• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.034 seconds

A HAZARDOUS AREA IDENTIFICATION MODEL USING AUTOMATED DATA COLLECTION (ADC) BASED ON BUILDING INFORMATION MODELLING (BIM)

  • Hyunsoo Kim;Hyun-Soo Lee;Moonseo Park;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.17-22
    • /
    • 2011
  • A considerable number of construction disasters occur on pathways. Safety management is usually performed on construction sites to prevent accidents in activity areas. This means that the safety management level of hazards on pathways is relatively minimized. Many researchers have noted that hazard identification is fundamental to safety management. Thus, algorithms for helping safety managers to identify hazardous areas are developed using automated data collection technology. These algorithms primarily search for potential hazardous areas by comparing workers' location logs based on a real-time location system and optimal routes based on BIM. Potential hazardous areas are filtered by identified hazardous areas and activity areas. After that, safety managers are provided with information about potential hazardous areas and can establish proper safety countermeasures. This can help to improve safety on construction sites.

  • PDF

Enhancing Program Risk Management: A Social Network Approach

  • Wenxin SHEN;Xiaofan ZHAI;Jingjie XIONG
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.932-939
    • /
    • 2024
  • Program management presents unique challenges due to the complexity of interrelated projects and increased stakeholder engagement. While existing literature mainly focuses on project-level risk management, inter-project risks remain underexplored. This research addresses this gap by proposing a program risk analysis method that integrates project interdependence and stakeholder engagement. Leveraging social network analysis, the model enhances program risk management efficiency by identifying four types of inter-project risks and suggesting tailored response strategies. Through a case study of the Expo 2020 construction program, the effectiveness of the framework is demonstrated. This study enriches program and risk management literature, deepening our understanding of enhanced risk management in multi-project contexts.

The Change in Modeling Ability of Science-Gifted Students through the Co-construction of Scientific Model (과학적 모델의 사회적 구성 수업을 통한 과학 영재 학생들의 모델링 능력 변화)

  • Park, Hee-Kyung;Choi, Jong-Rim;Kim, Chan-Jong;Kim, Heui-Baik;Yoo, Junehee;Jang, Shinho;Choe, Seung-Urn
    • Journal of The Korean Association For Science Education
    • /
    • v.36 no.1
    • /
    • pp.15-28
    • /
    • 2016
  • The purpose of this study is to investigate the changes of students' modeling ability in terms of 'meta-modeling knowledge' and 'modeling practice' through co-construction of scientific model. Co-construction of scientific model instructions about astronomy were given to 41 middle-school students. The students were given a before and after instruction modeling ability tests. The results show that students' 'meta-modeling knowledge' has changed into a more scientifically advanced thinking about models and modeling after the instruction. Students were able to be aware that 'they could express their thoughts using models', 'many models could be used to explain a single phenomena' and 'scientific models may change' through co-construction modeling process. The change in the 'modeling practice' of the students was divided into four cases (the level improving, the level lowering, the high-level maintaining, the low-level maintaining) depending on the change of pre-posttest levels. The modeling practice level of most students has improved through the instruction. These changes were influenced by co-construction process that provides opportunities to compete and compare their models to other models. Meanwhile, the modeling practice level of few students has lowered or maintained low level. Science score of these students at school was relatively high and they thought that the goal of learning is to get a higher score in exams by finding the correct answer. This means that students who were kept well under traditional instruction may feel harder to adapt to co-construction of scientific model instruction, which focuses more on the process of constructing knowledge based on evidences.

An Assessment of Technological Competitiveness in Core Products of Foreign Design & Construction markets (해외 유망 건설상품의 기술 경쟁력 평가)

  • Choi, Seok-In;Kim, Sang-Bum;Lee, Young-Whan;Kim, Woo-Young;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.107-117
    • /
    • 2008
  • In this study, surveys and interviews are used to evaluate technological competitiveness of each product with respect to that of foreign leading firms, for seven leading domestic construction products which have been determined to have competitive edge in offshore markets, Such evaluation provides a more in depth study than previously conducted research, and is meaningful in that corporate level, rather than industry level, perspective is projected. Major findings of such evaluations are the following. First, as expected, it has been evaluated that domestic technological competitiveness in desalination plant and power plant has reached the point where it can compete with foreign leading firms. Moreover, a noteworthy result of the evaluation is that development program sector, including urban development of satellite cities, has reached considerable level of competitiveness in offshore market. In the case of the development market, domestic firms have accumulated sufficient experience in domestic market and engineering technology is not a decisive factor as in plant sector, and these factors lead to such an evaluation. Second, in the cases of gas, oil refinery and petro-chemical plants, domestic products' technological competitiveness that can contest in offshore market is still centered around production and construction. On the other hand, there are still weaknesses in license technology and basic design capabilities, which constitute the "value added" area. Third, skyscrapers, a promising product in offshore construction market and a product group which domestic firms have much performance record and projects in progress both in domestic and offshore markets, are considered. While direct comparison between skyscrapers and plant sector is not feasible, with the exception of production and construction, overall domestic capability in this sector has been assessed to be the lowest amongst those products that were surveyed. Fourth, it has been indicated that competitiveness is relatively higher in common technology than in key technology. In project management capability, it has been assessed that there are weaknesses in procedure document area. Also, a characteristic is the point that low overall assessments have been given across all product groups for corporate and management areas, not technological areas. Especially, financing, contracting/claim, risk management and investment on research and development received low evaluations. Fifth, it has been assessed that overall corporate and governmental supports are weak. This result is especially evident for corporate management and support areas across all product groups surveyed.

Comparison of Time Series of Alluvial Groundwater Levels before and after Barrage Construction on the Lower Nakdong River (낙동강 하류 하천구조물 건설 전후의 충적층 지하수위 시계열 특성 비교)

  • Kim, Gyoo-Bum;Cha, Eun-Jee;Jeong, Hae-Geun;Shin, Kyung-Hee
    • The Journal of Engineering Geology
    • /
    • v.23 no.2
    • /
    • pp.105-115
    • /
    • 2013
  • Increasing the river cross-section by barrage construction causes rises in the average river water levels and discharge rates in the rainy season. The time series patterns for groundwater levels measured at 23 riverside monitoring wells along the lower Nakdong River are compared for two cases: before and after water-filling at the Changnyeong-Haman Barrage. Monthly average groundwater levels indicate a distinct increase in groundwater levels in the upstream riverside close to the barrage. River-water level management by barrage gate control in August, during the rainy season, resulted in a 0.1 m decrease in groundwater levels, while water-filling at the barrage in December caused a 1.3 m increase in groundwater levels. The results of hierarchical cluster analysis indicate that seven groundwater monitoring wells and river water levels were in the same group before barrage construction, but that this number increased to 14 after barrage construction. Principal component analysis revealed that the explanation power of two principal components corresponding to river fluctuation, PC1 and PC2, was approximately 82% before barrage construction but decreased to 45% after construction. This finding indicates that the effect of the river level component that contributes to change in groundwater level, decreases after barrage construction; consequently, other factors, including groundwater pumping, become more important. Continuous surveying and monitoring is essential for understanding change in the hydrological environment. Water policy that takes groundwater-surface water interaction into consideration should be established for riverside areas.

Revision of related Regulations and Construction Standards for the Use of Information on Underground Facilities Quality Level (지하시설물 품질등급 정보의 활용을 위한 관련 규정 및 건설기준 개정 방안)

  • Park, Joon Kyu;Kim, Tae Hoon;Kim, Won Dae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.4
    • /
    • pp.343-350
    • /
    • 2022
  • The computerization project for underground facilities in Korea began in earnest after the city gas explosion in Seoul in 1994, and the Daegu subway explosion in 1995. As such a large-scale gas explosion accident caused enormous economic loss including human casualties and potential benefits, the need for computerized for efficient management of underground facilities was greatly emphasized in society. Meantime, computerization of underground facilities has been carried out according to the basic plan for building national geographic information system. In this study, problems were identified based on the current status of construction and management of underground facility information, as well as laws and regulations, and directions for establishing quality standards were presented. In addition, construction work standards such as 「Public Survey Work Regulations」, design standards, standard specifications, and technical specifications, gas technology standards, design standards, and communication works so that underground facility information can be linked and utilized in construction work by examining the linkage of the underground facilities, the targets that can be used for quality level information on underground facilities were derived, and a proposal to revise the construction standards was presented. In the future, if the quality standards are established, it is expected that the accuracy and utilization in the construction field will be increased.

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

Risk Management for Preventing Workers' Deaths in Construction Machinery Work (건설기계작업 사망사고 예방을 위한 위험관리)

  • Yang, Seungsoo;Paik, Shinwon
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.16-23
    • /
    • 2020
  • The use of construction machinery has been increasing every year due to the large scale, high-rise and lack of workers in construction work. On the other hand, deaths are on the rise every year due to inadequate risk management for construction machinery work. In addition, the number of deaths caused by the lack of signals or insufficient signals during construction machinery work is increasing rapidly, and it is deemed necessary to analyze the actual conditions and take countermeasures. Therefore this study has developed the Strength Risk Index (SRI) based on the Frequency Risk Index (FRI) and the 5W1H by analyzing in-depth deaths caused by construction machinery over the past five years. The risk index (RI) was assessed using the frequency and strength risk index derived to determine whether it is acceptable (acceptable risk < 0.25 ≦ unacceptable risk) and the risk assessment method for reducing risk was proposed by applying 3E (Engineering, Education, Enforcement) measures for each level of risk for unacceptable risk. It also proposed measures to improve the system, such as requirements for signal numbers, mandatory placement standards, and mandatory installation of side and rear monitoring cameras, as measures for accidents caused by failure to deploy signals or insufficient signals, which account for the highest proportion of deaths among construction machinery operators and workers.

A study and perceptions of domestic construction companies about the government procurement agreement on the US & Korea FTA (한.미 FTA 정부조달 협정에 대한 국내 건설업체의 인식에 관한 연구)

  • Sung, Joo-Ho;Lee, Jin-Kuk;Kang, Jung-Chul
    • Journal of the Korean Data and Information Science Society
    • /
    • v.20 no.6
    • /
    • pp.1029-1048
    • /
    • 2009
  • The purpose of this study is to diagnose the level of perception of domestic construction companies about the US & Korea FTA completed in 2007. According to the survey results, the more innovative the construction company is and the stronger ownership the construction company has, the more actively preparing for FTA. Altogether, our construction companies have well recognised the inevitable impacts on the domestic construction industry. On the other hand, most of them are more or less negative about whether or not the FTA gives us a good chance to switch from domestic companies into global companies.

  • PDF