• 제목/요약/키워드: Construction document phase

검색결과 26건 처리시간 0.026초

안전사고 예방을 위한 요인 분석에 관한 기초적 연구 -요일별, 일일공사금액 및 일일 작업양별 요인을 중심으로 (Preliminary Study on the Factor Analysis for Accident Prevention)

  • 윤귀용;김상철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.179-183
    • /
    • 2010
  • The safety accident is one of the formidable issues in construction field, and in order to prevent safety accident, contractors perform safety education, safety control document, meeting with labors, and safety instruction in construction phase. However, safety accident is occurred continuously, it is needed to analyze which factors are affected to safety accident. day of the week, daily construction cost, and daily work task were selected as those factors. The result in this research represented that those factors were not considered as an critical one in safety accident. Because of approach limitation to safety accident, only two case studies were collected. If more safety accident cases are gathered in future study, it will clarify the cause of safety accident and will prevent safety accident.

  • PDF

산업설비 업무 분석을 통한 설계단계 정보 분류체계 (Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis)

  • 송영웅;조항민;최윤기
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.3-15
    • /
    • 2009
  • 최근 해외 건설시장 플랜트 분야의 수주 증대에 따라 오일 가스 분야의 프로젝트가 증가하고 있다. 따라서 국내 건설 산업 업체들의 해외 플랜트 사업의 경쟁력을 확보하기 위해서는 생산성 향상 기술 경쟁력 확보 전략적 경영 추진 등 적극적인 대처 방안 수립이 요구되고 있다. 그 중에서도 해외 플랜트 사업의 오일 가스 분야는 산업 경쟁력 향상을 위하여 프로젝트 수행과 관련한 EPC(Engineering Procurement Construction) 유통 정보의 활용이 더욱 요구되지만, EPC 단계별 다양한 업무에서 발생하는 유통정보 콘텐츠를 효율적으로 관리하기 위한 콘텐츠 분류체계가 제시되고 있지 못하고 있다. 그로 인하여 설계도면의 변경, 중복업무의 발생, 업무주제간의 정보 누락 등의 문제점이 발생하고 있다. 이런 문제점으로 인하여 시장점유율이 감소하고 있으며 경쟁력이 약해지고 있다. 따라서 본 연구는 오일 가스분야의 콘텐츠 관리체계의 실무적 활용의 증대와 건설산업 정보관리의 효용성을 향상시키기 위하여 콘텐츠 관리 체계를 확립하기 위한 BPM(Business Process Management) 기반의 콘텐츠 분류 체계를 제시하고, 국내기업의 경쟁력이 가장 낮은 설계단계의 Business Process를 정의하고 요구되는 지식의 유형을 체계화하고, 콘텐츠 정보를 분석하여 설계단계 산업설비 유통정보의 체계화를 지원하고자 한다.

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

항공기 통합기술정보시스템(ITIS) 개발 및 운용 (Development and Operation of Integrated Technical Information System(ITIS) for an Aircraft Development)

  • 정준영;이준우;김천영
    • 한국콘텐츠학회논문지
    • /
    • 제6권2호
    • /
    • pp.75-83
    • /
    • 2006
  • 항공기 체계부에서는 연구개발 과정에서 발생되는 기술자료에 대해서 데이터베이스 관리시스템을 이용하여 체계적으로 관리하는 기술자료 관리시스템을 운용하였으며, 수행중인 항공기 개발 사업에 프로젝트별로 연구개발 기술자료를 관리하였다. 그러나 사업별로 분리하여 사용자 관리 및 기술자료를 관리함에 따라 업무메모 워크플로 및 기술자료 검색 등에 문제점을 야기하였으며, 이에 따라 사업별 기술자료 관리시스템을 통합 관리할 수 있는 웹기반 통합기술정보시스템을 개발하였다. 본 시스템의 구축 및 운용으로 사용자 및 권한을 관리하여 사업별로 접근할 수 있고, 통합기술정보시스템의 통합 화면에서 각 사용자별로 필요한 업무메모 워크플로 및 기술자료 검색을 효율적으로 수행할 수 있어 사업별 기술자료 관리 및 활용 등 연구 생산성을 극대화하였다.

  • PDF

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구 (A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase)

  • 박승화;김흥수;윤두영
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

디지털 패브리케이션 전문 건설업체 역할 및 성과 분석 - 비정형 포디움 시공 사례를 중심으로 - (Specialty Contractor's Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction -)

  • 함남혁;안병주;김재준
    • 한국BIM학회 논문집
    • /
    • 제8권1호
    • /
    • pp.43-55
    • /
    • 2018
  • Recently, there have been increasing studies on the application of digital technology, which has its focus of the irregular building. However, most of these studies have not clarified the objective of the technology and the effectiveness of professional manpower on its performance. This study analyzes actual used technology and the role of specialty contractor. It presents a framework to quantify the performance of the specialty contractor. For these purposes, this paper presents a proposed method to evaluate the activities of specialty contractors using a queueing model. As an attempt to verify the model, an actual irregular building project, in which digital fabrication is applied, is investigated during the construction phase. In order to collect the digital fabrication data, digital fabrication reports and specialty contractor's work log of project are reviewed. In addition, Digital Fabrication input personnel, productivity data are collected through interviews with experts involving in the case project. Analysis of specialty contractor's performance in digital fabrication reveals that the wait status of project participants varies probabilistically depending on the digital technology application level. The results of this study are expected to contribute toward the improvement of the production level in the construction industry.

공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발 (Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects)

  • 신창준;김윤겸;조규만;현창택;홍태훈
    • 한국건설관리학회논문집
    • /
    • 제12권1호
    • /
    • pp.13-22
    • /
    • 2011
  • 클레임의 발생원인과 예방에 대하여 많은 연구들이 수행되어 왔으나, 개선방안 혹은 제도개선, 대응방안 등에 대한 연구가 대부분이었다. 특히, 잠재되어 있는 클레임에 대한 구체적인 내용들을 정리하고, 예방을 위한 실무적인 연구는 미흡한 실정이다. 그러므로 향후 발생할 수 있는 클레임에 대해, 그 중 설계단계에서 잠재될 가능성이 큰 원인들을 사전에 검토 및 재확인하여 클레임을 예방할 수 있는 수단이 부족하다. 본 연구에서는, 클레임이 발생되는 시기가 대부분 시공단계이지만 클레임의 원인은 설계단계에서 발생하는 점에 착안하여, 설계단계에서 잠재된 클레임 예방을 위하여 설계단계의 설계서 등을 포함한 계약문서를 중심으로 연구를 수행하였다. 클레임의 근거서류를 준비하고, 관련법규의 적용규정을 확인하면서 클레임 발생원인을 짚어볼 수 있는 체크리스트를 개발하였다.

BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

BIM 적용을 위한 기획설계 단계의 파라메트릭 디자인기법에 대한 연구 (A Research on the Parametric Design Method in Pre-Design Phase for BIM application)

  • 하승범
    • 문화기술의 융합
    • /
    • 제7권1호
    • /
    • pp.92-98
    • /
    • 2021
  • 합리성과 효율성을 끊임없이 요구받고 있는 현대사회의 시대적 흐름은 사회 전체의 패러다임이 되었다. 이 패러다임은 건축설계와 건설업계에도 큰 영향을 미치고 있다. 디지털 도구의 발전과 인터넷을 통한 정보기술(Information Technology)로 대변되는 현대 기술은 건축설계와 건설업계에서 파라메트릭 디자인(Parametric Design)과 BIM(Building information Modeling)이라는 두 개의 큰 흐름을 생성하고 발전하고 있다. 비록 각기 다른 이유로 탄생했으나 효율성과 합리성이라는 공통의 목적으로 서로의 경계를 넘나들면서 건축설계와 건설업계에 큰 영향력을 보이고 있다. 이러한 맥락에서 본 연구는 BIM 설계에 적용을 초기 기획설계단계에서의 파라메트릭 디자인이 어떻게 이루어져야 하는지에 대한 내용을 예시를 통해 구현해 보고자 했다. 해체주의(Deconstructivism) 건축가 "프랭크 게리"(Frank O. Ghery)의 작품인 월트디즈니 홀(Walt Diseny Consert Hall) 설계의 프로세스에 대한 고찰과 체코프라하의 네덜란덴 빌딩(National Nederlanden Building)의 형태를 파라메트릭 설계 툴(Tool)을 사용하여 기획설계단계에서의 형태를 구현하고자 했다. 향후 이 연구는 기획설계단계에서의 파라메트릭 디자인의 범위를 넘어서 궁극적인 BIM의 적용 즉 계획 및 실시설계 그리고 시공에 이르는 건설산업 전반에 적용 가능한 기초 자료로서의 목적에 사용되고자 한다. 향후 파라메트릭 디자인 알고리즘을 활용한 계획 및 실시설계단계에서의 BIM의 적용을 진행하고자 한다.