• Title/Summary/Keyword: Construction facility

Search Result 1,622, Processing Time 0.029 seconds

A Study on the Definition of the Educational Facility Maintenance (교육시설물 유지관리 업무규명에 관한 연구)

  • Shon Woo-Kyung;Kim Jang-Young;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.567-570
    • /
    • 2002
  • our country school construction from 1990 year middle the facility expension for the improvement or education environment and the maintenance expense of various conservative construction for old education facilities is increasing. It accomplishes the each subject wild for business which maintains the training facility enterprise to be, the minute paragraph of information and deficient standard of information. It brings about the duplication investment a waste of the revenue source which is limited. Occurrence information which it follows consequently in business process and requirement must clear. We the maintenance phase of the education facilities understand, problem point and obstacle VIP analysis it leads it presents it does analyze. The improvement process model which leads a hereafter function for obstacle VIP extraction and information model construction must be accomplished.

  • PDF

WEB-BASED SERVICE REQUEST & FEEDBCK SYSTEM: THE LIFE CYCLE MANAGEMENT AS CONTINUOUS CUSTOMIZATION OF FACILITY INFORMATION

  • Jinsu Jeong;Kwang Jun Lee;Valerian Miranda
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.836-840
    • /
    • 2005
  • This research investigates the feasibility of Web technology as a means of delivering facility information for better support facility operation and maintenance. Our research proposes a Web-based feedback system as a pragmatic solution to the limitations of current FM (Facility Management) processes. In practice work orders and records are often misplaced resulting in lower efficiency and customer satisfaction. This may be overcome by a system that states information digitally and provides a Web-based interface. The interface could allow customers to report facility problems, trace their work order in progress, view schedules for maintenance and provide feedback for service online. The benefit for a FM department is that it can receive feedback on performance which would improve the quality of service and build a record of practical experiences.

  • PDF

A Study on A Facility Maintenance Management Method Using 2D CAD and Spatial Database Update Techniques (2차원 CAD 건설도면과 공간DB 갱신기술을 활용한 시설물 유지관리 방안에 대한 연구)

  • Ko, Won-Keun;Park, Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.670-673
    • /
    • 2008
  • The aim of this study is for performing the efficient and systematic facility maintenance management by using 2D CAD data and the technique of updating spatial DB. The existing system of the facility maintenance management and the performance is not properly made out utilizing the information about the construction drawings. Moreover, the management of the DB renewal, which is about the information of construction drawing, is not carried out properly Furthermore, this study draw the conclusion on the effectiveness of reducing maintaining active by the lack of the interior and exterior location information. This study suggest the method of the efficient maintenance management of facilities by using the technique of updating spatial DB and the facility location information.

  • PDF

A Study on the Improvement of Agricultural Facility Legislation (농업용 시설의 건축 및 이용 법령 개선연구)

  • Lee, Won;Jang, Woo-Suk;Kwon, Hyung-Dun;Song, Jae-Il;Kim, Ji-Suk;Jung, Nam-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.4
    • /
    • pp.73-79
    • /
    • 2013
  • As facilities performing the production, processing, preservation, and shipment of agricultural products; agricultural facilities are categorized into planting facilities and livestock facilities based on the management target. Agricultural facilities are set in farmlands, and facility users mainly complain about the legal or institutional restrictions on farm rather than their own facilities itself. From 2009 to 2012, the Ministry of Agriculture Food and Rural Affairs (MAFRA) published the "Casebook of farmer Complaints on Farmlands" in order to help answer farmers' questions and support public workers' workloads. However, contents related to agricultural facility installed in farmland are currently not dealt with in particular. Among agricultural facilities, demands of property rights with livestock facilities have risen due to construction permissions, operational restrictions, and high initial investment costs; and relevant laws were revised and are now being executed. However, for planting facilities such as mushroom facilities, ginseng facilities, and greenhouses; farmer complaints related to property rights are constantly increasing because revisions to relevant laws are not being made despite the rising diversity of construction materials through technical developments as well as the rising scale of assets-i.e. mechanization, automation, and the application of New Regeneration Energies according to capital influx. In this study, the current state of relevant agricultural facility legislation were organized and their drawbacks deduced in order to propose improvements of Agricultural Facility Legislation. The result of interviewing with public workers and farmers show that agricultural facilities should be regarded as extensions of farmlands rather than as facilities built in land where development actions were being taken. Alternatives able to reflect these opinions were suggested through expert consultation.

AR system for FAB construction management using BIM data under fast track condition (패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발)

  • Lee, Sang-Won;Lee, Kwang-Soo;Choi, Sung-In;Ryu, Seong-Chan;Park, Jung-Seo
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

Optimal Implementation of the Value Management Processes for Capital Facility Projects (건설산업에서의 가치경영 프로세스 효율적 활용 방안)

  • Cha, Hee-Sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.89-94
    • /
    • 2004
  • Many innovative management processes, which are also termed as best practices or value improving practice, have been proven to successfully improve the value of capital facility projects. With a lack of any guidance on how to implement the most suitable value management process for a particular project, the objective of this paper is to facilitate the VMP implementation. A CII (Construction Industry Institute)'s recent study, titled as 'Development of the Value Management Toolkit,' encompasses a comprehensive structure of value management and provides a new methodology in optimizing the implementation of the value management processes in order to leverage the unique project circumstances, such as project objectives, resource availability, and site limitations, etc. As a pioneering study, the findings contribute to the expedition of implementing value management processes in the industry and maximize the potential benefits in applying the most benefiical value management process for a particular capital facility project.

  • PDF

Development Method of BIM Data Modeling Guide for Facility Management : Focusing on Building Mechanical System (시설물 유지관리를 위한 BIM 데이터 입력기준 개발방안 : 건축 기계설비를 중심으로)

  • Won, Ji-Sun;Cho, Geun-Ha;Ju, Ki-Beom
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.4
    • /
    • pp.216-224
    • /
    • 2013
  • Facility data is created throughout the design and construction phase. But the most facility managers bear significant costs that arise from the lack of interoperability with facility lifecycle. This paper is concerned with the way to collect facility data using BIM technology. The aim of this paper is to suggest BIM data modeling guide for the facility management using the information that need to be delivered from design and construction phase to operation and management phase. The BIM data modeling guide focus on the properties of mechanical equipment. It is to be hoped that this study will contribute to collect facility data from as-built BIM data and to build facility management system database without difficulty.

The construction of Underground Facility Unification System Using Web Base GIS (웹기반 GIS를 이용한 지하시설물 통합 시스템 구축)

  • 강준묵;강영미;이강원
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.287-290
    • /
    • 2003
  • The base composition for a construction information union and application is insufficient, because the existent information driving for the underground facility is separately promoted from management organization. This Study is to analyze a accuracy by converting pre-constructive underground facility database to the unification database of digital map base and improve the accuracy for a field surveying. moreover, These results is to construct the information common system of web base GIS by jointing internet technology.

  • PDF

Evaluation of Handover Requirements of Construction Information for Efficient Facility Management (효율적인 자산관리를 위한 건설정보 이양요건 평가)

  • Lee, Ikhaeng;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.12-20
    • /
    • 2018
  • As facilities have become larger, more complex, and advanced, the importance of the facility management in the operation phase of the building is increasing. As a result, the scope of the facility management function is expanding, and the requirements of information are ever-increasing. However, inefficient exchange of information occurs due to duplicated tasks and lack of collaboration among the construction life cycle phases, resulting in cost loss. These low interoperability issues can be complemented by construction information management from a life cycle perspective. Efficient construction information management at each life-cycle stage is derived from the owner's will and is materialized through the construction information handover requirements by the owner. The purpose of this study is to develop an evaluation method of construction information handover requirements for facility management. In order to develop the method, facility management types and business functions are also classified and defined in this paper. Using the methodology proposed by this study, a case-study of evaluating the 'takeover items' submitted by contractors was performed for the purpose of research validation. The results of the case-study found that the most effective areas are in the order of 'legal informations', 'drawings', 'guides', etc. This study can be used as a reference data for deriving handover requirements for construction information at the early stage of the project.

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.