• Title/Summary/Keyword: Construction field management

Search Result 1,283, Processing Time 0.033 seconds

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

Proposal of improvement measures according to the limiting factors of the use of drone technology : Cases in the construction field

  • Yoo, Soonduck
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.4
    • /
    • pp.30-38
    • /
    • 2021
  • This research explored methods for improvements to be made within the field of drone usage within the construction industry based on an investigation of factors which limit their efficiency and productivity. Limiting factors and improvement measures were presented in terms of technology, service, law and policy for employing drones at construction sites. Our first suggestion is, from a technical point of view, that companies need to expand professional manpower and infrastructure for systematic management. Second, in terms of service expansion, it is necessary to have management capabilities for operation such as the use of drones with enhanced safety and reinforced on-site education and personal information management. Third, in terms of legal and institutional support measures, it is necessary to prepare a plan for reforming the legal system for revitalization and to expand the training of professional manpower. This study may contribute not only to the development of drone technology, but also to effectively respond to various problems that appear at construction sites.

A Study about Electronic Document Unification for Construction Job-site Report (건설현장보고 전자문서 일원화에 관한 연구)

  • Jeong, Seong-Yun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.925-928
    • /
    • 2007
  • As the field report data does not normalize, ordering organization requires different form every time and field reporters make out form as random, data and report to the ordering organization by different medium such as FAX, e-mail, paper document. Therefore, Field reporters must set and make out same information in required pattern. And ordering organization is being responsible for side works of totalizing and processing the reported data. This research suggests the electronic document unification about monthly construction progress report and construction present condition report system. In addition, it suggests electronically processing function that can handle field report business to unifying electronic documents. As using the result of this research, it will improve the work efficiency and simplify in report business.

  • PDF

Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites (모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안)

  • Jun, Young-Hun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF

Analysis of Essential Function of Composite Sensor for the Ground Work of a Large Construction Project (대형 건설프로젝트 현장관리를 위한 복합센서의 필수기능 분석)

  • Cho, Nam-Seok;Kim, Chang-Won;Cho, Dae-Gu;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.39-40
    • /
    • 2012
  • Construction IT convergency proposes advanced management abilities of a construction project. Sensing data provided by various sensor technologies can be utilized for diverse management areas. This study analyzes required functions of sensors for implementing time, cost, safety and quality management, focusing on the ground works including excavation, pipe installation, retaining wall etc. Therefore, this study first generates essential management areas, analyzes cutting-edge sensor technologies appropriated for the areas, and finally proposes a matrix system that represents relationships between the management areas and sensor technologies, The proposed system is expected to reinforce construction management abilities by integrating sensor technologies.

  • PDF

A PRACTICAL HUMAN RESOURCE MANAGEMENT PLAN FOR FOREIGN CONSTRUCTION WORKERS

  • Seung-Heon Han;Eui-Jae Jin;Sang-Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1216-1222
    • /
    • 2005
  • A shortage of construction field workers has been a serious problem, both in the developed and in the developing countries. As a solution for conquering this problem, these countries import foreign laborers from nearby less-developed countries. While this contributes to lessening the labor deficiency, foreign workers are relatively inefficient in productivity and are often exposed to the cross-cultural risks due to cultural differences, communication difficulties, different work ethics and customs, etc. Despite these facts, construction firms do not well address these issues and are lagged in establishing an appropriate management strategy against it. This paper presents a practical management plan for foreign construction workers through Focus Group Interviews (FGI) and survey investigation. On this basis, this study examines the level of awareness and important managerial aspects of the issue of foreign laborers. Finally, it suggests a cross-cultural and ready-to-use practical human resource management plan for facilitating the foreign worker's productivity.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card (균형성과표를 활용한 건설사업관리의 핵심성과지표 도출)

  • Lim, Wooseok;Jung, Jihyun;Lee, Hakki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.22-30
    • /
    • 2015
  • Enterprises should set up realizable goals and continually control the goals from apprehending whether they can be realized or not so that the enterprises grow consistently. Furthermore, from supplementing parts to be improved, goals are reset and the result should be controlled in order to fit to them. Lately, a lot of discussions about the results of organizations, projects, and companies are being realized in construction field. Particularly, in construction management, effective and professional control activities throughout the life cycle of facilities as well as the stage of business implementation of construction work are needed. About the result measurement of the construction management, lots of most domestic researches stay in the level of establishing basic concepts. Also, since characteristics of the construction field and the construction management were not reflected properly, it is in a situation that the result control system is not applied to on-site real works. Hence, this study intends to suggest fundamental data for measuring objective results from extracting result areas and key performance indicators of the construction management using Balanced Score Card.

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

A Study on the Improvement of Safety Management of Public Sector in the Construction Industries (공공부문의 건설공사 안전관리 개선방향에 관한 연구)

  • Shin, Dong Hyuk;Lee, Myeong Gu;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.78-86
    • /
    • 2019
  • Various safety measures have been established and implemented in order to reduce construction accidents. However, statistics data on at construction sites still show higher accident and mortality rates than other industries. As a result of investigating the causes of accidents occurring in the construction industry, most accidents resulted from the failure of the system. Therefore, the existing safety management system of the construction site is monitored so that it operates properly in the field, and it is an important factor to actively participate in construction work. In order to overcome this, the government emphasized on-site inspections and planning and implementation confirmation by public institutes to ensure the effectiveness of the safety management system through amendment of the Construction Technology Promotion Act, but the orderer' safety capability and manpower are insufficient at present. Therefore, in this study, the safety management system, such as design for safety, safety management plan, safety check, safety management cost, etc. specified in the Construction Technology Promotion Act, is regularly checked and confirmed to improve the effectiveness of the safety management system as well as to improve the safety management system of the construction site by deriving measures to strengthen the public function of the government.