쌍줄비계 작업발판 안전기준에 따른 사용 실태조사 (Survey on Work Platform on Double Scaffold by Safety Standards)

  • 최돈흥;최진우;고성석
    • 한국안전학회지
    • /
    • 제26권3호
    • /
    • pp.47-51
    • /
    • 2011
  • Work platform is temporary material that many workers use in construction field, but many workers construct and use the work platform without considering safety standards, workers who have not the knowledge of safety standards construct the work platform in weakness and use the work platform in unstable, According to the statistics in 2009, 1230 people were injured at the work platform. Among them, victims by falling account for about 77% and mostly lead to fatal injuries. we have studied and survey about the safety or danger of the work platform(set limits to duble scaffold) in construction field and about how many workers observe safety standards of the work platform. According to the result of this survey, 24%~100%(average : 68%) of the work platform in survey is not observe the safety standards.

거푸집 자동화 설계를 위한 3차원 기반 소프트웨어 개발에 관한 연구 (A Study on the Development of 3D Software for Automated Formwork Design)

  • 이보경;이태훈;김진성;이동은;최형길
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.112-113
    • /
    • 2019
  • In this study, development of 3D software for automated formwork design was conducted to achieve optimization and reduction of labor for temporary work. Through the literature review, the current technical level was identified and the required functions of 3D software for automated formwork design were derived. The 3D software should be developed with the aim of automating 3D design, improving construction quality and utilizing the Internet of Things. As a preliminary step to develop 3D software, the prototype demo version was developed to implement 3D design automation function, which confirm the possibility of 3D software development.

  • PDF

공동주택용 외단열 적층시공 공법 개발을 위한 기초연구 (A Preliminary Study to Develop the Construction Method for Working Exterior Simultaneously with Vertical Structural Work)

  • ;김태훈;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2014
  • A construction method allowing exterior insulation working to be carried out simultaneously with vertical structural work through modification of the temporary vertical system form could be a breakthrough to invigorate exterior insulation construction in high-rise apartments. Therefore, the purpose of this study, as a preliminary study for developing such a method, was to derive significant engineering characteristics (E.C) using QFD which can reflect the users' need for E.C. Based on this result, a construction method will be developed in further research.

  • PDF

지반굴착공사에서의 위험요인 선정과 안전관리방안 연구 (Risk Factor Selaction and Safety Management Plan in the Underground Excavation Construction)

  • 원유진;강경식
    • 대한안전경영과학회지
    • /
    • 제21권4호
    • /
    • pp.31-37
    • /
    • 2019
  • When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

비계공사 안전기준 개정에 따른 현장적용 실태에 관한 연구 (A Study on the Actual Condition of Scaffolding Construction in Accordance with the Revision of Safety Standards)

  • 김자연;조윤희
    • 한국안전학회지
    • /
    • 제35권4호
    • /
    • pp.15-22
    • /
    • 2020
  • Scaffolding works are demolished after this structure is completed, and safety accidents often occur because they are installed differently from legal standards or frequently change during work. Therefore, in order to strengthen the safety of scaffolding, the Ministry of Land, Infrastructure and Transport required a need for design standards for temporary facilities that can systematically prevent and solve large-scale safety accidents that are repeatedly increasing during temporary construction. It has been enacted, and some contents have been revised for the past three years. However, construction site personnel do not know or know the revised matters, but often install scaffolding by the installer's experience rather than complying with relevant laws and regulations. It is the situation that the ground strength test of the foundation ground for the load applied to the floor of the column is omitted in most sites. Therefore, this study grasped the actual situation on the degree of recognition of the revised laws and regulations of the construction site and the foundation-based treatment of the floor working load of the scaffolding column, and derived problems. In addition, we intend to provide reference materials for the endurance test according to the ground conditions to small-scale small sites where it is difficult to conduct the test by carrying out the endurance test of the scaffolding ground according to the revised standards.

임시전력 건설현장에 사용되는 전기설비의 감전위험에 관한 현장실태 조사 및 분석 (The Investigation and Analysis of Field Condition on the Electrical Shock Hazard of Electrical Facilities Used for Temporary Power Supply at Construction Site)

  • 길형준;이복희
    • 조명전기설비학회논문지
    • /
    • 제18권6호
    • /
    • pp.197-204
    • /
    • 2004
  • 건설현장에서 공사기간 중 일시적인 전원공급을 위하여 사용되는 임시전력설비는 영구설비와 달리 최소한의 보호장치만을 구비하여 운용되는 설비로서, 산만한 작업환경, 전기설비의 재사용으로 인한 노후화 등의 불안요인에 의해 타설비에 비해 많은 감전위해요인을 나타내고 있다. 이에 임시전력설비의 감전위험요소를 분석하기 위해 수전 설비, 배ㆍ분전반 등에 대한 실태조사 및 설문조사가 병행하여 실시되었으며 관련 전문가, 연구원, 한국전기안전공사 기술자 등에 의해 전국적으로 실시되었다. 그 대상은 공항, 아파트, 시립운동장 등 다양하였다. 실태조사의 분석 결과 자물쇠장치의 불량, 충전부 방호의 미흡 등 문제점이 나타났으며 이를 해소하기 위해서는 관련 제도개선 안전교육, 안전점검 등이 이루어져야 한다. 향후 분석 자료는 건설현장에서의 감전사고를 방지하는데 활용될 수 있으며 전기설비를 안정화시키는데 이용될 수 있을 것이다.

국내 소규모 건설현장의 전기설비 및 작업환경 분석 (Analysis of Electrical Equipment and Work Environment for Domestic Small-Scale Construction Site)

  • 김두현;황동규;김성철;강신욱;최상원
    • 한국안전학회지
    • /
    • 제29권4호
    • /
    • pp.42-47
    • /
    • 2014
  • This paper is aimed to investigate and analyze of characteristic for electrical equipment and work environment for the small-scale site. In order to investigate and analyze electrical equipment and work environment for preventing electric shock disaster in construction sites, 50 small-scale construction sites and 12 large-scale construction sites are selected. This paper completed site investigations of low-voltage equipment and the portable electric machine and equipment in 12 large-scale construction sites and 50 small-scale construction sites. The findings were about the electric shock environment relevant to the ground-relevant equipment, the panel board, the protection tools, the sockets, the temporary wiring system, the portable and movable electric machines and equipments in small-scale construction sites. Finally, this study analyzed the domestic and foreign relevant standards and regulations and these findings can be utilized as educational data warning electric shock risk caused by electric equipment in small-scale construction site.

국내외 표준 시방서의 거푸집 및 동바리 시공.해체 관련 규정의 비교 (Comparison of Prescription Regarding Form Work in Standard Specifications among Domestic and Foreign Countries)

  • 전규남;최성용;노상균;백대현;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.195-198
    • /
    • 2009
  • In this paper, regulation for form work in standard specification among Korea and foreign countries are studied and compared. Within the scope of this paper, regulation regarding fabrication of form and form removal are mainly focused on. Standard specification prescribed by construction temporary equipment association provides detailed regulations and well arranged. ACI 347-04, CEB-FIP and BS EN 13670 had different style and scope compared to domestic specification. Especially, regulation for form removal in ACI prescribed in terms of minimum period.

  • PDF

건설현장 작업발판 및 안전통로 관련 추락 및 전도재해 사고사례 분석 (Falling Accident Case Analysis on Construction Working Platform and Working Passage)

  • 김현수;이용수;오인환;안홍섭
    • 한국건설안전학회 논문집
    • /
    • 제2권1호
    • /
    • pp.9-15
    • /
    • 2019
  • 건설산업에서의 안전 수준 향상 노력에도 불구하고, 건설산업은 타 산업에 비해 높은 사망자수를 보이고 있다. 이러한 높은 사고율은 건설산업의 안전관리 측면에서 효과적인 대책이 필요함을 명확히 의미한다. 기존의 연구에서 주장하듯, 사고의 발생 가능성이 높은 공종이나 기인물을 파악하고 이에 적합한 안전대책을 세우는 것이 중요하다. 다수의 추락관련 건설재해가 작업발판 및 안전통로에서 발생한다는 점을 고려해보면, 안전관리 측면에서 가시설물을 중점적으로 다루어야 할 것이다. 이를 위해 본 연구에서는, 작업발판 및 안전통로와 관련된 6개년 1663개의 사망사고를 공사규모, 공정률, 공종, 직종에 의해 분류하고, 각 사망재해가 발생한 사례들을 분석함으로써 보다 중점적으로 관리되어야할 요소를 추출하였다.

내풍케이블 배치에 따른 가설 중 사장교의 공기역학적 거동 비교 (Comparison of Aerodynamic Responses for Cable-Stayed Bridges during Construction with Temporary Stabilizing Measures)

  • 조재영;김영민;이학은
    • 한국강구조학회 논문집
    • /
    • 제19권2호
    • /
    • pp.147-160
    • /
    • 2007
  • 사장교 가설 시 태풍에도 내풍안정성을 확보할 수 있도록 내풍케이블 가설공법에 대한 심도 있는 실험을 수행하였다. 주경간이 각각 475m, 230m인 강합성 사장교에 대하여 가설단계별로 내풍케이블의 배치를 다양하게 적용하여 동적 풍하중이 가설 중 사장교에 미치는 영향을 전교모형실험을 통해 검토하였으며 이를 위해 풍속 별로 캔틸레버 단부의 정적 및 동적 변위, 주탑상부의 가속도 그리고 주탑 하단부의 교축방향 휨모멘트를 산정하였다. 연구 결과 캔틸레버 당 두 세트의 수직 내풍케이블이 가장 효과적인 제진대책임을 알 수 있었다. 캔틸레버 한 쪽 길이가 약 105m인 경우 한 세트의 수직 내풍케이블도 상당한 제진효과를 발휘하였으며 캔틸레버 길이가 200m 이상의 경우 수직케이블과 우물통 경사케이블이 조합된 경우와 캔틸레버 당 두 세트의 경사 내풍케이블도 좋은 제진방안으로 판단된다. 우물통 상단에 연결되는 경사케이블은 캔틸레버 단부 부근에 설치된 경우에만 어느 정도 제진효과가 나타났다.