• Title/Summary/Keyword: Construction delay

Search Result 629, Processing Time 0.039 seconds

The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site (Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향)

  • Lee Sang-Hyuk;Lim Myung-Bok;Lee Jae-Sung;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2003
  • There are many problems in management of high-rise building construction performed in downtown area due to limited spaces and equipments for increasing kinds and quantities of material. By these restrictions, problems such as increase of construction cost. delay of construction period, decrease of productivity, occurrence of accident are caused. Recently, studies on JIT concept have focused on construction materials as a solution for the problems. But, studies about finishing material are insufficient yet. Accordingly, this study suggests flowing of current material management, JIT management effect, and development direction of lifting-up and procurement system with Low-emissivity double Glazing, among of main finishing materials.

  • PDF

Research on the Strategy for Outsourcing in Construction Projects: in Fast-track Project (건설프로젝트에서 전략적 하도급 방안에 관한연구 : 설계시공병행방식 사례를 중심으로)

  • Choi, Soo-Ho;Choi, Hyun-Chul;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.551-559
    • /
    • 2014
  • Fast-tracking was developed as an optimizing method to shorten the duration of construction project in 1960's, and it introduced to Korea in 1999. Since then, many Korean companies have been used fast-tracking for getting economical benefit from shorten duration. However, there were some problems(dispute, delay and cost overrun) because of using inappropriate subcontractor management system. For this reason, previous studies suggested some management models to solve these problems. Unfortunately, however, the models have been had some doubts about reliability, objectivity and possibility of using them on real construction site. Therefore, this study suggests 3 steps of strategic subcontracting method and apply it on real fast-tracking practice(L company) to secure reliability and objectivity. Through this, the method is expected to make up the doubts of previous studies.

A Case Study on the Construction of Concrete Lining in Parallel with Blasting in a Long Tunnel (장대터널 굴착시 발파-라이닝 병행시공 사례연구)

  • Ryu Joung-Hoon;An Hyung-Jun;You Jin-O;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.39-48
    • /
    • 2006
  • The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.

A Study for Selecting the Plant Project Risk Management Check List (플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구)

  • Choi, Doo-hoi;Bang, Hong-soon;Lee, Tae-hyeong;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.54-64
    • /
    • 2018
  • Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.

A Case Study of GTX A Tunnel Station Blasting with Electronic Detonator (GTX A 터널정거장에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.24-34
    • /
    • 2021
  • Electronic detonators are widely used in various construction sites due to accurate delay time. Including the cases with exceeded noise and vibration from site using electric/non-electric detonator, electronic detonators are used to improve blast fragmentation or to reduce the cost of secondary partial blasting. Furthermore, the number of cases using electronic detonators are increased for reduction of the cost and construction period by maximizing operations efficiency. This case study is about applying electronic detonators on large section station, tunnel construction site which is the part of urban area GTX A project. Although it was initially planned to utilize non-electric detonators, damage was inflicted on safety-thing. We have considered blasting method using electronic detonators as solution of this problem. By applying electronic detonators, we not only satisfied environmental regulations but also prevented nearby safety-thing from getting damaged. In addition, we were able to shorten the construction period than the initial plan by conducting single simultaneous blasting on large section station, in order to ensure safe and efficient construction.

A DEVELOPMENT OF RFID/USN-BASED INTELLIGENT EQUIPMENT FOR CONSTRUCTION SUPPLY CHAIN MANAGEMENT

  • Tae-Hong Shin;Su-Won Yoon;Sangyoon Chin;Soon-Wook Kwon;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.472-478
    • /
    • 2009
  • The scopes of the supply chain management in construction projects has expanded from the field management focusing on field storage, transportation, and lifting to the whole supply chain from the materials to field. The expansion of the supply chain management can raise the possibilities of leaner production, which enables shortened lead time of the difficult-to-operate materials, and prevents the work interference or delay. However, the expanded management range requires more information and management than an existing management style currently used for factory production of iron frame, curtain wall, PC, etc. In addition, there are limitations that expand the existing management style into the new supply chain management in construction projects and therefore it is required to automate the existing management style in order to extend the management range. The objective of this study is to propose the process and equipment that can manage the supply chain of the materials which range from the factory production to the field storage based on RFID/USN techniques, introducing small-sized transportation equipment(intelligent pallet), the vehicle tool kit(intelligent trailer), and in-and-out management equipment(Gate Sensor) as a prototype to effectively develop the appliances for operating the proposed process, and present the application possibility of the appliances. The full paper will present then the test results that the proposed appliances for the supply chain management automatically transmit and receive the generated information between the appliances or the appliance and sever under various wireless network circumstances such as zigbee, wibro, Wi-Fi, and CDMA.

  • PDF

Measuring the Impact of Supply Network Topology on the Material Delivery Robustness in Construction Projects

  • Heo, Chan;Ahn, Changbum;Yoon, Sungboo;Jung, Minhyeok;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.269-276
    • /
    • 2022
  • The robustness of a supply chain (i.e., the ability to cope with external and internal disruptions and disturbances) becomes more critical in ensuring the success of a construction project because the supply chain of today's construction project includes more and diverse suppliers. Previous studies indicate that topological features of the supply chain critically affect its robustness, but there is still a great challenge in characterizing and quantifying the impact of network topological features on its robustness. In this context, this study aims to identify network measures that characterize topological features of the supply chain and evaluate their impact on the robustness of the supply chain. Network centrality measures that are commonly used in assessing topological features in social network analysis are identified. Their validity in capturing the impact on the robustness of the supply chain was evaluated through an experiment using randomly generated networks and their simulations. Among those network centrality measures, the PageRank centrality and its standard deviation are found to have the strongest association with the robustness of the network, with a positive correlation coefficient of 0.6 at the node level and 0.74 at the network level. The findings in this study allows for the evaluation of the supply chain network's robustness based only on its topological design, thereby enabling practitioners to better design a robust supply chain and easily identify vulnerable links in their supply chains.

  • PDF

A Study on the State of Claims and Disputes in Interior Design Projects - Focusing on Practices and Experiences of Interior Designers - (실내디자인 업무의 클레임 현황과 분쟁사례 분석에 관한 연구 - 실내건축가를 대상으로 한 실무사례를 중심으로 -)

  • Lee, So Young;Kim, Wook Seon
    • Korean Institute of Interior Design Journal
    • /
    • v.27 no.3
    • /
    • pp.116-125
    • /
    • 2018
  • With rapid economic development in Korea, interests in interior design have increased gradually. However, interior design markets were poorly evaluated from 2015 Korean Consumer Evaluation. It is necessary to identify what kinds of problems, defects, and consumer claims have arisen during interior design planning and construction procedures. Therefore the purpose of this study is to investigate claims and disputes in interior design project procedures and to find out when defects or claims take place in those procedures in order to reduce claims or defects. Email questionnaires were distributed to KOSID members (professional interior designers) using Google Survey. In addition, a focus group interview was conducted. A total of 54 responses were collected and analyzed using SPSS 19. As a result, in an agreement stage, alteration in materials is the major source of claim. More than a half of respondents addressed time shortage for programming and planning. During the construction stage, approximately 31% respondents experienced client dissatisfaction with materials and finishes. The reason for project completion delay was due to claims during construction. The claims most frequently appealed by clients were related to painting. The satisfaction with project quality is positively related to the quality and contents of design documents including design drawings and specifications. Regulations and communication with clients are important issues to reduce the gaps between interior designers and clients/ consumers.

Utilization of Failure Examples in Detail Design for Oil and Petrochemical Plant Project (석유화학 플랜트 프로젝트 상세설계 실패사례활용방안에 대한 연구)

  • Kang, Tae-Young;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.2
    • /
    • pp.62-67
    • /
    • 2009
  • The capability of design and engineering of global EPC companies has long been equalized through past similar construction experiences. Among various key factors in the success of EPC project, the capability of engineering is considered to be the most important factor since the engineering is preceding activities of EPC contract. The failure of engineering may adversely affect the subsequent procurement & construction activities and in turn may cause cost overrun or schedule delay. Therefore, an EPC company needs to continue to improve the engineering capabilities for the success of project. The engineering capabilities can be further improved if the EPC company should prevent recurrence of similar design faults that were previously committed. This study is intended to present how to make the most of the failure examples from previous projects towards a success of project. Failure is but a stepping stone to success. The EPC company can obtain useful lessons from the analysis of past failure examples.

  • PDF

Field Application of Insulation Curing Method with Double Bubble Sheets Subject to Cold Weather (이중버블시트를 이용한 단열양생공법의 한중콘크리트 현장적용)

  • Hong, Seak-Min;Baek, Dae-Hyun;Kim, Jong;Jeon, Chung-Kun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.57-60
    • /
    • 2008
  • This study investigated the results of insulation heat curing method using double layer bubble sheet in slab concrete and mass concrete in cold weather environment. First of all, when double bubble sheets are applied, it was shown that slab concrete was protected from early freezing by remaining between 6 and 15℃ even in case outside temperature drops -9℃ below zero until the 2nd day from piling, and in the case of mass concrete, with the maximum temperature difference between the center and surface less than 4℃, crack occurrence index was close to 2 and no hydration heat crack occurred by internal constraint. The insulation heat preservation curing method using the double bubble sheet applied in this field prevented early freezing owing to stable curing temperature management, deterring concrete strength development delay at low temperature, and obtained the needed strength. Also, it was proven that the method is highly effective and economic for cold weather concrete quality maintenance through curing cost reduction like construction period shortening and labor cost reduction, etc by reducing the process of temporary equipment installation and disassembling.

  • PDF