• Title/Summary/Keyword: Construction Temporary Work

Search Result 130, Processing Time 0.026 seconds

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Field Installation Test of the Circular Steel Cofferdam Using Suction Pressure (석션압을 이용한 원형강관 가물막이 현장설치 실험)

  • Kim, Jae-Hyun;Xin, Zhen-Hua;Lee, Ju-Hyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.10
    • /
    • pp.5-19
    • /
    • 2020
  • With increasing demand for offshore structures, the demand for temporary structures to help the offshore construction work has increased. A cofferdam is a temporary barrier to stop the inflow of water in the construction site and allows working in the dry condition when the construction is done within the water. However, it is a major cause of construction delays and increased costs because additional works are required to block the water inflow. Recently, in order to overcome the limitations of the conventional cofferdam methods and to increase economic efficiency, a large-diameter steel cofferdam method has been proposed which can be installed quickly in the seabed by using the suction pressure. In this circular steel cofferdam method, the top side of the cofferdam including the top-lid is always exposed above the sea level in order to use it as a water barrier, unlike the conventional suction bucket foundation. After installation, the top-lid of the cofferdam is removed and the water filled inside the cofferdam is discharged to make the interior dry condition. In this study, the circular steel cofferdam with a 5 m inner diameter was fabricated and the installation tests were conducted at the Saemaguem test site. During the experiment, variation of suction pressure, leakage between connections, structure deformation, and inclination of the steel cofferdam were measured and post-analyzed. This study verified the new circular steel cofferdam method and confirmed that the suction installation method can be successfully used for various purposes on offshore structures.

A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations (재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구)

  • 손기상;정경운
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.

  • PDF

A Study on the Risk Factors at the Broadcasting Production Site (방송 제작 특성에 기반한 유해위험요인 분석)

  • Nam, Yun Kyung;Jin, Sangeun;Lee, Jong-Bin;Kim, Kyungwoo;Na, Minoh
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.67-75
    • /
    • 2020
  • Due to various industrial accident that occur to the staff in the broadcasting production sites, the issue of safety at the broadcast production site is becoming a social issue. Nevertheless, not many researches have been carried out on the actual conditions of the staff's production environment and its safety issues. Therefore, the purpose of this study was to prepare a countermeasure based on engineering knowledge by analyzing working environment to improve the poor working environment of staff. First, this study analyzed statistical data of industrial accidents over the past five years to find out the current status of disasters at broadcasting production sites. As a result, the intensity of the accident was not weak in that the loss days was more than one month in 85% of accident. In addition, the type of accident was high in the fall/trip accidents. Second, this study visited 10 broadcasting production sites for risk assessment. By analyzing the characteristics of the working environment and 104 questionnaires, we predicted the types of accidents that can occur in the broadcasting production site. As a result, accident types such as fall, collision, and trip were relatively high, similar to the characteristics of construction site. Third, it was possible to quantify the scale of the risk in the broadcasting production, and as a result, the quantity of temporary structure and accident risk were proportional. In other words, this study analyzes broadcasting work environment and defines risk factors based on safety engineering knowledge. Finally, this study suggested a guideline to improve the safety of the broadcasting production site.

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

Flexural performance of composite walls under out-of-plane loads

  • Sabouri-Ghomi, Saeid;Nasri, Arman;Jahani, Younes;Bhowmick, Anjan K.
    • Steel and Composite Structures
    • /
    • v.34 no.4
    • /
    • pp.525-545
    • /
    • 2020
  • This paper presents a new structural system to use as retaining walls. In civil works, there is a general trend to use traditional reinforced concrete (RC) retaining walls to resist soil pressure. Despite their good resistance, RC retaining walls have some disadvantages such as need for huge temporary formworks, high dense reinforcing, low construction speed, etc. In the present work, a composite wall with only one steel plate (steel-concrete) is proposed to address the disadvantages of the RC walls. In the proposed system, steel plate is utilized not only as tensile reinforcement but also as a permanent formwork for the concrete. In order to evaluate the efficiency of the proposed SC composite system, an experimental program that includes nine SC composite wall specimens is developed. In this experimental study, the effects of different parameters such as distance between shear connectors, length of shear connectors, concrete ultimate strength, use of compressive steel plate and compressive steel reinforcement are investigated. In addition, a 3D finite element (FE) model for SC composite walls is proposed using the finite element program ABAQUS and load-displacement curves from FE analyses were compared against results obtained from physical testing. In all cases, the proposed FE model is reasonably accurate to predict the behavior of SC composite walls under out-of-plane loads. Results from experimental work and numerical study show that the SC composite wall system has high strength and ductile behavior under flexural loads. Furthermore, the design equations based on ACI code for calculating out-ofplate flexural and shear strength of SC composite walls are presented and compared to experimental database.

A Study on the Development of New SRC Lining Board (신형 SRC 복공판의 개발에 관한 연구)

  • Kown Beom-Jun;Park Do-Uk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.172-180
    • /
    • 2005
  • The purpose of this study is to suggest a new SRC(Steel Ready mixed Concrete) lining board. The research method of this study includes problem analysis of existing lining boards a constant load test and a fatigue test. The results of this study are as follow : 1) the suggested new lining board improves the function and reduce slipperiness than existing lining boards. 2) the strength of the new SRC lining board is analyzed as superior than existing lining boards from the results of constant load test and fatigue test.

Scheduling Technique for Remodeling Project of Inhabited Condition (재실 리모델링 특성을 반영한 공정계획 기법)

  • Paik, Hwa-Sook;Nam, Wook-Jin;Kim, Sung-Han;Kim, Hyung-Jin;Choi, Jong-Soo;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • This paper presents a scheduling technique that reflects various constraints in remodeling project of inhabited condition. The remodeling project of inhabited condition is required more detailed planning and control due to claims by noise, vibration, dust, smells, limited lift capacity, and limited temporary stock area. Because of the constraints, complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety and environment accidents. Especially, in case of inhabited condition, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints in remodeling of inhabited condition. This scheduling technique considers not only remodeling process but also dismantling, newly-construction, and residents movement. Process expression method using MS-Project also presented to keep connectivity with existing scheduling system.

Evaluating the pull-out load capacity of steel bolt using Schmidt hammer and ultrasonic pulse velocity test

  • Saleem, Muhammad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.5
    • /
    • pp.601-609
    • /
    • 2018
  • Steel bolts are used in the construction industry for a large variety of applications that range from fixing permanent installations to temporary fixtures. In the past much research has been focused on developing destructive testing techniques to estimate their pull-out load carrying capacity with very little attention to develop non-destructive techniques. In this regards the presented research work details the combined use of ultrasonic pulse velocity and Schmidt hammer tests to identify anchor bolts with faculty installation and to estimate their pull-out strength by relating it to the Schmidt hammer rebound value. From experimentation, it was observed that the load capacity of bolt depends on its embedment length, diameter, bond quality/concrete strength and alignment. Ultrasonic pulse velocity test is used to judge the quality of bond of embedded anchor bolt by relating the increase in ultrasonic pulse transit time to the presence of internal pours and cracks in the vicinity of steel bolt and the surrounding concrete. This information combined with the Schmidt hammer rebound number, R, can be used to accurately identify defective bolts which resulted in lower pull-out strength. 12 mm diameter bolts with embedment length of 70 mm and 50 mm were investigated using constant strength concrete. Pull-out load capacity versus the Schmidt hammer rebound number for each embedment length is presented.

Physical Characteristics Study through Renovation Type Analysis of Houses in Rural Areas (농촌지역 주택의 리노베이션 유형 분석을 통한 물리적 특징 연구)

  • Kim, Yong-Gyun;Kim, Sang-Bum;An, Phil-Gyun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.53-61
    • /
    • 2022
  • In order to understand the physical condition and spatial deformation of houses in rural areas in Hodang Village, Ipjang-myeon, Cheonan-si, a rural area with a good settlement environment, physical characteristics and spatial deformation were identified. First, looking at the construction pattern of houses in rural areas, there have been many houses built since the 1990s, and the modernized spatial composition of urban houses appeared. Second, due to the nature of rural housing, work space and residential space are mixed, and it was analyzed that space is used through renovation to solve this problem. Third, Hodang Village was analyzed as an area with good living services, but as a result of the village survey, the proportion of vacant houses was high at 14 (42.4%). This study is conducting continuous rural housing research, rather than a temporary study on rural housing and vacant houses, based on the problems that have been drawn from previous research and existing fact-finding studies.