Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스 (GMP Calculation Process in CM at Risk for Public Construction Project)

  • 김건성;김정훈;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

Interrelationship Analysis between Causal Factors of Construction Defect Using Association Rule Mining

  • Lee, Sang-Deok;Han, Sang-Won;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.627-628
    • /
    • 2015
  • Construction defect which can causes economic damage such as schedule delay, cost overrun is a considerably important factor in construction industry. In general, a construction defect features a difficulty to find out causes precisely because it occurs when several interrelated causes combine. Yet, studies have tried to understand the interrelationships between factors are limited. In addition, despite of a tremendous amount of construction data, it's not still enough to analyze them, but tends to depend on experience or know-how of practitioners. Thus, it is necessary to identify underlying causes in influential factors by utilizing related data. This paper analyses Interrelationships between causal factors using Association Rule Mining to discover root causes of construction defects. Confidence and Lift that can be used for presenting the interrelationships of the causes were extracted from 1241 cases in 30 projects in Korea. It is expected that this paper allows the construction managers to discover key factors and make right decisions to reduce occurrence of construction defects. Furthermore, analysis of interrelationships can improve understanding of structural patterns of construction defects.

  • PDF

설문조사를 통한 장수명주택의 경량벽체 시공성 사후평가 (Post Evaluation on the Constructibility of the Lightweight Wall in Long Life Housing through Interview Survey)

  • 이학주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.188-189
    • /
    • 2014
  • Recently, structural system of apartment building is changing from wall type to column type to accommodate various life styles of residents in Korea. Reinforced-concrete bearing wall structures have been mainly used in apartment construction since 1980's. It is impossible to remove the bearing wall in case of remodeling a house, so that the lightweight wall is needed to apply to the column type structure of the Long Life Housing. Therefore, the purpose of this study is to evaluate the construction performance of the wall. Constructibility reviews are performed throughout interview survey from builders who charge with managing the construction of the lightweight wall in field. This paper present that constructor prefer the bearing wall rather than the lightweight wall because of the schedule delay, difficulty of management, and lack of skilled labor. The results indicate what we should improve on the lightweight wall from now on.

  • PDF

Rod Type Mold를 이용한 비정형 콘크리트 부재 생산기술 (Manufacturing Technology of Freeform Concrete Segments using Rod Type Mold)

  • 김경주;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.64-65
    • /
    • 2014
  • Recently freeform buildings which are free from simple shape are implemented depending on improvement of construction method. However, freeform buildings are spent more time and cost to materialize than typical form. Because molds for production of freeform shape cannot be reused. For these reasons, low productivity, delay of construction schedule and budget overflow are occurred. Thus, technology of molds need to be developed for manufacturing of freeform concrete segments. The objective of this study is manufacturing of freeform concrete segments using rod type mold. This technology can implement not only application to various shape but also mass production. Thus, problems of construction period, productivity and cost can be solved. After this study, productivity analysis should be continued through the field application.

  • PDF

프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토 (BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service.)

  • 이창희;이정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF

표면처리공법을 활용한 마감 패널 개발 (Development of Finishing Panel using Surface Treatment Method)

  • 김강민;윤섭;권해원;공민호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.57-58
    • /
    • 2019
  • Precast concrete finishing panels can be implemented in different colors, textures and designs relatively freely by different designers in different finishing materials. Therefore, we tried to develop a PC finishing panel that can be applied in the field by using various color pigment and concrete surface retardation method and polishing method.

  • PDF

서중환경 시 합성수지 거푸집 적용 콘크리트 수화열 특성 (Hydration Heat Characteristics of Concrete with Synthetic Resin Form in Hot Weather Circumstance)

  • 남경용;김성덕;최석;유정일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.129-130
    • /
    • 2020
  • This paper attempted to examine the characteristics of heat of hydration and calorific value of concrete according to the formwork material in Hot weather environment. As a result of the experiment, it was found that there were no problems such as temperature cracking and delay in hydration reaction when a synthetic resin form was used.

  • PDF