• Title/Summary/Keyword: Construction Temporary Work

Search Result 130, Processing Time 0.027 seconds

A Study on the Environmental Improvement in the Interior Construction Fields with the check-list (실내건축의 작업환경 개선을 위한 기본적 관리방안에 관한 연구)

  • 이용의
    • Korean Institute of Interior Design Journal
    • /
    • no.9
    • /
    • pp.10-17
    • /
    • 1996
  • With the ever-increasing important of high-speed information in society as we move towards the 21 st century. Interior design and it's working condition has been changed a great deal included a sort of each special character and make a difference against the others. It used to be find a great poles asunder of worker's safety and project quality according to the environmental dimension of interior construction field as if they should be a pleasantness or poor condition. This research aimed to improvement of environmental construction field of interior with construction engineers and particular interior labors in 4 phases as : ⅠThe preparatory phase : -Secure a Budget, Environmental safety supervisor -Fix of Design quality, Construction period. -Choice of Construction method, Sub constructing Ⅱ. Starting work phase ; -Capacity , Safety of temporary power line. -Carriage, Stock of Material -Safety of Electronic tools, -Personal protector. Ⅲ. Working period ; -Ventilation, I illumination of working place. -Measurement of environmental working condition Ⅳ.Finish working phase ; -Analysis of measurement data. -Evaluation and making up for the weak point. -Keeping data.

  • PDF

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Basic study for development of bottom-up infill module for high rise building (고층 건축물을 위한 bottom-up Infill module 개발 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.164-165
    • /
    • 2015
  • Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.

  • PDF

Analysis of Design Wind Load Level for System Supports Considering Local Basic Wind Velocity and Construction Period (지역별 기본풍속과 공사기간을 반영한 시스템 동바리 설계 풍하중 분석)

  • Lee, Sun-Woo;Won, Jeong-Hun;Mha, Ho-Seong
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • This study evaluated wind loads considering a local basic wind velocity and construction periods to define the level of applied wind loads for system supports. Structural responses of system supports were examined and compared to those of system supports with the level of wind loads following various standards and specifications for permanent and temporary structures. And, the maximum combined stress ratios were estimated to evaluate the structural safety of a considered system support. From results, it was found that the wind load level should be applied in accordance with construction periods when estimating the safety of system supports. Looking into the response by change of the basic wind velocity according to local regions, it is no need to consider wind loads in regions with the basic wind velocity of 30 m/s. However, it was analyzed that wind loads should be considered in the regions with the basic wind velocity of 40 m/s or above. In addition, wind loads should be considered in designing system supports located at the region with the basic wind velocity of 35 m/s starting from construction period of 1.5 years. The standard specification for temporary work was analyzed as an incorrect standard in evaluating wind loads, since it underestimated the response of system supports in accordance with the local basic wind velocity and construction periods.

Basic study about Geometric feasibility Analysis of the System form for the Bridge Slab (교량 상판 콘크리트 타설용 거푸집 시스템의 기하학적 타당성 분석의 기초연구)

  • Sung, Soojin;Lim, Jeeyoung;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.197-198
    • /
    • 2014
  • The concrete work of bridge decks is performed in a high place, which may reduce safety and productivity. In addition, the conventional method for deck forms require a great deal of manpower, and a form (sheathing) board is damaged when removed after curing. As a result, the concrete deck work of bridge construction becomes the cause of delayed construction and increased cost. To solve these problems, SMART form, a system form, is developed. SMART form is a temporary device for easier installation and removal, by mounting it to the lower flange of a bridge girder and using a mechanical behavior of the form system for deck concrete pouring. For stable installation and removal of the developed SMART form, geometric behaviors should be analyzed to prove its validity. Furthermore, the validity of geometric behaviors when the SMART form size is altered in response to the various arrangement of bridge girders should be proved. Thus, the study is intended to analyze the geometric validity of the form system for bridge deck concrete pouring. The structural stability of the form system for bridge deck concrete pouring can be secured, which will be applied in the field.

  • PDF

Technique for Bridge Bearing Retrofit Using Wedge-Jack (교좌장치 겸용 웨지잭을 이용한 교좌장치 보수공법)

  • 백동명;유문식;임진석
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.837-843
    • /
    • 1999
  • A common hydraulic jack using brdige retrofit has a problem of increasing cost and time of construction to construct additionally temporary bent or concrete bracket, in case of insufficiency work space and release hydraulic pressure. To solve the problem, this technique is developed to alternate the bridge bearing in adequate inspection condition. After control maximum lift-height and minimum lift-force of no damage to super structure, the constructive technique is to alternate and repair the bridge bearing using the wedge jack with bridge bearing ability that is no release hydraulic pressure stopper, and able to reuse separable cylinder.

  • PDF

Association of Lifestyle and Stress on Hypertension Among Temporary Employee, Working in Small and Medium Sized Construction Company (일부 중소형 건설업 임시직 근로자의 고혈압 유병실태와 생활습관 및 스트레스와의 관련성)

  • Kim, Soo-Yeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.7
    • /
    • pp.363-371
    • /
    • 2019
  • The purpose of this research is to provide data for the relations between lifestyle, stress and hypertension in a group of construction Temporary employee. The methods taken in this study was to survey the general characteristics and stress in the group, and figure out the relations between lifestyle and hypertension. This study targeted at 301 Temporary employee. in Young-dong for six months (2014~2015). Data analysis used errors and percentages, chi-square tests, one-way ANOVA analysis, independent sample t-test, chi-square test and multivariate logistic regression. The study shows that no relations between age and hypertension, but according to job characteristics, aggravate lifestyle just like smoking(P=0.049), eating habit(P=0.012), physical(p=0.022) & psychological(p=0.011) state there is an effect on hypertension. Based on the results of this study, it is found that temporary workers in small and medium-sized construction companies with high work-related disaster rates need to improve their living habits and physical psychological conditions and manage high blood pressure, as well as research and management of chronic diseases such as obesity, diabetes and dyslipidemia.

An Analysis of Planning Practice for Reinforced Concrete Core-Wall Construction in High-Rise Building Construction (초고층건물 R/C조 코어월 선행공사의 시공계획 실무에 관한 분석)

  • Ahn Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.194-201
    • /
    • 2004
  • Core-wall construction method is applied in many high-rise building constructions. This is caused by the advantages of the method such as the effect of saved construction cost and shortened period. However, the analysis study of planning practice for core-wall construction shows matters take place during core-wall construction, such as increasing in construction cost and period. These matters result from the limited work space leading to low productivity, the activity interference leading to increasing in period, additional temporary work cost and time, and delayed concrete pour activity. A large part of these can be prevented taking place by very detailed and most careful core-wall construction plan. Therefore, this study suggests improvement directions of core-wall construction planning process focused on the cooperation system of a contractor between a sub-contractor and the process.

A Study on the Present Conditions and prevention of Accident Occurred in the Construction Field (건설현장에서 발생되는 재해의 유형별 분석에 관한 연구)

  • Kang, Byoung-Su
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.7 no.3
    • /
    • pp.241-248
    • /
    • 2004
  • The purpose of the this paper is to consider the many dangerous factors involved in the use of temporary equipments in construction work and to reduce potential numerous fatalities by presenting suitable countermeasures. As a result of this study, the following conclusions and recommendations have been suggested. 1 Measures for safety sanitation must be strengthened in the field of machinery installation and engineering method. 2 The synthetic safety sanitation and safety control should be positively propelled. 3 An efficient safety training and education must be emphasized by the scientifical and systematical devices 4 A powerful precautionary countermeasure against health impediment should be conducted substantially 5. Miscellenous actions should be taken as follow. - Awaken enterprisers to the importance of their responsibility - Continuously conducting safety check.

  • PDF

Accidents Analysis and Research on Risk of the Actual Conditions in Roof Works (건설업 지붕작업의 재해분석 및 실태조사)

  • Choi, Don-Hoeng;Choi, Jin-Woo;Shin, Woon-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.111-116
    • /
    • 2012
  • This study analyzed the accidents and researched on risk of the actual condition in roof works. This study revealed that 68% of accidents in roof works occurred on small sized construction sites. And 79% of accidents are caused by fall. It is simply because most laborers do not wear the safety harness and the mounted equipment is not properly installed. According to our research, we realize that most of roof works have some risk of the fall accidents. Most of roof working sites have the danger of falling at ladder and temporary walkway. In oder to prevent accidents in roof works, the basic rule such as wearing the safety harness must be followed.