Analysis of Setting Delay Performance Change of Super Retarding Agent According to the Change of Mixing Rate at 20℃ (20℃ 조건에서 초지연제 혼입율 변화에 따른 응결지연 성능 변화 분석)

  • Lim, Gun-Su;Han, Soo-Hwan;Hyun, Seung-Yong;Kim, Jong;Han, Min-Choel;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2020
  • This research is part of the research for unifying the mass concrete and utilizing the rate of super retarding agent. We analyzed the performance of super retarding agent 20℃ conditions. It was found that there was no deterioration in fluidity and air quality due to the change in the super retarding agent mixing rate. It was found that when super retarding agent was mixed up to 0.5 %, it was delayed for 22.3 hours at 20℃. Therefore in order to ensure the performance required at the site, the super retarding agent mixing rate must be determined by fully considering the situation at the site. In addition it will be analyzed that super retarding agent performance analysis at high temperature will be required in subsequent studies.

  • PDF

A Study on the Cause and Reduction of Cracks in the Wall Connecting the Underground Parking Lot and the Apartment (지하주차장과 아파트 연결 벽체의 균열 원인 분석 및 저감방안 연구)

  • Shim, Hak-Bo;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.161-162
    • /
    • 2020
  • Cracks are caused by drying shrinkage between the upper part of the underground parking lot and the apartment wall. As a result of the investigation, the distance between the apartment and the apartment is more than 45m, and the top slab of the underground parking lot is usually flat when there is not with steps. Therefore, the crack occurs more when the underground parking lot is a PC slab than a RC slab. In this study, the reduction of cracks was conducted by extending the slab, expanding the beam size, increasing the wall thickness, and installing a delay joint on slab. In each case, a finite element analysis was performed to examine the crack reduction method.

  • PDF

Setting Time Prediction of Super Retarding Concrete Using Improved Durometer (개량형 듀로미터를 이용한 초지연 콘크리트의 응결시간 분석)

  • Han, Soo-Hwan;Choi, Yoon-Ho;Yeun, Kyu-Won;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2020
  • In this study, the feasibility of the durometer into super retarding concrete was studied by comparing the penetration resistance with the hardness of each durometer using the penetration resistance and the improved Durometer and Durometer A-Type according to the ultra-delay mixture rate. The test results showed that initial setting time by improved Durometer and Durometer A-Type were fixed at 25, 50 HD, respectively, and the 35, 80 HD showed at final setting time. It was also found that the use of the durometer can be available to measure the setting time of the concrete.

  • PDF

Feasibility Analysis on the Application of Eco-friendly Prefabricated Rainwater Detention System in Grit Chamber and Permanent Pond by the Two-dimensional Diffusion-wave Analysis Model (2차원 확산파 해석모형을 통한 침사지겸 저류지의 친환경 조립식 빗물침투저류시설 적용 타당성 분석)

  • Kim, Ho-jin;Choi, Hee-Yong;Lee, Tae-Gyu;Choi, Hyeonggil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.185-186
    • /
    • 2022
  • In this study, a numerical analysis was conducted using a two-dimensional diffusion-wave analysis model to analyze the validity about the application of eco-friendly prefabricated rainwater detention system in grit chamber and permanent pond. As a result of the analysis, it is confirmed that the flood prevention effect, such as a decrease in peak flow rate and a delay in peak time, is excellent, so it is considered reasonable to apply eco-friendly prefabricated rainwater detention system in grit chamber and permanent pond.

  • PDF

A New Clock Routing Algorithm for High Performance ICs (고성능 집적회로 설계를 위한 새로운 클락 배선)

  • 유광기;정정화
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • 제36C권11호
    • /
    • pp.64-74
    • /
    • 1999
  • A new clock skew optimization for clock routing using link-edge insertion is proposed in this paper. It satisfies the given skew bound and prevent the total wire length from increasing. As the clock skew is the major constraint for high speed synchronous ICs, it must be minimized in order to obtain high performance. But clock skew minimization can increase total wire length, therefore clock routing is performed within the given skew bound which can not induce the malfunction. Clock routing under the specified skew bound can decrease total wire length Not only total wire length and delay time minimization algorithm using merging point relocation method but also clock skew reduction algorithm using link-edge insertion technique between two nodes whose delay difference is large is proposed. The proposed algorithm construct a new clock routing topology which is generalized graph model while previous methods uses only tree-structured routing topology. A new cost function is designed in order to select two nodes which constitute link-edge. Using this cost function, delay difference or clock skew is reduced by connecting two nodes whose delay difference is large and distance difference is short. Furthermore, routing topology construction and wire sizing algorithm is developed to reduce clock delay. The proposed algorithm is implemented in C programming language. From the experimental results, we can get the delay reduction under the given skew bound.

  • PDF

The Effect of Delayed Compaction on Unconfined Compressive Strength of Soil-Cement Mixtures (지연다짐이 Soil-Cement의 압축강도에 미치는 영향)

  • 정일웅;김문기;도덕현
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • 제28권4호
    • /
    • pp.66-76
    • /
    • 1986
  • This study was attempted to investigate the effects of delayed compaction on the unconfined compressive strengh and dry density of Soil-cement mixtures. Soil-cement construction is a time-consuming procedure. Time-delay is known as a detrimental factor to lower the quality of soil-cement layer. A laboratory test was performed using coarse and fine weathered granite soils. The soils were mixed with 7% cement at optimum moisture content and excess moisture content in part. Socondary additives such as lime, gypsum-plaster, flyash and sugar were tried to counteract the detri-mental effect of delayed compaction. The specimens were compacted by Harvard Miniature Compaction Apparatus at 0,1,2,4,6 hors after mixing. Two kinds of compactive efforts(9 kgf and 18 kgf tamper) were applied. The results were summarized as follows: 1.With the increase of time delay, the decrease rate of dry density of the specimen compacted by 9 kgf tamper was steeper than that of the specimen compacted by 18kgf tamper. In the same manner, soil-B had steeper decreasing rate of dry density than soil-A. 2.Based on the results of delayed compaction tests, the dry density and unconfined compressive sterngth were rapidly decreased in the early 2 hours delay, while those were slowly decreased during the time delay of 2 to 6 hours. 3.The dry density and unconfined compressive strength were increased by addition of 3% excess water to the optimum moisture content during the time delay of 2 to 6 hours. 4.Without time delay in compaction, the dry densities of soil-A were increased by adding secondary additives such as lime, gypsum-plaster, flyash and sugar, on the other hand, those of soil-B were decreased except for the case of sugar. 5.The use of secondary additives like lime, gypsum-plaster, flyash and sugar could reduce the decrease of unconfined compressive strength due to delayed compaction. Among them, lime was the most effective. 6.From the above mentioned results, several recommendations could be suggested in order to compensate for losses of unconfined compressive strenght and densit v due to delayed compaction. They are a) to use coarse-grained granite soil rather than fined-grained one, b) to add about 3% excess compaction moisture content, c) to increase compactive effort to a certain degree, and d) to use secondary additives like line gypsum-plaster, flyash, and sugar in proper quantity depending on the soil types.

  • PDF

The Fundamental Properties of Organic-Inorganic Hybrid Packaging Materials for Bike Paths using Industrial By-products (산업부산물을 이용한 유무기 복합 자전거 도로 포장재의 기초적 특성)

  • Oh, Dong-Uk;Lee, Gun-Cheol;Kim, Young-Geun;Cho, Chung-Ki;Kim, Na-Young
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • 제6권3호
    • /
    • pp.94-101
    • /
    • 2011
  • In this study, in order to develop organic-inorganic hybrid packaging materials(PM) of bike paths using blast furnace slag(BS) as industrial by-products, fundamental properties of organic-inorganic hybrid packaging materials were performed. Test result, the increase of Acryl emulsion polymer(AEP)/binder(B) ratios tends to delay the setting time, to increase the table flow, to decrease the strength by material segregation and to increase the length change. The optimal mix proportion of AEP decides on 40%(AEP/B) due to workability and high strength. The increase of BS replacement ratios also tends to delay the setting time, to separate AEP from B and to decrease the strength by material segregation. When BS replacement ratios were lower than 40%, they are satisfied with goal properties.

  • PDF

Study on the measurement of blasting vibration response in construction a subway station at East gate of cultural treasure (지하철건설에 따른 문화재 보호와 동대문역사시공 보고서(1))

  • Choi, Sang-Yol;Ree, Soo-Book;Huh, Ginn;Chai, Soo-Yun
    • Journal of the Korean Professional Engineers Association
    • /
    • 제17권3호
    • /
    • pp.32-49
    • /
    • 1984
  • The East gate station area is 205M long and 24m deep which is located 13 meter in front of cultural treasure east gate. The area to be excavated by blasting is composed of granite rocks from 10M depth to 25M. Surface earth extends to up 10M depth. This job site has in involves heavy traffic congestion such as over 10,000 cars passing in rush hour where clossing No 1 lint of subway running 3 minitues head way. This east gate station construction is to be executed for the provent of the setting down of underground level and blasting vibration effects to cultural treasure east gate. Therefore, the caltural treasure committee approved this execution subject to the following condition. 1. Subway gelogical foundation and measured natural frequency 2. Execution of water tight wall 3. Sellection and test of damping material for wall and under rail 4. Measurement of monitoring system during the execution 5. Measurement of histogram system The above two projects was carried out by Dr. Kwang team in KAIST and prof, Han in Hanyang University under accadamic study contract. In the blasting work, for the pourpose of reduced vibration and low explosion velocity such as CCR, Kovex slurry. The 2nd, used electrical caps shall be delay cap and M/S caps in multi delay. The 3rd, drilling pattern is bench cut in open cut and applied control blasting in tunnelling and also shall drill anti-vibration holes as line drilling.

  • PDF

User Costs Evaluation due to the Bridge Reconstruction Period (교량의 재가설 공사기간에 따른 사용자비용 평가)

  • Kim, Sang Hyo;Park, Se Jun;Lee, Dong Ho;Ahn, Jin Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • 제15권1호
    • /
    • pp.148-158
    • /
    • 2011
  • As critical infrastructure, bridges play an indispensable role in facilitating the distribution of goods. When bridges reach their end of useful life or get damaged by natural disasters such as earthquakes or storms, they have to be removed and reconstructed. When bridges in service need to be reconstructed, user costs occur from vehicle detours and traffic congestions, and social costs occur from noise and dust during construction periods. However, these user and social costs are not considered during reconstruction and the evaluation methods of those costs are vague. Thus, there is lack of appropriate bridge types that consider these costs. Therefore, this paper identifies the social overhead costs that occur during bridge reconstruction, which is also called, users' socioeconomic values. Next, it proposes a method to evaluate user costs during bridge reconstruction, and appraises the method. User costs are evaluated based on traffic information, social and material volumes including the bridge's daily traffic volume, peak hours, detour distance and time. In addition, time delay costs due to traffic operational costs and bridge reconstruction are also taken into consideration.

The algorithm design and the test bed construction method of processing for periodic delayed data (주기적 지연 데이터 처리를 위한 알고리즘 설계 및 테스트 베드 구축 방법)

  • Sang-hoon Koh;Ho-jin Song;Nam-ho Keum;Pil-joong Yoo;Se-kwon Oh;Young-sung Kim
    • Journal of Advanced Navigation Technology
    • /
    • 제27권1호
    • /
    • pp.102-110
    • /
    • 2023
  • The MATS(Missile Assembly Test Set) is manufactured and used to check the function of the missile during the period of development for the guided missile system, and the requirements for power and communication are managed for equipment production. The MATS developer implements software according to the proposed communication standard to guarantee the reliability of the data that communicates with the guided missile. The test bed is built and self-performance evaluation is performed after implementation. And the verification process is performed using the standard equipment. The characteristics of periodic delay for data transmission must be reflected when building a test bed. This paper describes a test bed construction method for data processing with periodic delay. Also This paper compares and evaluates the performance by changing the previously designed algorithm.