The essential Policy for solving the problems of the Seoul Metropolitan Region is the relocation of national pivotal functions into the non-Capital Region. The decentralization of pivotal functions should be pursued at the national level. National public institutions should be moved according to the characteristics of the institution itself and the regional function and specialization. Primarily, after selecting target institutions from the administrations at the vice-ministerial level, affiliated organizations, government-funded agencies, and institutions invested tv governments, we need to develop various measures to diminish the problems and obstacles resulted from the relocation of public sector. The construction of the new administration capital city is one of the alternatives which solve the problems of the Seoul Metropolitan Region and improve the regional inequality. It is very much important that the Korean citizens agree to the construction of the new administration capital city.
Recently, drivers have begun to regard comfort in the cabin as one of the most important factors in construction equipment like forklifts. Accordingly, it has become more important to design a forklift cabin with a better sound quality as well as lower sound level, which can make a driver more comfortable. In this paper, the correlation between subjective evaluation and Zwicker's sound quality index was analyzed through a blind test by a few workers in forklifts and other construction equipment in several countries. Correlation analysis showed that Loudness and Sharpness were ranked in sequence, and tendencies were different from country to country. Also, contribution analysis for Loudness and Sharpness using operational transfer path analysis (OTPA), which is widely used in the field of noise, vibration, and harshness (NVH), was performed. However, Loudness and Sharpness cannot be used with OTPA directly because there are no linear relationships between the sources and receivers. In this paper, both are calculated by applying the DIN 45631 method with a contribution rate (%) of 1/3 Octave Sound Pressure Level by OTPA method in addition to considering spectral masking.
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.28
no.4
/
pp.365-373
/
2018
Objective: This study aims to analyze the relationship between employment status and the prevalence of chronic obstructive pulmonary disease (COPD) for manufacturing and construction workers. Methods: Subjects, who had or have worked as temporary workers in manufacturing or construction worksites for the longest career years, were extracted from the KNHANES(2007-2009) database. Characteristics of demographical, socio-economic, and smoking history were treated as independent variables. Considering that smoking experience and age are significantly influential in the prevalence of COPD, logistic regressions were analyzed after stratifying subjects according to their smoking experience and age. A two-stage stratified systematic sampling method was applied for the logistic regression analysis. Results: Age, gender, and household income level were associated with the prevalence of COPD in both smoking and non-smoking groups. However, employment status was only significant among smoking group. Smoking experience and age were significantly related to the prevalence of COPD among all age groups. In addition, employment status and household income level were also associated with the prevalence of COPD in young aged group. But gender was the only significant factor among the elder group. Conclusions: This study confirmed that employment status was a major social factor which may be related to the prevalence of COPD. Proper supports such as providing safety measures should be provided to temporary workers to manage their respiratory health.
Along with industrial development, various architectural structures have become bigger and higher, leading to an expansion in the size and capacity of construction equipment. And with the development of public transportation, the use of subways as a means of transportation in the city center is increasing, so that vibrations and structural noises are emerging as a new environmental issue. Considering that architectural structures may be used from several decades to hundreds of years after the time of construction, they can be seen as semi-permanent. Due to changes in the vibration-proof polyurethane mats installed in the foundation of these structures, settling may occur and vibration reduction may become inadequate. Therefore, in view of service life, it is necessary to have a high-level standard of reliability and stability. In accordance with this, the Floating Floor System, which uses soft polyurethane foam and can be constructed within a relatively short period of time, has excellent vibration resistant characteristics. It is presented as a great alternative solution to the issue of vibrations caused by subways, railways and building structures. At present, vibration-proof polyurethane mats have been developed up to the same product level as in other advanced countries. However, in the construction of structure foundations, the physical properties of this product and its shape incur changes. If they are installed as such in the structure of a building, it may cause significant impact on stability, requiring that this cause be urgently identified and improved.
Journal of the Computational Structural Engineering Institute of Korea
/
v.35
no.3
/
pp.183-190
/
2022
The construction of an underground silo structure was the first stage of erecting the Gyeongju low-and-intermediate-level radioactive waste disposal facility. The facility, completed in 2014, has a scale of 100 000 drums and is currently in operation. The underground silo structure, 25 and 50 m in diameter and height, respectively, consists of cylindrical (for storing waste packages) and dome parts. The dome is divided into lower (connected to the operation tunnel) and upper parts. The wall of the underground silo structure is an approximately 1-m-thick reinforced concrete liner. In this study, finite element analysis was performed for each phase of the construction sequence and operation of the underground silo structure. Two-dimensional axial symmetric finite element analysis was implemented using the SMAP-3D program. Three-dimensional finite element analysis was also performed to examine the reliability of the two-dimensional axial symmetric finite element model. The structural behavior of the underground silo structure was predicted, and its structural safety was examined.
Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.3D
/
pp.383-390
/
2008
Construction safety control system had improved constantly but the severity rate of injury don't reduced, safety level of construction don't progressed as usual. In order to reduce of the severity rate of injury safety control in site is important but it needs to improve form of system that introduce obligation of safety design and design safety appraisement, an effect use method of safety control cost. The safety control cost is problem that reduce than design cost accordance bidding rate and use a little safety facility cost compare with labor cost. This study tried reduce the severity rate of injury by propose effective improvement scheme through relevant problem analysis to the safety control cost and remove caution that the severity rate of injury don't reduced.
It is a complex project to construct the standard system of sports events. Sports events standard system covers from the implementation plan to the evaluation work after the smooth implementation of sports events, involving many links. Large-scale sports events have extremely high media value. However, the successful organization and operation of large-scale sports events face many problems to be overcome, especially in terms of event safety. Although the organizers and organizers of large-scale events have invested many resources for the safe holding of sports events, violence similar to "football hooligans" in Europe is endless. At present, compared with Western countries, the standardization of sports events in China is low, and there is a problem of a late start and huge difference with Western developed countries. Knowing the construction of the standardization system's situation in China, we have summarized the data related to 15 sports events held in Chengdu is the last 5 years. By analyzing the problems in the process of holding these 15 events and the reflections of participants on the experience of sports events, the problems in the development of the standard system of sports events are discussed in depth. The final conclusion is that the system structure of China's sports events is not so good and athletes have a poor experience. China's sports event system still has many problems. Finally, we built a sports event standardization model using Internet of Things, and after a practical test we found that it has a good effect. Finally, we combined the current situation of sports event standardization system in China and put forward the following suggestions: laws and regulations related to the standard system of sports events must be formulated at the national level. The implementation level must strengthen the degree of integration of sports events and technology. To improve the quality of human resources in the management of sports events. The article puts forward targeted solutions, which play a great role in promoting the perfection and completeness of China's standard system for sports events. At the same time, it also promotes economic development and improves China's international status.
Ahn, Chang Hyuk;Joo, Jin Chul;Joo, Won Jung;Ahn, Hosang;Lee, Saeromi;Oh, Ju Hyun;Song, Ho Myeon
Journal of Korean Society of Environmental Engineers
/
v.35
no.4
/
pp.283-288
/
2013
To evaluate the ability of the submerged plant, Ceratophyllum demersum's (C. demersum) to remove nutrients and to inhibit growth of cyanobacteria, a total of 6 mesocosms were conducted in a batch reactor for 9 days. From the 84 hr of the experiment, C. demersum was stabilized and showed daily cycle trends according to changes in pH and DO levels. The concentration of nutrients, $NH_3{^+}$, $NO_3{^-}$ and $PO_4{^3}$ continuously decreased until 9 days of the experiment, with the rapid decrease in nutrient concentration for the first 24 hours. High correlation coefficient ($r^2{\geq}0.96$, p<0.001) between the amount of C. demersum's biomass per unit area and the nutrients removal level were derived, and greater C. demersum's biomass per unit area showed higher removal efficiency of nutrients. However, there were differences in the C. demersum's activity level between batch reactors with higher and similar density of the C. demersum, but nonetheless water purification effect appears to have a significant influence due to attached algae and microorganisms. The growth rate of harmful cyanobacteria, Microcystis aeruginosa (M. aeruginosa) with C. demersum's density of 2,500 g $fw/m^2$ (100% of cover degree) was 0.31 /day, compared to the growth rate of 0.47 /day for the control group (0% of cover degree). In terms of number of cells, the control group had 1.7 times higher number of cells than the experimental group, proving that C. demersum has the ability to inhibit the growth of harmful cyanobacteria.
Journal of the Korea Institute of Building Construction
/
v.17
no.2
/
pp.191-197
/
2017
The safety nature of construction industry differs from that of manufacturing sector. For instance, accident risk level dramatically varies at each phase of construction process. Korean Occupational and Health Safety Act has been regulated OHS expense and it contributed reducing accident risk and enhancing safety culture for many years. However, although current regulation guides to use OHS expense proportionate to construction progress, it still allows late use of the expense. This study was conducted for the purpose of presenting methods of estimating a step-by-step OHS expense rate required at each construction phase. In order to do provide proper OHS expense schedule, it analysed accident risk of each construction phase by sorting out 1439 cases of construction site fatality reports, and proposed a method of generating appropriate OHS expense scheme according to its construction work progress characteristics. Both linear and sigmoidal S-curve model were used for the analysis, and the latter generally requires earlier use of OHS expense. By comparing the estimated OHS expense use schedule with current criteria, more than 27%p early use of OHS expense is required for the prevention of accident.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.