• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.033 seconds

Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

Assessment of Risk Management Practices of CM Enterprise: The Need for an Enterprise-level Risk Management Framework (CM기업 현장운영 리스크 관리 실태 분석을 통한 효율적 관리 방안 제시)

  • Park, Kyungmo;Lee, Hyun Woo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.66-73
    • /
    • 2014
  • The Korean construction industry has been severely impacted by the 2008 global financial crisis, which resulted in a significant reduction in the overall contract amount. For survival, many construction management (CM) companies had to adapt a strategy of lowering bid prices to maintain their competitiveness. As a result of the strategy, companies faced a number of issues including their decreased capability in risk management. However, most risk management-related studies focused on construction risk management, yet these studies lacked consideration of enterprise-level risk management practices. To fill the gap, the objectives of the present study are (1) to investigate, the risk management practices of Korean CM companies, (2) to identify factors that determine efficient enterprise-level risk management practices, and (3) to propose a module for the development of enterprise-level risk management. Lastly, the efficiency of the proposed development module was validated by using a survey.

An Experimental Approach to Secure Freshwater Fish Shelter according to the Water Level Fluctuations in a Shallow Pond (얕은 연못에서 수위변동에 따른 담수 어류 피난처 확보를 위한 실험적 접근)

  • Ahn, Chang Hyuk;Joo, Jin Chul;Lee, Saeromi;Oh, Ju Hyon;Ahn, Hosang;Song, Ho Myeon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.9
    • /
    • pp.666-674
    • /
    • 2013
  • Physical disturbance, which induces a lack of flow rate, frequently occurs in freshwater ecosystem. Due to this, it is required to provide a new fish shelter to resolve. We installed a pilot scale test-bed to scrutinize the relationship between water level and the influence of fish shelter. The proposed ADP (artificial deep pool) is a fish shelter which composed of concrete materials. From the monitoring results in test-bed, it was observed that the population of fish was the highest at the 0.5 m in depth from the water level of experimental pond. But it was more appropriate for shallow water level (<0.3 m) to conserve the total number of fish by increasing the number per unit area despite of lower inner temperature and DO than outer environment. Therefore, inner of ADP was more efficient lentic system for fish to live due to higher WCS, OS, SS, and TS. In addition, there was a relative abundance of WCS fish species such as Acheilognathus koreensis (A. koreensis), Carassius carassius (C. carassius). Considered these results, it is suggested that ADP is appropriate to use for fish shelter and habitat for the fishes in lentic ecosystem.

Study on the Analysis of Present Situation and Improvement Direction of Construction Safety Empirical Education (건설안전체험교육의 현황 및 개선방향에 관한 연구)

  • An, Yong-Seon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.95-103
    • /
    • 2008
  • Construction safety should be considered prior to any other factors to execute construction projects smoothly and reduce the social expenses. Especially, the safety education is very important to the lives of labors and to control the four resources such as time, money, quality and safety. On this research, the present situation and related regulations of safety education are reviewed and the education contents and realities of the safety empirical education places are surveyed. Also questionnaire to education lecturers is performed to understand the satisfaction level of the education programs of the education places. Finally, the improvement directions are suggested to inspire trainees based on the results of the research.

Strategies to Promote Supervisor's Leadership for Preventing Accidents in Construction Projects (효과적인 건설재해예방을 위한 현장소장 리더쉽 육성방안)

  • Hong, Sung-Ho;Lee, Seung-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.63-69
    • /
    • 2006
  • The main purpose of this study is to present the strategies for strengthening the leadership of field supervisors to effectively prevent construction accidents. To this end, first, this research study reviewed the meanings, functions, types and characteristics of the leadership of field supervisors in safety management activities on construction sites through the literature review. Second, the researcher investigated the types of supervisors' leadership and the level of field safety management activities through questionnaires. Third, the types of supervisors' leadership are categorized by that level. Fourth, the leadership type of field supervisors is suggested to effectively prevent construction accidents. Finally, the strategies to promote supervisors' leadership are developed.

A Study on the Construction of 3D Noise Map for Ulsan-City (울산시 소음예측지도 작성에 관한 연구)

  • Lee, Chang-Myung;Song, Chang-Seob
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.144-145
    • /
    • 2010
  • 3-D noise map of Mugue Dong of the Ulsan City has been constructed. Comparing with the measured noise level, the predicted noise level has been confirmed for its accuracy. Correction factors for better prediction result using the constructed noise map have been investigated proving that its method is useful. The procedure of noise map construction method has also been introduced using RLS-90, Cadna A.

  • PDF

THE CONSTRUCTION OF SOME LEVEL ARTINIAN O-SEQUENCES

  • Shin, Yong-Su
    • Journal of applied mathematics & informatics
    • /
    • v.20 no.1_2
    • /
    • pp.541-548
    • /
    • 2006
  • We find a graded Artinian level O-sequence of the form $H\;:\;h_0\;h_1\;\cdots\;h_{d-1}\;h_d\cdots$ $^{(d+1-1_)-st}h_d$ < $h_{d+s}$ not having the Weak-Lefschetz property. We also introduce several algorithms for construction of some examples of non-unimodal level O-sequences using a computer program called CoCoA.

Formulation for Producing Risk Level of Each Construction Work (전문 건설업 재해분석과 위험도 산정방안)

  • Son, Ki-Sang;Gal, Won-Mo;Choi, Jea-Nam
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.141-147
    • /
    • 2010
  • Risk level for each construction work can be very important factors to establish advanced preventionmeasures. But it is important how to produce it. There are three different methods to set it up for consturuction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.

  • PDF

Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

  • Zalk, David M.;Spee, Ton;Gillen, Matt;Lentz, Thomas J.;Garrod, Andrew;Evans, Paul;Swuste, Paul
    • Safety and Health at Work
    • /
    • v.2 no.2
    • /
    • pp.105-121
    • /
    • 2011
  • Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

Development of Indices for the Diagnosis of Informatization Level at the Domestic Small and Medium Construction Companies (국내 중소건설업체 정보화수준 진단을 위한 지표개발)

  • Kim Wan-Soo;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.468-473
    • /
    • 2002
  • The pursuit of strategic infomatization plays a critical role in increasing the competitiveness of domestic companies in this rapidly changing era. In particular, infomatization of small and medium construction companies is lower than that of large companies in terms of company size and the range of infomatization. Also, the environment for the infomatization is very unfavorable. Thus, to ensure effective infomatization of small and medium construction companies, it is critical to assess the current level of infomatization, and ensuing initiatives should start by gaining an accurate understanding of the level that should be reached in the future by each stage. This paper purports to develop indices which are needed for the diagnosis of current level of infomatization and for the understanding of current realities, problems and requirements that the small and medium construction companies face while pursuing infomatization today.

  • PDF