• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.029 seconds

A Field Study on the Preference in the Construction Management (공사관리업무에 대한 선호도 조사 연구)

  • 이두진;최민권;손재진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.124-129
    • /
    • 2001
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

Construction Industry Maturity Model

  • Kwon, Byung-ki;Lee, Hyun-soo;Park, Moonseo;Lee, Kwang-Pyo;Kim, Soo-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.445-449
    • /
    • 2015
  • Construction industry is one of the most significant sector in national economic, but the portion of construction has been falling regularly with the regional development. In spite of decrease in economic portion, role of construction industry does not changed irrespective of development, as the foundation of development. To distinguish each state of the maturity, countries are grouped on GDP per capita, than compared with variance of GVA in construction and GFCF per GDP as level of construction industry. GVAc% and GFCF% shows corn-shaped plotting in increase of GDP per capita, and each value converge to around 20% and 5% as GDP per capita increase. The definition of maturity is consist of 4 stages; pre-developing, ascending, stabilization, and maturement. Maturity of construction industry is a term of broad sense of construction industry that is easily to figure current state of regional construction and shows what normal condition of construction is in regional economy.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Analysis Techniques for Accident Causes of Subcontract Work at Construction Site (전문 건설공사 재해원인 분석 기법에 관한 연구)

  • Son, Ki-Sang;Rhee, Kyung-Yong;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.34-42
    • /
    • 2009
  • There are many accident causes related to even an accident. As well four(4) stepped causes of one accident at construction sites are analyzed in the study. First, eleven(11) cause factors are set up at each step such as policy level, management, indirect, direct level which are discussed and determined by field experts with 15year experience or more. Therefore, one direct cause occurred in construction site can be connected to the previous cause than in direct and management, and policy problem of previous management. These questionnaires results are analyzed with three different methods such as weighing level by Delphi technique, correlation analysis, critical pass method. Three different methods show their characteristic to see which subcontract work is more dangerous or not. Subcontract or at a construction site can be use the above three different cases as they need at their site in order to make more effective countermeasures.

Change of Hydraulic Characteristics in the Downstream Keum River after the Construction of Estruary Dam (금강하구둑 건설로 인한 금강하류부의 수리 특성 변화)

  • 박승기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.41 no.5
    • /
    • pp.68-76
    • /
    • 1999
  • The purpose of the study was to investigated the change of hydraulic characteristics like water surface profile and rivered section in the down stream of Keum river after the construction of esturary dam. The effect of esturary dam on the flood control in the Keum river was recognized with the data of two flood events happened in July, 1987 before the construction and in August, 1995 after the construction of estuary dam. For example , duration time above the water level of the warning -flood was changed from 46.5 to 42.8 hours and duration time above the eater level of the danger-flood was changed from 24.7 to 19.8 hours at the Kyuam station. The time difference to reach the water level of the designated -flood between Kyuam and Kangkyung was changed from 3 hours in 1987 to 12 hours and 20 minutes in 1995. The water surface slope of river decreased 25.6% between estuary dam and Kangkyung and increased 16.5% between Kangkyung and Kyuam, and decreased 8.8% between Kyuam and Kongju. As the result, velocity was getting faster and river bed was scoured in the reach of Kangkyung and Kyuam, and velocity was getting slower and river bed was sedimented in the reach of Kangkyung and estury dam.

  • PDF

A Study on the Standardization of Operation System for Road Tunnels (터널운영시스템 표준화 연구)

  • Kim, Tae-Hyung;Kim, Jin;Keum, Jae-Sung;Tae, Jae-Ho;Kim, Sun-Hong;Hong, Dae-Hie
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.75-79
    • /
    • 2008
  • Since tunnel construction order was placed one by one, various sensors and actuators installed at the RTU and higher level system in each tunnel maintenance office had their own protocols depending on construction company. The TGMS testbed established on the extended region of Yong-dong Highway, for example, did not have consistent protocol between each automation levels and management levels without considering the functions and/or roles of each level. The management sever in each tunnel was simply networked to the TGMS server. Therefore, it is impossible to implement a new control algorithm as well as to integrate each other since each tunnel was constructed by different company. So, if the construction company is out of business, there is no way to maintain the corresponding tunnel effectively. In order to solve this problem, all the necessary standard protocols was established between automation level and management levels. These interface standards provide the clear classification between individual tunnel system and tunnel management system. So, even if construction company is different, its effect is minimized, so that it is expected to successfully establish PC based TGMS.

  • PDF

Factors Affecting Application of Cost Management Accounting: Evidence from Small and Medium Enterprises in Vietnam

  • NGUYEN, Co Trong;NGUYEN, Tung Dao;NGO, Hoang Thanh
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.4
    • /
    • pp.185-190
    • /
    • 2022
  • The article analyzes the impact of factors affecting the application of management accounting in Vietnamese small and medium enterprises. It provides more empirical evidence on the factors affecting the application of cost management accounting. The research methodology involved a questionnaire survey of managers at all levels, and chief accountants and accountants of 65 Vietnamese construction enterprises. 220 questionnaires were collected in total, out of which 14 invalid questionnaires were not used due to many blank cells. The 5-level Likert scale is familiarly used in many studies, so the author also quantifies each factor according to five levels. Quantitative research was carried out with SPSS 25 software. Research results show that 4 factors positively influence the application of cost management accounting, including Business strategy, Management cost control, level of accounting staff, and Manager's point of view on cost management accounting. The level of accounting staff factor has the strongest influence on the application. Based on the research results, the author has proposed recommendations to improve the application of cost management accounting techniques of construction enterprises, thereby contributing to enhancing competitiveness and efficiency activities of construction enterprises in Vietnam.

Influence of the deteriorated anti-seismic devices on seismic performance and device behavior of continuous girder bridges

  • Shangtao Hu;Renkang Hu;Menggang Yang;Dongliang Meng
    • Earthquakes and Structures
    • /
    • v.24 no.5
    • /
    • pp.333-343
    • /
    • 2023
  • Various seismic isolation and reduction devices have been applied to suppress the longitudinal vibration of continuous girder bridges. As representative devices, lead rubber bearing (LRB) and fluid viscous damper (FVD) might suffer from deterioration during the long-term service. This study aims to evaluate the impact of device deterioration on the seismic responses of continuous girder bridges and investigate the seismic behavior of deteriorated LRBs and FVDs. Seismic performance of a simplified bridge model was investigated, and the influence of device deterioration was evaluated by the coefficient of variation method. The contribution of LRB and FVD was assessed by the Sobol global sensitivity analysis method. Finally, the seismic behaviors of deteriorated LRBs and FVDs were discussed. The result shows that (i) the girder-pier relative displacement is the most sensitive to the changes in the deterioration level, (ii) the deterioration of FVD has a greater effect on the structural responses than that of LRB, (iii) FVD plays a major role in energy dissipation with a low degradation level while LRB is more essential in dissipating energy when suffering from high degradation level, (iv) the deteriorated devices are more likely to reach the ultimate state and thus be damaged.

Field Measurement of Airborne Sound Insulation for Noise Reduction about Community Facilities in an Apartment Complex (공동주택 단지 내 주민공동시설의 소음 방지를 위한 공기전달음 차단 성능 현장 조사)

  • Seong, Yo-Han;Kim, Jin-Sik;Kim, Hye-Won;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.249-250
    • /
    • 2023
  • The objective of this study is to evaluate the airborne sound insulation performance between housing units and community facilities during the construction phase. Community facilities adjacent to housing units can lead to noise problems, hence it is necessary to minimize noise transmission during the design phase. However, flanking noise transmitted through gaps of structures, windows, pipes, and other openings may result in substandard sound insulation performance falling below the design standards. Therefore, It is crucial to measure airborne sound insulation in the field during the construction phase. The measurement was conducted using the survey method for the field measurement of the airborne sound insulation in accordance with KS F ISO 10052:2021. Although the noise standards caused by community facilities in apartment complexes are not specified in current laws and regulations, desired noise level was set based on international guidelines for indoor noise. First, the level of noise generated in community facilities was estimated, and then the sound insulation performance was evaluated to determine whether the desired noise level was achieved.

  • PDF