engineering, Korean Society of Civil Engineering, 31(6), pp. 829-837.
- Hashemi, S.T., Ebadati, O.M., and Kaur, H. (2020). Cost Estimation and Prediction in Construction Projects: a Systematic Review on Machine Learning Techniques. SN Applied Science Research Report, Review Paper.
- Heo, J.Y. (2014). "Prediction of Road-Construction Cost Using an Artificial Neural Network Method." Master Thesis, Journal of Kang-Won University, Kang-Won University, Kangwondo, Korea.
- Hong, S.I. (2021). Recent Research Trends and Revitalization of Machine Learning in Building Operation and Maintenance. KICEM Research Report, 22(2).
- Ji, S.H., Park, M.S., Lee, H.S., and Yoon, Y.S. (2008). "Direction for Improving Cost Estimation and Management of Construction Projects: Comparing to Australian System." Korean Journal of Construction Engineering and Management, KICEM, 9(2), pp. 170-181.
- Jo, Y.H., Choi, H.J., Kim, J.W., and Yun, S.H. (2020). "Conceotual Cost Estimate Method of Public Office Building Structural Frame Work by Regression Analysis." Journal of the Korea Institute of Building Construction, KIC, 20(2), pp. 147-153.
- Jung, E.H., Yeom, D.J., Kim, J.S., and Kim, Y.S. (2021). "Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities." Korean Journal of Construction Engineering and Management, KICEM, 22(3), pp. 69-78.
- Kim, C.Y., and Son, J.H. (2006). "A Study on the Model of Artificial Neural Networkfor Construction Cost Estimation of Educational Facilities at Conceptual Stage." Korean Journal of Construction Engineering and Management, KICEM, 7(4), pp. 91-99.
- Kim, I.K., and Park, J. (2022). "A Study on Improvement of Construction Cost Estimation Method in the Feasibility Study Stage of Health Facilities in ODA Project." Journal of Korea Association of International Development and Cooperation, KAIDEC, 14(1), pp. 99-118. https://doi.org/10.32580/idcr.2022.14.1.99
- Kim, J.H., Jun, S.M., Hwang, S.H., Kim, H.K., Heo, J.M., and Kang, M.S. (2021). "Impact of Activation Functions on Flood Forecasting Model Based on Artificial Neural Networks." Journal of the Korean Society of Agricultural Engineers, KSAE, 63(1), pp. 11-25.
- Kim, Y.C., Yoo, W.S., and Shin, Y.S. (2017). "Application of Artificial Neural Networks to Prediction of Construction Safety Accidents." Journal of Korean Society of Hazard Mitigation, KOSHAM, 17(1), pp. 7-14. https://doi.org/10.9798/KOSHAM.2017.17.1.7
- Korea Institute of Procurement. (2021). 「2022 Construction Order Guidebook.」 Korea Institute of Procurement (2021), pp. 1-51.
- Kulkarni, P.S., Londhe, S.N., and Deo, S.N. (2017). "Artificial Neural Networks for Construction Management: A Review." Journal of Soft Computing in Civil Engineering, SCCE, 1(2), pp. 70-88.
- Lee, D.H. (2018). Artificial Neural Network to Improve Learning Effectiveness of Artificial Intelligence. Telecommunications Technology Association (TTA) Research Report.
- Lee, H.S., Jung, M.J., Park, M.S., and Son, B.S. (2010). "Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost -Focusing on Army Barracks-" Korean Journal of Construction Engineering and Management, KICEM, 6(1), pp. 3-13.
- Lee, J.G., Lee, H.S., Park, M.S., and Seo J.O. (2021). "Early-Stage Cost Estimation Model for Power Generation Project with Limited Historical Data." Journal of Emarald, Emerald, ISSN 0969-9988.
- Lee, J.Y., and Lee, B.J. (2021). "Application of Artificial Neural Network to Predict Aerodynamic Coefficients of the Nose Section of the Missiles." Journal of The Korean Society for Aeronautical & Space Science, KSAS, 49(11), pp. 901-907. https://doi.org/10.5139/JKSAS.2021.49.11.901
- Oh, S.B., and Lim, H.I. (2019). "A Study on Hidden Layer for Neural Network Model." Proceedings of the Korea Information Processing Society Conference, KIPS, 26(1), pp. 467-769.
- Park, H.J., Choi, S.B., and Kang, C.W. (2020). "Determination of Input Nodes for Neural Network Model in Time Series Data." Journal of the Korean Data Analysis Society, KDAS, 22(3), pp. 1055-1065. https://doi.org/10.37727/jkdas.2020.22.3.1055
- Park, M.S., Seong, K.H., Lee, H.S., Ji, S.H., and Kim, S.Y. (2010). "Schematic Cost Estimation Method using Case-Based Reasoning: Focusing on Determining Attribute Weight." Korean Journal of Construction Engineering and Management, KICEM, 11(4), pp. 22-31. https://doi.org/10.6106/KJCEM.2010.11.4.22
- Van, S.G., Le-Hoai, L., and Dang, C.N. (2019). "Predicting Implementation Cost Contingencies for Residential Construction Projects in Flood-Prone Areas." Journal of Emerald, Emerald, 12(10), pp. 1097-1119. https://doi.org/10.1108/IJMPB-04-2018-0071
- Yoon, J.M. (2019). "Effectiveness Analysis of Credit Card Default Risk with Deep Learning Neural Network." Journal of Korea Money and Finance Association, KMFA, 33(1), pp. 151-183. https://doi.org/10.21023/JMF.33.1.5