• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.032 seconds

A Study of Client's Role for Safety Management at Construction Sites (건설현장에서 안전재해예방을 위한 발주자의 안전관리 역할)

  • Lim, Jee-Young;Han, Kap-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.75-83
    • /
    • 2008
  • Larger and more sophisticated building construction requires more input resources such as worker, materials and devices. Growing resource volume brings risks at a construction site. The industry makes an effort to protect probable incidents at the site by organizing a safety management team. conducting a safety instruction and etc, but losses especially in the construction are higher than other industries. Major reason is that the safety management program is conducted only at the step of construction work and a root cause is not eliminated. Conventionally a concerned party shifts the blame to other parties such as constructor and site workers who are direct participants in the construction site. However, the whole causes of incidents go to the all subject of the construction not only the constructor but the client, designer and others related in the construction, and especially the clients are heavily involved in general concerns of the project. Therefore, this study is defined the role of the clients in nations and domestic condition of construction safety management is investigated. And it is analyzed surveys to prevent incidents at construction sites, and suggested the role of the clients which is classified pre and post construction, and in the middle of construction, and also categorized planning and design & construction schedule especially for the pre-construction level.

Integrated Building Energy Supply System : An Overview of Technical Trends for Gas Engine Driven Combined Heat and Power System (가스엔진 구동 건물에너지 통합 공급시스템 개발을 위한 기술동향 사례연구)

  • Park, Beungyong;Jeong, Yongdae;Shin, Hyunchul;Cho, Jinkyun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.11
    • /
    • pp.612-620
    • /
    • 2017
  • Power consumption in Southeast Asia is steadily increasing due to industrialization and the effects of hot and humid climates. However, there are not enough energy generation facilities and infrastructures to meet the growing demand because it is difficult to secure the construction and operation costs of the transmission and distribution systems. This study aims to develop a gas engine driven heat pump system that supplies heating, cooling and electric power to buildings. This system, besides its normal function to produce heat, has the capacity to generate electricity on a household level. This paper investigates similar cases overseas before developing the system. Through the investigation of commercialized similar systems, the level of technology and market trend of development system were identified. Features and specifications of commercial and industrial systems will be used for system development.

Seventh-Grade Students' Recognition of Geometric Properties and Justification Steps Emerging through Their Construction Approaches (작도 접근 방식에 따른 중학생의 기하학적 특성 인식 및 정당화)

  • Yang, Eun Kyung;Shin, Jaehong
    • Journal of Educational Research in Mathematics
    • /
    • v.24 no.4
    • /
    • pp.515-536
    • /
    • 2014
  • In the present study, we analyze four seventh grade students' recognition of geometric properties and the following justification processes while their adopting different construction approaches in GSP(Geometer's Sketchpad). As the students recognized dependency and level-1 invariants by dragging activities, they determined their own construction approaches. Two students, who preferred robust construction, immediately recognized the path of a draggable point and provided step-1 justification. The other students attempted soft construction followed by their recognition of level-2 invariants and the path, and came to step-2 justification.

  • PDF

Study on qunatified management for tunnel collapses on construction based on the KICT Tunnel Collapse Hazard index(KTH-Index) (터널 붕괴 위험도 지수(KTH-Index)에 기반한 터널 시공 중 붕괴 위험도 정량적 관리 사례 연구)

  • Kim, Young-Yun;Choi, Yu-Mi;Baek, Yong;Shin, Hyu-Soung;Kim, Bum-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1294-1301
    • /
    • 2010
  • In this study, a case study, where a hazard management for tunnel collapses has been quantitatively undertaken based on the KICT Tunnel Hazard(KTH) index, is presented. From this, it was able to timely inform the field engineers when the more detailed investigation is required for checking if any risky factor is shown on the tunnel face. At the same time, variable additional information such as sensitivities of major influence factors are also provided to field engineers from the methodology given in this study. The additional information would be helpful for better understanding of tunnel hazard level at the current tunnelling stage and following the required actions for more detailed checks of risky factors.

  • PDF

Development and Application of a Checklist for Analysis of Non-repetitive Work in Construction Industry (건설작업의 비정형적인 작업분석을 위한 체크리스트의 개발과 적용)

  • Park, Hee-Sok;Lee, Yun-Keun;Ok, Dong-Min
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.3
    • /
    • pp.321-329
    • /
    • 2010
  • Unlike production line works, construction work is non-repetitive in nature. In this study, a checklist was developed to characterize the ergonomic hazards of construction work. Eight existing checklists including OWAS, RULA, and REBA were integrated, and a new version was designed to include more postures of lower extremities. The analysis results obtained using the new checklist showed that manual materials handling (MMH) is the most common risk factor. About 62% of the MMH was done below the knee level or above the elbow level, and 22% was carried out with the trunk twisted more than $60^{\circ}$. The next risk factors were the works done with the knee bent or squatted, or with the shoulders abducted. It can be concluded that the new checklist is successful as a quick and easy tool for screening risk factors of construction works, although it is not capable of determining action levels. Further studies on validation of the checklist are expected.

Development of Noise Prediction Program in Construction Sites (건설 공사장 간이 소음 예측 프로그램 개발)

  • Kim, Ha-Geun;Joo, Si-Woong
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.17 no.11
    • /
    • pp.1021-1027
    • /
    • 2007
  • A construction noise is the main reason for people's petition among the pollution. The purpose of this study is to develop the noise prediction program to see the level of the noise on the construction site more accurately. For this purpose, the database of the power level on the various equipments was made. The noise reduction by distance and the noise reduction by diffraction of barrier were mainly considered and calculated. The simple noise prediction program will provide the information about proper height and length of the potable barrier which satisfies noise criteria of the construction sites from a construction planning stage. To investigate the reliability of this program, the predicted data was compared with the measured data. An average of difference between measured data and predicted data is $0.1{\sim}2.8\;dB(A)$ and a coefficient of correlation is about $0.85{\sim}0.95$.

Visualizing Method of 4D Object by Weight of Construction Risk Factors (4D객체 활용에 의한 건설공사 리스크 인자별 중요도 시각화 기법연구)

  • Kang, Leen-Seok;Park, Seo-Young;Kim, Chang-Hak;Moon, Hyoun-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.571-573
    • /
    • 2006
  • This study suggests a reasonable method for visualizing risk management level by risk weight linked with 4D model. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The final results include a method for visualizing risk level by each element of the project by using 4D simulation technique. It can be used as a visualized risk management tool instead of current system using numerical data.

  • PDF

The Change of Relationship between Spatial Configuration and Pedestrian Movement during Inhabited Remodeling - Focused on Coex Shipping Mall - (재실 리모델링 공사 기간 중 공간구조와 쇼핑객 통행량의 상관성 변화 연구 - 코엑스 쇼핑몰을 대상으로 -)

  • Kim, Min-Soo;Kim, Young-Ook
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.9
    • /
    • pp.11-18
    • /
    • 2019
  • Commercial facilities are put under construction for inhabited remodeling due to management or cost issues. Temporary facility planning is important in inhabited remodeling because building construction and management are simultaneously performed in this type of remodeling. The purpose of this research is to identify how the temporary spatial structure changes for each inhabited remodeling construction level of commercial facilities and existence of tenants affect the spatial usability. It also examines a relationship between the traffic flow and spatial configurations during the inhabited remodeling process where the tenants are temporarily removed and only the spatial configuration are maintained and verifies if the established theory that the spatial configurations in commercial facilities significantly affect the traffic is also valid during the inhabited remodeling process. The research result was found that the amount of traffic during the inhabited remodeling construction process is more affected by the factors such as tenants rather than spatial configurations. It is anticipated that the result of this research will serve as a guideline to establish logical inhabited remodeling plans for each level of constructing temporary facilities. Furthermore, it can be used to minimize the sales damage caused by the construction or as a guideline to determine the order of tenants to be moved into the new commercial facilities.

Development of the Construction Waste Management Performance Evaluation Tool (WMPET): Quantification of Waste Management Performance Factors and Establishment of Waste Management Performance Evaluation Tool (건설현장의 폐기물 관리 성과 평가 툴 개발 : 2단계 - 폐기물 관리 성과 요인의 전량화 및 평가 툴 구축)

  • Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.128-136
    • /
    • 2007
  • As the international-level concern has been focused on the environmental sustainability in recent years, many researches emphasized the needs for methods and techniques that would facilitate sustainability assessment at the various project level interfaces. As part of methods and techniques to facilitate sustainability assessment, this paper provides 'Computerized Waste Management Performance Evaluation Tool' for the purpose of assessing the level of management system in dealing with the onsite construction wastes. This tool applies twenty-three waste management performance factors for the purpose of evaluating the level of waste management performance by scoring those factors which were identified in the previous research. These twenty-three factors are classified into four categories: manpower, material, method, and management based on their characteristics. In order to quantitatively evaluate the effectiveness of waste management performance, the levels of actions executed in a site by each waste management performance factor were identified and their weight were analyzed throughout the expert interview and survey. Furthermore, an excel-based computerized tool was developed in order to facilitate the evaluation process. If this tool can be developed in more detail and be used as the method to control waste management at a project level for the future, it is expected that this tool can play an important role in the body of knowledge of environmental management in construction industry.

Derivation and Implications of Digitalizing Key Construction Supervision Work: Focusing on the Construction Supervision Work of the Domestic Construction Sites

  • Chan Hyuk Park;Seong Mi Kang
    • Architectural research
    • /
    • v.25 no.1
    • /
    • pp.11-17
    • /
    • 2023
  • This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.