A Study on the PIMS and 3D Simulation Application of the Construction Field (건설공사 현장에서의 PMIS와 3D Simulation 적용에 관한 연구)

  • Tak, Seung-Won;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.967-970
    • /
    • 2007
  • If is become complicated and jumbo a construction project. therefore, is increased complication the management by enormous information. In addition, According IT technology develops, it is the course taking in IT technology for Construction project and information of construction technology in an object positively, It introduces a IT technique in construction project get out of personal experiences and knowledge that the expert and information joint ownership and collection and accumulation gets possible to advantage managed to advantage of Construction project. Also The information joint ownership and project progress situation grasp of construction project participation wild for being smooth, it is become accomplished, This research introduces the necessity and meaning of the PMIS or similar solution which is information-oriented structure and a information system of Construction industry of present. It applies the PMIS and 3D Simulation System from site and analyzes to expectative effect of information system construction

  • PDF

Improved Methodology of Construction Information Management in 4D CAD System (4D-CAD시스템의 공사정보관리 효율화방안)

  • Kang Leen Seok;Kim Chang Hak;Ji Sang Bok;Han Joo A
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1132-1135
    • /
    • 2004
  • Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

  • PDF

Analysis and survey of design decision making process in steel production process

  • Furukawa, Satoru;Yoshida, Tomohiro;Chi, Naiyuan;Okamoto, Hiroyuki;Furusaka, Shuzo
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.30-37
    • /
    • 2020
  • In the building construction, the steel-frame work occupies an important position in terms of structure, cost and quality. Especially in Japan, steel frames have traditionally been the main structure of many buildings. For steel-frame works in such positions, this paper investigates an existing steel fabricator to clarify the actual conditions of design decision making process and management method in steel production process. This study focuses on a steel fabricator (Company M in the following sentences), whose main market is Japan and which has facilities in Thailand, China, and Japan. Company M uses QR codes to control the production status of products, and exchanges all information between inside and outside the company via specialized departments in the form of documents. The authors have already analyzed the relationship between production lead time and defect rate based on actual project data at Architectural Institute of Japan in 2016. In 2019, we expressed the process from the confirmation of the design information of the current steel frame to the production by WBS, and clarified the relationship between the production lead time and steel frame product quality structurally. In this paper, the authors reoport the progress of the survey conducted so far, the positioning of the collected data, and the future survey policy.

  • PDF

The Study of improving the UWB data rates using Bi-Phase modulation (Bi-Phase와 펄스 위치 혼합 변조를 이용한 UWB 전송율 개선)

  • 서신흥;고영은;방성일
    • Proceedings of the IEEK Conference
    • /
    • 2003.07a
    • /
    • pp.553-556
    • /
    • 2003
  • In this paper was studied the improvements and increasements of the data transmission rate in UWB (Ultra wideband) systems. so Considered that previous UWB systems of code structure and proposed the New constructure that was synthesized the PPM and Bi-Phase Modulation structure, may increase the data transmission rate of multiple channel structure using Time-slots. This proposed structure was modeled suitable at Home Networking conditions and was simulated. and so measure the performance of coding construction, and compare that New synthesized structure with early structure. so we can verify the superiority of New experiment.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

Development of Construction Information Management Module through the Use of Vector-Photo (벡터사진 활용을 통한 시공정보 관리모듈 개발)

  • Kim, Kyoon-Tai;Lim, Myung-Gu;Kim, Gu-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.619-626
    • /
    • 2013
  • Many pictures are taken at a construction site, but the information of the pictures is not managed in an efficient and systematic manner. For this reason, when a construction worker has scant field experience or knowledge, it is hard to communicate with others efficiently. Therefore, the information of the pictures taken is not fully utilized in any deliberation or conflict among interested parties, facilities maintenance, and construction of another structure, although they were taken for those purposes. This study discusses the need for combining vector-photos with image and 5W and 1H information, and develops a prototype module for creating vector-photos and saving them in a server. The vector-photos taken can be saved to a server in real time, and efficiently managed by a DB system. If a system to link the vector-photos with a BIM model is developed in the future, it is expected that the vector information in the picture can be connected with the property information of an object. As a result, the vector-photos can be utilized in more diverse ways.

A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance (서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안)

  • Park, Shin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.

Real-time Knowledge Structure Mapping from Twitter for Damage Information Retrieval during a Disaster

  • Sohn, Jiu;Kim, Yohan;Park, Somin;Kim, Hyoungkwan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.505-509
    • /
    • 2020
  • Twitter is a useful medium to grasp various damage situations that have occurred in society. However, it is a laborious task to spot damage-related topics according to time in the environment where information is constantly produced. This paper proposes a methodology of constructing a knowledge structure by combining the BERT-based classifier and the community detection techniques to discover the topics underlain in the damage information. The methodology consists of two steps. In the first step, the tweets are classified into the classes that are related to human damage, infrastructure damage, and industrial activity damage by a BERT-based transfer learning approach. In the second step, networks of the words that appear in the damage-related tweets are constructed based on the co-occurrence matrix. The derived networks are partitioned by maximizing the modularity to reveal the hidden topics. Five keywords with high values of degree centrality are selected to interpret the topics. The proposed methodology is validated with the Hurricane Harvey test data.

  • PDF

A Strategy of Information Management System for Construction Company (건설산업의 효율적 정보관리체계 구축전략)

  • Lee Tai Sik;Kim Yong Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.458-461
    • /
    • 2001
  • The whole of industry sectors are getting achieved BPR(Business process Reencountering) which innovate the inefficient product organization through examined the value chain. Besides, they try to integrate ERP, CRM, and SCM which is based on value chain. Construction Industry, however, not only is not regularized it but is not inadequacy about information mind. Nowadays Korean government lead the construction CALS, only some large company Innovate and restructure the organization and product structure. It Is necessary to efficient manage the project information and historical data and develop CIC/PMIS to transfer from the function based information-flow to the project based information-flow. The purpose of the Information management system's success In Korea, therefore, this paper analyzes the information-intensive problems and proves the device to achieve the Information Management System through the Standardization, Synchronization, Centralization for Construction Company.

  • PDF