건설분야 전천후 공법 적용방안 (A Method of All-Weather Construction Application in Construction Sites)

  • 이한우;이병수;방창준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.193-194
    • /
    • 2012
  • Construction work is affected by the weather; e.g. snowfall, rainfall and low-high ambient temperature, especially at a site in a severe climate. The influence of the weather is one of the possible reasons for delays in a construction schedule and quality deterioration. To protect the worksite from severe weather conditions, the temporary roof and wall could be installed on the outside of main structures designed in advance and the temporary structures could be took down after a period use. The greater coverage all-weather construction method is applied, the larger the effect. so, it is important and needs that the temporary roof and wall can be widely applied, designed to effectively about structure and layout.

  • PDF

설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 - (Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects -)

  • 이진웅;김태훈;조규만
    • 대한건축학회연합논문집
    • /
    • 제20권6호
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

BIM기반 가설공사 업무지원시스템 개발에 관한 연구 (A Study on Development of BIM-based Engineering Management System for Temporary Work)

  • 최창훈;한충희;이준복
    • 한국건설관리학회논문집
    • /
    • 제21권1호
    • /
    • pp.61-69
    • /
    • 2020
  • 건설 프로젝트d의 대형화, 복잡화, 다양화로 인해 건설공사에서 발생되는 정보의 양이 기하급수적으로 증가하고 있다. 이에 설계 및 시공 검토가 현장 성공 여부에 치명적인 영향을 미치고 있다는 사실을 인지하고, 이를 위한 다양한 노력들이 학계와 산업에서 활발하게 이뤄져 왔다. 설계, 계획 및 유지관리 등 건설 전 단계에서 BIM의 활용은 늘어나고 있는 추세이고, 현재 건설 산업에서 사용되는 표준 중의 하나로 받아들여지고 있다. 하지만 가시설물을 위한 전문화된 소프트웨어가 없을 뿐만 아니라 전문적인 기술자가 절대적으로 부족하여 BIM기반 가설공사 설계는 2D 설계를 완료한 후 3D로 형상화하여 보조수단으로 활용된다. 이에 본 연구에서는 BIM기반 가시설물 설계 및 물량산출, 현장점검 업무의 인간적인 실수(Human error)를 최소화하고 업무시간을 단축할 수 있도록 하여 업무 효율을 높일 수 있는 BIM기반 업무지원시스템을 개발하고자 한다.

건축건설공사의 재해분석에 관한 연구 (A Study on the Accident Analysis of Architectural Work)

  • 김정민;이종빈;장성록
    • 한국안전학회지
    • /
    • 제31권3호
    • /
    • pp.96-101
    • /
    • 2016
  • Previous literature has been investigated various aspects of accident occurrence and prevention in construction field. However, those studied were limited in that they only focused on the death accident without considering the loss time accident. Based on this, the goal of current study was to investigate the nature of the loss time accident, and compare the results with the death accident. Results showed that 1) the occurrence rate of death accident was significantly higher in the form work, temporary work, and steel frame work; 2) the temporary work showed significantly higher occurrence rate of the loss time accident and the death accident as compared to others; 3) ratio of the loss time accident to the death accident in domestic construction field was 50:1; 4) fall accident showed biggest occurrence rate in both the loss time accident and the death accident; and 5) more that 80% of workers in both the loss time accident and the death accident was between 41 and 65 years old.

극한지 모듈러 건축물의 설계, 시공 및 거주환경에 대한 연구 (A Study of Modular Architecture's Design to Dwelling Environment in Antarctica)

  • 이원학;송영학;임석호
    • 한국주거학회논문집
    • /
    • 제25권2호
    • /
    • pp.11-18
    • /
    • 2014
  • This study looked at designing, building and operating temporary camp, the first structures that South Korea built in the Antarctica. While there may be differences in accordance with the topography, ground surfaces in the Antarctica are covered broken stones, glaciers and snow. Hence, such topographical characteristics should be taken into account when conducting any construction work. To ensure successful assembly construction in the Antarctica using modules, prior trial assembly work should be done in Korea to identify any possible trouble in the actual construction process. Assuming that the workers will have to spend at least one winter in the temporary camp, the work will be more severely affected by adverse weather conditions and snow drift, resulting in the need to clear snow. This can be by designing roofs with curved surfaces. Also, quantitative effects will need to be verified through simulation and actual measurement. It will also be necessary to assess the camp's thermal environment and examine its air-conditioning methods. To identify the temporary camp's thermal system, the temperatures and humidities were measured, and the heating system was designed not to offer automatic control or desired value selection functions.

건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안 (Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction)

  • 김태훈;조규만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

중소규모 건설현장 재해원인 분석 및 제도적 개선방안 (Accident Prevention and System Improvement Strategies for small and medium-sized construction sites)

  • 이규진
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.59-64
    • /
    • 2009
  • This study is to analyse the causes of accident in small and medium-sized construction sites and to provide prevention strategies and system improvement guidance. Although occupational safety and health act regulates the standards and installations of temporary structures, about an half of construction accidents were caused by poor temporary structures such as guardrails, scaffolds, work platforms, etc. It investigated 51 construction sites which is located in metropolitan area by asking a series of questions including their knowledge about regulations and opinions about prevention strategies. The result shows that many of the respondents do not have sufficient understandings about the regulations, and it implies that education and training must be reinforced in order to enhance the safety-awareness and to develop the comprehension of regulations.

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석 (Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work)

  • 방종대;손정락
    • 토지주택연구
    • /
    • 제8권3호
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 - (Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support -)

  • 장지영;이지연;김하윤;이준호;김준상;김정렬;김영석
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.43-55
    • /
    • 2022
  • 조립 가설기자재는 본 공사가 시작되기 전 반드시 수행되는 가설공사에 널리 사용되기 때문에, 조립 시 품질확보와 설치 후 운영 시 조립 가설기자재로 인해 발생 가능한 안전사고 예방이 필수적이다. 그러나 현재 대부분의 건설현장 관리자는 조립 가설기자재의 품질관리를 본 공사를 위해 설치 후 해체하는 임시구조물을 관리하는 업무로 인식하고 있는 등 그 중요성을 인지하지 못하고 있는 것으로 조사되었다. 현재 건설현장에서의 조립 가설기자재의 품질관리 업무는 정형화된 절차가 부재하고 이를 수행하는 주체가 불분명하여 건설현장별로 상이한 업무방식에 의해 수행되고 있으며, 설치작업 시 종합건설업체 관리자는 임의의 판단에 의해 점검이 필요한 부분에 대해서만 점검하고 이에 대한 조치사항을 증거자료 없이 전달 및 반영하기 때문에 투명성이 보장되지 못하여 그 결과가 중대재해로 이어지는 문제가 발생하고 있어 이에 대한 개선이 시급한 것으로 분석되었다. 따라서 본 연구에서는 건설현장 내 이해관계자가 조립 가설기자재의 품질확보를 위한 체계적인 품질평가 및 관리 절차를 제공하고, 품질평가 및 관리 업무를 위한 체크리스트를 개발하여 이에 대해 웹(Web)상에서 이력관리를 지원하는 문서 작성 중심의 시스템을 구축하는 데 목적이 있다.