• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.036 seconds

Period of the Strength Correction of the Concrete with the Temperature Level Based on Meteorological Data (기상자료를 이용한 콘크리트의 단계별 기온보정강도 적응기간 산정)

  • Han, Min-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.107-112
    • /
    • 2008
  • According to Korean Architectural Standard Specification (KASS) , at the design stage of the specified concrete strength, strength correction with each temperature level should be considered to secure required strength at 28 days even in low temperature condition, In this paper, the period for the strength correction at the stage of mixture design of the concrete using ordinary Portland cement(OPC) specified in KASS was determined with each region of south Korea based on the meteorological data of KMA(Korea meteorological administration) by applying KASS-5 regulation. In case of 28 days of strength control age, the period for strength correction with 6MPa was calculated to $50{\sim}60$ days and, with 3 MPa. to around 80 days. The period for the strength correction was shown to be decreased with the rise of altitude. The period to consider the delay of the strength development due to low temperature including the period of cold weather concrete was nearly 7 months around 1 year. References for determining the strength correction factors with each region of south Korea was provided in this paper. Further investigation of strength correction of the concrete containing blended cement is to studied.

Construction and Application of Nursing Information System Using NANDA-NOC-NIC Linkage in Medical-Surgical Nursing Units (간호진단-간호결과-간호중재 연계를 이용한 내외과계 간호단위 간호정보시스템 구축 및 적용)

  • Ko, Eun;So, Hyang-Sook
    • Korean Journal of Adult Nursing
    • /
    • v.25 no.4
    • /
    • pp.365-376
    • /
    • 2013
  • Purpose: The purpose of this study was to construct, develop, and apply a nursing information system (NIS) using NANDA-NOC-NIC linkage in medical-surgical nursing units. Methods: This study consisted of three phases which were the construction of the database, development of the NIS, and application of the NIS. To construct the database, a questionnaire and nursing record review by an expert group were used. Collected data were analyzed by the SPSS/WIN 13.0 program. Results: In first phase, the database was made up of 50 nursing diagnoses, 127 nursing outcomes and 300 nursing interventions. In the second phase, NIS was developed according to its flow diagram and then tested. In the third phase, the developed NIS was applied to 130 inpatients. Nursing diagnoses frequently used were acute pain, delayed surgical recovery, and deficient knowledge (specify). Nursing outcomes for a nursing diagnosis of 'acute pain' were identified as pain control, pain level and comfort level. Nursing interventions for the nursing outcome 'pain control' were pain management, patient controlled analgesia assistance and medication management. Conclusion: The results of this study will facilitate the use of the newly proposed NIS in nursing practice and provide a guideline for evidence-based nursing.

Field Investigation Work Modeling on Defect Inspecting Step of Defect Consulting in Apartment Building of Korea (공동주택 하자감정을 위한 하자조사단계의 현장조사 업무 모델링)

  • Park, Jun-Mo;Seo, Deok-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.87-88
    • /
    • 2015
  • A defect dispute surrounding an apartment building is in constant trouble, a defect consulting is necessary that objective and impartial for solving a defect. The defect dispute about a defect lawsuit is conducted in the order that filling of lawsuit, consulting order, defect inspecting, estimating a repairing cost, writing a consulting report, submitting a consulting report, and decision by court. Of these, a step of defect inspecting is extensively investigated an occurred defect that each defect index and type from each part and place. At this time, it is collected of many data and created many information. For this, it need to organize and manage. The study is a modeling of field investigation work process that second phase of defect inspecting step. A literature study is defined a work until level 2. This study is defined the work until level 3 to 4. In addition, the modeling can do for using a job name, a place to job, a job to do, and a person concerned about defect consulting case. The modeling is expected a contribution of improving a defect consulting process and systematizing a judgment standard.

  • PDF

A Study on the Improvements Plans of the Disaster Dangerous Facilities Safety Management (재난위험시설 안전관리의 개선방안에 관한 연구)

  • Go, Seong-Seok;Yeo, Sang-Ku;Mun, Byung-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.143-151
    • /
    • 2012
  • The facility safety management in Korea does not secure efficiency as a safety management that is not constructed a maintenance manual. As such, disaster dangerous facilities are at a great danger for disaster occurrence. Accordingly, this study introduced revised requirement and revised level of requirement to field attendants to explore domestic facility safety management system, and set up and suggested a revised plan through brainstorming and attendants of central management institutions. This study is of importance that it reflects field attendants and attendants of central management institutions, suggests specific alternatives for realization to improve national level of institutional improvement.

A Research on Analyzing Current Status and Ways to Improve Access Transportation to Incheon International Airport (인천국제공항 접근교통시설의 현황분석 및 개선방안에 관한 연구)

  • Suh, Yang Hwan;Kim, Kyong Sook;Han, Soon Wook;Yoon, Sung Hyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.4
    • /
    • pp.106-114
    • /
    • 2012
  • As Incheon International Airport(IIA) is located in an island 50-km away from Seoul, various travel equipments for access are required. So far two connecting bridges are constructed funded by civilian funds. For the further bridge construction, the reduction of forecast traffic amount and the government subsidy for the civilian funds are big issues. Comparing the access traffics of IIA to those other competing airports, traffic conditions inside the airport are superior to other competing airports from the management point of view, as utilization conditions and equipment capacities are periodically monitored and evaluated to set up comprehensive countermeasures following constructing by stages. However, while the accessability to IIA is very important, as IIA is built on an island the conflicts between near-by developers and traffic facility operators make further bridge construction difficult. As improving the accessibility to an airport is not easy to achieve only by the IIA management's efforts, the central government level authorities should organize a committee with agencies concerned and analyze the characteristics of access traffic periodically to suggest reform measures for each organization concerned to implement appropriate undertakings at apt timing. For the future, central government's level empirical research on the airport accessibility for synthetic and systematic plan set-up is expected.

Evaluation of Fatigue Strength in Scallop at Field Bolted Joints of Longitudinal Rib and Deck Plate in Orthotropic Steel Decks (강바닥판 데크플레이트와 종리브 현장연결 스캘럽부의 피로강도 평가)

  • Choi, Dong Ho;Choi, Hang Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.6
    • /
    • pp.683-690
    • /
    • 2002
  • Static and fatigue tests were performed to evaluate fatigue strength in scallop at field bolted joints of longitudinal rib and deck plate in orthotropic steel decks. Numerical parametric studies using finite elemtn analysis were also conducted to show the influence of parameters such as length and radius of scallop, and thickness of deckplate on the stress concentration at the scallop. In the low stress level, fatigue tests yielded cracks at the scallop while in the high stress level, catastrophic failure of longitudinal rib occurred following the failure of handhole cover plate. Fatigue strength was compared with JSSC specification and the predicted S-N curves using Shigley and Juvinall methods, and a satisfactory result was obtatined.

The Study on Fatigue Design Loads of Steel Highway Bridges (강도로교의 피로설계하중에 관한 연구)

  • Kim, Sang Hyo;Lee, Chang Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.2 s.31
    • /
    • pp.159-169
    • /
    • 1997
  • Recently, due to the increasing overloaded heavy vehicles and traffic volumes fatigue failures of steel highway bridges frequently occur. Therefore, it is important to decide rational fatigue design procedure which can reflect lifetime cumulative fatigue damage reasonably. In this study, cumulative fatigue damages are simulated for various bridge systems and traffic conditions. The AASHTO LRFD fatigue design procedure is reviewed and the current fatigue design loading format, in which a single representative truck is loaded regardless of bridge width, is found to yield inconsistent safety level. Improved loading format with rational design load level for fatigue design is suggested.

  • PDF

On the Vibration Characteristics of Surface Blasting (지표발파의 진동특성에 관한 기초연구)

  • 양형식
    • Tunnel and Underground Space
    • /
    • v.2 no.2
    • /
    • pp.199-211
    • /
    • 1992
  • Blasting vibrations of 3 quarries and 5 construction sites were measured and investigated with two reference data. Square and cubic root scaled distance were similar in fitness to peak particle velocity of individual blasting site, but the former is better fitted in total. It was suggested that the limit scaled distance for domestic surface blasting be 40kg/$\textrm{cm}^2$ for 10mm/s level and 60kg/$\textrm{cm}^2$ for 5mm/s level, which were lower than the OSM's regulation. Prevailing vibration components were in the order of radial, vertical and transverse directions. Prevailing vibration components were in the order of radial, vertical and transverse directons. Site factors K and m were 242 and -1.283 for all studied area, 357 and -1.348 for construction sites, 118 and -1.160 for quarries. Most prevailing frequency was in the range of 10~2Hz. Overlapping effect of delayed blasting vibrations were insignificant. Vibration history of delayed blasting was longer than simultaneous blasting, and it became longer as measuring distance increased. Wave form and predominant frequencies were more complicated for delayed blasting than instantaneous blasting. The influence of blasting scale and measuring distance were not significant to determine peak particle velocity equation.

  • PDF

The Optimization of Hyperbolic Settlement Prediction Method with the Field Data for Preloading on the Soft Ground (쌍곡선법을 이용한 계측 기반 연약지반 침하 거동 예측의 최적화 방안)

  • Choo, Yoon-Sik;Kim, June-Hyoun;Hwang, Se-Hwan;Chung, Choong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.457-467
    • /
    • 2010
  • The settlement prediction is very important to preloading method for a construction site on a soft ground. At the design stage, however, it is hard to predict the settlement exactly due to limitations of the site survey. Most of the settlement prediction is performed by a regression settlement curve based on the field data during a construction. In Korea, hyperbolic method has been most commonly used to align the settlement curve with the field data, because of its simplicity and many application cases. The results from hyperbolic method, however, may be differed by data selections or data fitting methods. In this study, the analyses using hyperbolic method were performed about the field data of $\bigcirc\bigcirc$ site in Pusan. Two data fitting methods, using an axis transformation or an alternative method, were applied with the various data group. If data was used only after the ground water level being stabilized, fitting results using both methods were in good agreement with the measured data. Without the information about the ground water level, the alternative method gives better results with the field data than the method using an axis transformation.

  • PDF

A Study on the Cross Section Insurance to Provide for the Extraordinary Flood for the Reservoir of the Temporary Division Tunnel (가배수 터널을 이용한 이상홍수 대비 단면확보에 관한 연구)

  • Baek, Won-Hyun;Park, Ki-Bum;Jee, Hong-Kee
    • Journal of Environmental Science International
    • /
    • v.17 no.7
    • /
    • pp.733-741
    • /
    • 2008
  • The object of this study is the safety insurance of the dam to provide for the extraordinary flood. The safety insurance of the reservoir was taken by the preparatory discharge using the temporary division tunnel used during the reservoir construction. In this study, the Sungju reservoir was simulated. The existing discharge facilities of the intake tower of the Sungju reservoir could nat have influence on the flood control. When the Sungju reservoir operated to begin preparatory discharge for 48 hrs by the temporary diversion tunnel that have discharge of an 20-years frequency, the water level was lowered about 20 cm. When the Sungju reservoir operated to begin the continuous discharge after the preparatory discharge, the water level was lowered over 1m but the downstream at risk was caused by the resulted. If it is possible to operate to begin the preparatory discharge of the reservoir for 24 hrs by the temporary diversion tunnel, that will improve the flood control faculty of the reservoir without other hydraulic structure and safety of the Sungju reservoir will be higher.