• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.035 seconds

Impact of the Fidelity of Interactive Devices on the Sense of Presence During IVR-based Construction Safety Training

  • Luo, Yanfang;Seo, JoonOh;Abbas, Ali;Ahn, Seungjun
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.137-145
    • /
    • 2020
  • Providing safety training to construction workers is essential to reduce safety accidents at the construction site. With the prosperity of visualization technologies, Immersive Virtual Reality (IVR) has been adopted for construction safety training by providing interactive learning experiences in a virtual environment. Previous research efforts on IVR-based training have found that the level of fidelity of interaction between real and virtual worlds is one of the important factors contributing to the sense of presence that would affect training performance. Various interactive devices that link activities between real and virtual worlds have been applied in IVR-based training, ranging from existing computer input devices (e.g., keyboard, mouse, joystick, etc.) to specially designed devices such as high-end VR simulators. However, the need for high-fidelity interactive devices may hinder the applicability of IVR-based training as they would be more expensive than IVR headsets. In this regard, this study aims to understand the impact of the level of fidelity of interactive devices in the sense of presence in a virtual environment and the training performance during IVR-based forklift safety training. We conducted a comparative study by recruiting sixty participants, splitting them into two groups, and then providing different interactive devices such as a keyboard for a low fidelity group and a steering wheel and pedals for a high-fidelity group. The results showed that there was no significant difference between the two groups in terms of the sense of presence and task performance. These results indicate that the use of low-fidelity interactive devices would be acceptable for IVR-based safety training as safety training focuses on delivering safety knowledge, and thus would be different from skill transferring training that may need more realistic interaction between real and virtual worlds.

  • PDF

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF

A Study on Environmental Impact Assessment and Improvement Measures Around Construction Waste Intermediate Processing Sites in Rural Areas (농촌지역의 건설폐기물 중간처리 사업장 주변 환경 영향 평가 및 개선방안 연구)

  • Jang, Kyong-Pil;Kim, Byung-Yun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.26 no.2
    • /
    • pp.65-72
    • /
    • 2024
  • In order to analyze the impact of fine dust generated from a construction waste intermediate processing site on the surrounding areas, diverse types of samples were collected from inside the site and surrounding areas. The impact analysis results of samples are as follows. (1) Compared to the air quality management standards by the Ministry of Environment, the concentration of fine dust within the site was 30 to 46% for PM10 and 14 to 42% for PM2.5, which was not much different from the general air quality level. (2) It was found that PM10 within the site may have a partial effect on the air quality, but when the blocking facilities in the site, wheel washing facilities at vehicle entry and exit route, and sprinkler during working were maintained, the impact on the nearby area was not high. (3) In the case of PM2.5, its concentration was influenced more by the exhaust fumes from work vehicles than fine dust generated during construction waste processing. Since the PM2.5 concentrations in the site and surrounding area were not much different from the general air quality, there was little correlation with the work impact of construction waste intermediate processing sites. (4) Pb, an indicator of heavy metal components, was within 50ng/m3 in all three sites, which was 10% of the domestic management standard and equivalent to the general air quality level. The complaints from residents in nearby areas were filed using indicators based on visual and experiential information in their daily lives, so even if the survey results of environmental impact by the construction intermediate waste processing site are lower than the standard, nearby residents can feel it better than such numerical information. Therefore, specific activities to reduce find dusts should be continuously continued.

A Study of the Demands for Improvements in Speciality Construction Technology (전문건설 업종별 기술 개선을 위한 수요 분석에 관한 연구)

  • Cho, Jaeyong;Lee, Baul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.24-32
    • /
    • 2022
  • In Korea, the productivity of the construction industry is evaluated at a very low level, and the utilization of the elemental technology of the Fourth Industrial Revolution is also very low compared to other industries. In order to solve this problematic situation, it is necessary to identify the demand for technology improvement in the specialty construction industry that is directly in charge of construction in projects. Therefore, this study aims to investigate improving construction competitiveness and the demand for technology improvement in Korea's specialty construction industry. First, the concept and status of classification of the specialized construction industry were identified, and a questionnaire was organized. Second, a survey was conducted on experts construction experts, and the demand for technical improvement of the specialty construction industry was derived by applying AHP and cluster analysis. The results of this study will serve as a practical reference for policy development, R&D direction, and technology development roadmap to enhance construction competitiveness in the future, and ultimately will help to present directions to improve the construction competitiveness of the construction industry.

A Study of Traffic Noise Characteristics on the National Highways (일반국도의 교통소음특성에 관한 연구)

  • Son, Hyeon Jang;An, Deok-Soon;Baek, Cheolmin;Kwon, Soo-Ahn;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.11-18
    • /
    • 2013
  • PURPOSES : This study presents the noise level and frequency characteristics investigated in the national highways with the consideration of various measuring conditions and/or methods. METHODS : The noise levels on the asphalt concrete pavement(ACP) and the jointed plain concrete pavement(JPCP) of the national highway were measured and analysed with respect to three variables, i.e., pavement type, surface condition, and measurement distance. The PASS-By method is utilized for the noise measurement and then using CPB spectrum analysis method with 1/3 octave bandwidth, the noise levels and frequency characteristics were calculated for two-second periods before and after the peak noise. RESULTS : Depending on the pavement type, the noise level was changed as the average noise levels are 73.3dB(A) and 78.3dB(A) for ACP and JPCP, respectively. With respect to the effect of surface condition, the average noise levels for crack H(high), M(medium), and L (low) sections are 77.4dB(A), 77.4dB(A), and 78.1dB(A), respectively. Regarding the measurement distance, 1.2meter difference in measuring location reduces 1.6dB(A) of noise level; the average noise levels at 5.3m and 7.5m from the centerline of outer lane are 72.8dB(A) and 71.2dB(A), respectively. It should be noted that the noise levels are slightly different as a function of vehicle speed and type. However, the overall trends for each case was similar. It was found that the domain frequency bands for ACP and JPCP were 400Hz~2000Hz and 500Hz~2000Hz, respectively. CONCLUSIONS : Based on the analysis with the measured noise date from national highway, it was concluded that the noise level and frequency band vary depending on the various conditions. It was also found that some variables significantly affect the noise level while others do not. With further systematic investigation, the comprehensive noise characteristics on the national highway can be achieved. Using such database, it is possible to develop the fundamental noise reduction technology.

Direction and Strategy of Experts-Knowledge Management System Development for Enhancing CM Services (CM업무 고도화를 위한 전문가 지식관리 시스템 개발 방향 및 전략)

  • Kim, Sun-Kuk;Kim, Ah-Young
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.63-70
    • /
    • 2007
  • Construction managers who are placed on the top of the construction production organization should exhibit its best knowledges concerning all aspects and control related members at every position properly. In case of CM firms in developed countries, they are equipped with a practical system of technology and management knowledge, and efficiently use the knowledge not only for novices but also experts. However, the domestic CM firms which are now at the lower level than those in developed country are not supported with the sufficient and systematic knowledge for CM tasks due to various reasons. Therefore, the objective of this study is to suggest the direction and strategy for the development of an experts-knowledge management system to enhance the construction productivity at the viewpoint of CM firms which conduct, manage and supervise various tasks of construction projects. Domestic CM firms would play a great role to enhance productivity and secure competitive advantage of project management as much as the firms in developed countries if experts-knowledge and information are supported by a computerized system.

A Review of Standards for Allowable Limit of Blast Vibration According to the Safety Facilities and Improvement of Problems (보안물건의 종류에 따른 발파진동 허용기준 적용 사례 및 문제점 개선 연구)

  • Kim, Nam-Soo;Lee, Jong-Woo;Cho, Kyoung-Bin
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.50-58
    • /
    • 2013
  • Since various types of safety facilities have been located around blasting construction site, each of the institutions with regard to blast works has prepared limit criterion of blast vibration, respectively. But these criterions applied for limiting vibration are causing harmful effect including construction cost increasement and construction time extension due to exceedable high level application. In this study, more reasonable limit of blast vibration was suggested after reviewing criterions based on existing design and construction cases and analyzing of problems of applied criterions.

A Study on the transition of Construction Equipment -Focused on the Excavator- (건설중장비 디자인의 변천과정에 관한 연구 -굴삭기를 중심으로-)

  • 도경찬
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.277-288
    • /
    • 2003
  • By the needs for design, the leading construction equipment manufacturers have performed the product design newly setting up the design teams of late, but the actual level of designing is just as much as copying without systematic process, Therefore the various studies are needed to set up the differentiated design method targeted only for construction equipment and solving the current problems. In this paper, 1 am going to suggest a basic material as well as a cornerstone predicting future design trend in the construction equipment design field through the study of design transition.

  • PDF

Development of Safety Management Software Related to the Safety Level of Small & Medium Size Construction Sites (중소규모 건설현장의 안전수준을 고려한 안전관리 프로그램의 개발)

  • 안홍섭;이재용;장명훈;최순주;고성석
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.2
    • /
    • pp.170-177
    • /
    • 1999
  • In these days, large construction companies computerize safety management function and use softwares but small and medium ones do not have any or little in Korea, although it is much mote necessary for the latter having high accident ratios than for the former to make efforts to develop computerized safety management tools. That is, a reason why no safety management program has been developed and construction accident are required to be reduced outstandingly, computerized safety management systems are much needed to be developed. Thus, safety management software named SAFETY PLUS has been developed in this research that has 4 management scopes classified by the size of construction project. The utilization of SAFETY PLUS will be able to increase both effectiveness and efficiency of safety management efforts and result in drastic decrease of construction accidents.

  • PDF

A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.69-76
    • /
    • 2006
  • The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.