Park, Jun-Ku;Cho, Woo-Sug;Noh, Myoung-Jong;Song, Nak-Hyeon;Kim, Min-Chul
Journal of Korean Society for Geospatial Information Science
/
v.16
no.4
/
pp.89-99
/
2008
In Korea, currently 10 local governments have completed the construction of the 3D Land Geospatial Information, since the pilot project started in 2004 and many other local governments are additionally constructing the 3D Land Geospatial Information. Technical Guidance for the 3D Land Geospatial Information has made out the construction methodology and concept of the ordinances in 2006 by the basis of the research results of the pilot project for the 3D Geospatial Information construction in 2005. But the result that applied the existing 3D Land Geospatial Information of the local governments, many problems rearing up on the methods and expression accuracy of the 3D Land Geospatial Information. This research analyzed and derived problems of established guideline for the zero-defects construction of the 3D Land Geospatial Information and it is aim at the present standardized criterion of the reestablished and method of the 3D Geospatial Information construction items. Improvement scheme of the 3D Land Geospatial Information is considered to be contribute to the standardized good quality of 3D Land Geospatial Information construction and its application.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.632-637
/
2006
Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.11-20
/
2011
Recently, the Construction Management service of domestic construction environment has being extended because that is an effective means to supplement owner's management and improve a total management of construction. But existing CM service guide is staying simply defined level about a work scope and procedure. So the standard CM guide needs to set a detailed plan of the project. Therefore, the key works were deducted by doing survey after the main work of CM service based on CM case studies and an existing CM service guide. That is expected to use CM contract and do service.
Park, Moon-Seo;Kim, Nam-Ho;Lee, Hyun-Soo;Ahn, Chang-Bum;Lee, Kyu-Sung
Korean Journal of Construction Engineering and Management
/
v.10
no.2
/
pp.14-25
/
2009
Many companies have managed their business performance in order to achieve their enterprise purpose. Performance management which applied concept of BSC (Balanced Scorecard) is widely used all over the world. In the construction industry, BSC-based performance management is currently introduced with needs of balanced performance evaluation. However, most companies actually have intermediate level of adapting BSC. It is important to understand its process or and structure. Therefore, this paper is focused on making performance management process and defining each phase of it. In addition, the model and system are established with putting them together. With developing performance process in construction, the construction companies are supposed to detect the deficiencies of the current performance management systems and take some opportunity to be helped for supporting their decision-making. In conclusion, this paper will provide the construction industry with the opportunities to enhance the values of performance management system and construction application.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.344-348
/
2008
During the last few years, the use of Pre-tensioned spun High strength Concrete(PHC) pile has been gradually increased in many construction sites such as super high-rise and large building construction. there is almost no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vortical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. And recent analysis results of the pile cutting work revealed that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is very labor intensive work, thus requiring a large amount of additional time, costs, and efforts. The main objective of the research is to analize problems and to improvement. measure of PHC Pile Construction. The improvement measure present to the main problem with survey and discussion.
Journal of the Korea Institute of Building Construction
/
v.18
no.6
/
pp.603-609
/
2018
It has been widely-reported that the quality of life in Korea is lower than that of the economic growth. In particular, construction managers are reported to have a lower quality of life compared to people in other job types due to the specific nature of the tasks they have to carry out. These include early work attendance time and fewer holidays. In this respect, the aim of this study is to analyse construction managers' requirements on work-life balance. The results showed that the working hours of construction managers were long and their leisure hours were shorter. The requirements for work-life balance were in the order of non-working time, working time, salary, and job security. The requirements by group showed a statistically significant difference in work hours. The requirements on the shortening of work hours were highest in the group of "section chiefs and deputy heads" and lowest in the group of "department heads" and up. It is hoped that the results of this study will be used as basic data for future government-level policy making and construction companies' business directions in relation to the improvement of workers' work-life balance.
VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
The Journal of Asian Finance, Economics and Business
/
v.8
no.3
/
pp.297-305
/
2021
A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.
Jung, Dae Gyo;Seo, Young Jun;Shin, Sang Wook;Kim, Dae Young
Korean Journal of Construction Engineering and Management
/
v.23
no.5
/
pp.77-86
/
2022
Safety accidents on the construction scene can cause serious accidents, that take worker's life, and as the government has been making great efforts to reduce industrial accidents, the role of safety managers closely related to accidents at construction sites is becoming important. However, job stress is high due to excessive workload and inefficient work managed by safety managers in the current construction safety management system. So, it is necessary to improve and simplify the work contents. The main purpose of this study is to identify and improve tasks that need improvement and simplification of inefficient tasks, obtained through expert opinions and surveys on the level of difficulty and prevention effect of tasks in the safety manager's working stage, by using 2×2 Matrix analysis techniques. Therefore, this study will ultimately contributes reducing the occurrence of safety accidents on the construction scene.
Korean Journal of Construction Engineering and Management
/
v.23
no.6
/
pp.76-88
/
2022
The death toll in the Korean construction industry accounts for more than 50% of all business deaths. This is the highest level among OECD countries, and the government has proposed various solutions to this, but has not seen any significant effect. In order to strengthen safety responsibilities and obligations to CEOs of companies in the blind spot of punishment, including those who have the greatest authority and influence in the construction industry, the Moon Jae In government strengthened various laws, including legislation of the Serious Accidents Punishment Act. However, at this point in time, half a year later, it is still questionable whether such punishment has been strengthened and the effectiveness of fragmentary measures has been exerted. This paper attempted to present legislative policy directions for the problems of the current system and future improvement measures to contribute to reducing significant accidents in the CM/supervision industry among the various subjects of the construction industry.
International conference on construction engineering and project management
/
2022.06a
/
pp.1242-1242
/
2022
Annually, several construction workers fall ill, are injured, or die due to heat-related exposure. The prevalence of work-related heat illness may rise and become an issue for workers operating in temperate climates, given the increase in frequency and intensity of heatwaves in the US. An increase in temperature negatively impacts physical exertion levels and mental state, thereby increasing the potential of accidents on the job site. To reduce the impact of heat stress on workers, it is critical to develop and implement measures for monitoring physical exertion levels and mental state in hot conditions. For this, limited studies have evaluated the utility of wearable biosensors in measuring physical exertion and mental workload in hot conditions. In addition, most studies focus solely on male participants, with little to no reference to female workers who may be exposed to greater heat stress risk. Therefore, this study aims to develop a process for objective and continuous assessment of worker physical exertion and mental workload using wearable biosensors. Physiological data were collected from eight (four male and four female) participants performing a simulated drilling task at 92oF and about 50% humidity level. After removing signal artifacts from the data using multiple filtering processes, the data was compared to a perceived muscle exertion scale and mental workload scale. Results indicate that biosensors' features can effectively detect the change in worker physical and mental state in hot conditions. Therefore, wearable biosensors provide a feasible and effective opportunity to continuously assess worker physical exertion and mental workload.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.