Assessment of Risk Management Practices of CM Enterprise: The Need for an Enterprise-level Risk Management Framework

CM기업 현장운영 리스크 관리 실태 분석을 통한 효율적 관리 방안 제시

  • Park, Kyungmo (School of Civil & Construction Engineering, Oregon State University) ;
  • Lee, Hyun Woo (School of Civil & Construction Engineering, Oregon State University) ;
  • Kim, Changduk (Department of Architectural Engineering Kwangwoon University)
  • 박경모 (오리건주립대학교 토목 건설공학부) ;
  • 이현우 (오리건주립대학교 토목 건설공학부) ;
  • 김창덕
  • Received : 2014.03.03
  • Accepted : 2014.03.20
  • Published : 2014.05.31

Abstract

The Korean construction industry has been severely impacted by the 2008 global financial crisis, which resulted in a significant reduction in the overall contract amount. For survival, many construction management (CM) companies had to adapt a strategy of lowering bid prices to maintain their competitiveness. As a result of the strategy, companies faced a number of issues including their decreased capability in risk management. However, most risk management-related studies focused on construction risk management, yet these studies lacked consideration of enterprise-level risk management practices. To fill the gap, the objectives of the present study are (1) to investigate, the risk management practices of Korean CM companies, (2) to identify factors that determine efficient enterprise-level risk management practices, and (3) to propose a module for the development of enterprise-level risk management. Lastly, the efficiency of the proposed development module was validated by using a survey.

2008년 세계경제 금융위기 발생 이후 건설 수주물량이 감소되었고, 건설사업관리 (Construction Management) 업체들의 무리한 저가 수주로 인해 업체 경쟁력은 저하되었다. 이로 인해 CM기업들은 리스크 관리 대처능력 저하 등 여러 가지 문제점들이 발생되었다. 시공학적인 측면에서는 리스크 관리에 대한 연구는 지속되고 있지만 CM분야에 대한 리스크 연구는 매우 드물다. 따라서 본 연구는 국내 CM기업들의 리스크 관리 실태를 조사하여 문제점들을 분석하였으며 분석된 문제점들에 대한 효율적 관리를 위한 리스크 인자 도출 방안 및 리스크 관리 시스템 개발방안에 대한 방향을 제시하였다. 또한 본 연구에서 제안에 대한 실무자들의 설문을 통해 개발방안에 대한 효율성을 검증하였다.

Keywords

References

  1. Park, H. B. (2009). "Analysis on the Status of Research and Development by Technical Field of Construction Management in domestic and overseas", Gyeongsang National University.
  2. Wenzhe, T. (2007). "Risk Management in the Chinese Construction Industry", Journal of construction engineering and management, pp. 944-956.
  3. Chang, B. H. and Kim, S. D. (2006). "Improvement Plan and Analysis of Construction Safety Management for Risk Management, Korean journal of The Korea Institute of Building Construction, 22(6), pp. 53-61.
  4. Kang, I. S., Chang, H. S. and Park, H. T. (2001). "A Case Study on Risk Analysis of Large Construction Project", Korean journal of Construction Engineering and Management, KICEM, 2(2), pp. 98-108.
  5. Jang, R. W. (2009). "The Analyzing Risk Factors in Chinese Construction Project using AHP", Korean journal of Construction Engineering and Management, KICEM. 10(5), pp. 126-135.
  6. Cho, J. K., Hyun, C. T., Yoon, Y. S., Jin, R. Z. and Cha, Y. W. (2012). "Risk Factor Classification Weight Estimation for Urban Regeneration Project.", Korean journal of Construction Engineering and Management, KICEM, 13(4), pp. 89-101. https://doi.org/10.6106/KJCEM.2012.13.4.089
  7. Park, K. M., Im, C. W., Kim, C. D. and Jeong, H. S. (2013). "The Development of Next Generation Smart PMIS System.", Korean journal of Construction Engineering and Management, KICEM, 14(2), pp. 117-130. https://doi.org/10.6106/KJCEM.2013.14.2.117
  8. Jang, R. W., Yoo, B. G., Lee, Y. S. and Kim, J. J. (2009). "A Study on the Analyzing Risk Factors in Chinese Construction Projects using AHP.", Korean journal of Architectural Institute of Korea, 25(7), pp. 287-295.
  9. Xiang, P., Zhou, J., Zhou, X., and Ye, K. (2012). "Construction Project Risk Management Based on the View of Asymmetric Information." J. Constr. Eng. Manag, 138(11), pp. 1303-1311. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000548
  10. Zhou, H. and Zhang, H. (2010). "Dynamic Risk Management System for Large Project Construction in China". Geo Florida. USA. 2010 pp. 1992-2001.

Cited by

  1. Project Risk Factors Facing Construction Management Firms 2017, https://doi.org/10.1007/s40999-017-0262-z
  2. Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms vol.16, pp.6, 2015, https://doi.org/10.6106/KJCEM.2015.16.6.073
  3. Construction Management Risk System (CMRS) for Construction Management (CM) Firms vol.9, pp.1, 2017, https://doi.org/10.3390/fi9010005
  4. Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk vol.17, pp.2, 2016, https://doi.org/10.6106/KJCEM.2016.17.2.003
  5. A Study on the CM at Risk Business Model using Business Model Canvas vol.17, pp.3, 2016, https://doi.org/10.6106/KJCEM.2016.17.3.023