• 제목/요약/키워드: Construction information structure

검색결과 1,013건 처리시간 0.032초

현장 관리자 중심의 건축공사 가설기술 표준분류체계구축 (Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager)

  • 김민정;박준모;김옥규;최병주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

교량 상세 설계 및 시공을 위한 DMU 기술 적응 방안 연구 (Application of Digital Mock-Up Technology for Detail Design and Construction of Bridge)

  • 이윤범;김민석;이광명;신현양;박경래
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.277-282
    • /
    • 2007
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Most construction companies are trying to utilize some new information technologies for enhancing the structure quality, shortening construction time, and reducing the construction cost. Digital Mock-Up (DMU) technology utilizes 3D CAD/CAM system that shows the shape of a structure on the computer screen. By modeling and assembling the structure in 3D dimensional environments, some errors in design can be found before or during construction. In this paper, DMU technology was applied to the detail design and construction of In-Cheon Bridge and its effectiveness was evaluated. All components of a PSC box girder segment were modeled and assembled by using of 3D CAD tools and then, some interferences between components and errors were found and revised appropriately before construction. Consequently, DMU technology would improve the quality of the structure and reduce time and cost for construction.

  • PDF

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안 (Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM))

  • 현호상;이현수;이정훈;박문서
    • 대한건축학회논문집:구조계
    • /
    • 제35권2호
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

대공간구조물 건설정보의 웹 데이터베이스 개발 (The Development of Web Database for the Construction Information of Spatial Structure)

  • 장명호;박상윤;서삼열
    • 한국공간구조학회:학술대회논문집
    • /
    • 한국공간구조학회 2008년도 춘계 학술발표회 논문집
    • /
    • pp.27-30
    • /
    • 2008
  • 대공간 구조물은 거대한 단일 공간을 제공하는 장스팬 구조물이며, 규모면이나 구조물이 가지는 용도의 특성 때문에 도시를 구성하는 매우 중요한 요소로 작용하고 있다. 국내에서는 세계 최초의 게이블 돔 형식을 사용한 올림픽 제1, 제2 체육관이 1988년 서울 올림픽을 위해 건설되었으며, 이후 2002년 한일 월드컵을 기점으로 많은 대공간구조물이 건설되었다. 또한 최근에는 안산과 대구에 다목적 용도의 개폐식돔구장의 건설이 발표되는 등 대공간구조물의 건설이 증가하고 있다. 그러나 이에 관련된 건설정보를 제공하는 효율적인 매체의 부재가 문제가 되고 있다. 대공간구조물의 건설정보는 시공경험이 있는 업체 이외에는 공개되지 않으며, 학계나 관계에서도 관련 정보를 접하는 것이 제한되어 있다. 필요한 정보를 얻기 위해서 많은 시간과 비용이 낭비되고 있는 실정이다. 본 연구에서는 대공간구조물의 웹 데이터베이스 모델을 구축하여 대공간구조물의 건설에서 필요한 종합적인 정보를 제공하고자 한다.

  • PDF

USER-DEFINED PROPERTY SETS-BASED IFC EXTENSION FOR BRIDGE APPLICATION INFORMATION MODEL

  • Sang-Ho Lee;Sang Il Park;Munsu Yang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.433-436
    • /
    • 2013
  • This study suggests IFC-based bridge information modeling methods and its application model in BIM environment. Data model extension for bridge structure was achieved using user-defined property sets based on IFC framework. First, identification information was added. Bridge members are identified through physical and spatial semantic information added as property sets. Instances for semantic information were assigned according to standardized rules. Second, CO2 related factors were added for application information model. It can play a role to calculate and manage the quantity of CO2 emission. Third, properties for temporary structure to estimate and manage the construction cost were added. Finally, we investigated proposed methods through implementing the application information model of bridges.

  • PDF

해외건설 기자재 전자카탈로그 시스템 구축 (Development of e-Catalog System for Overseas Construction Equipments)

  • 안호준;박호병;장광섭;육종곤;이재천
    • 한국CDE학회논문집
    • /
    • 제13권2호
    • /
    • pp.98-108
    • /
    • 2008
  • Plant, civil engineering and construction equipment data of overseas construction are obtained and then analyzed, classified and integrated by experts. With those refined data set, we built classification system and defined property information with reference to international standard (ISO 15926, IRDL). If class in ISO 15926 is predefined for equipment of interest, we used the class as is. If not, we created and defined new classes on the basis of ISO 15926 classes. If there is similar class for equipment of interest, extension or inheritance methods were used. As a result, classification system of five levels and 637 classes were built and construction equipment information were expressed in open structure of XML such as tree structure of classification system and detailed information with number equipments for each specific equipment. We also developed the electronic catalog system which is basically equipment information management system providing various product search functions.