• 제목/요약/키워드: Construction Site Information

검색결과 825건 처리시간 0.029초

철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 - (Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -)

  • 김환용;신민호;한상천;최영우;김창호
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

분포형 모형의 다지점 보정 모듈 개발 - GRM 모형을 중심으로 - (Development of a Multi-Site Calibration Module of Distributed Model - The Case of GRM -)

  • 최윤석;최천규;김경탁
    • 한국지리정보학회지
    • /
    • 제15권3호
    • /
    • pp.103-118
    • /
    • 2012
  • 분포형 모형은 유역내에서 공간 분포된 임의 지점의 유출해석 결과를 손쉽게 얻을 수 있다. 이때 다양한 특성을 가지는 소유역으로 구성된 유역의 경우, 소유역에 대해 신뢰성 있는 유출량을 얻기 위해서는 소유역별로 보정된 모형을 적용해야 한다. 본 연구에서는 관측 유량자료가 있는 소유역별로 모형을 보정할 수 있는 다지점 보정 기술을 개발하였다. 이를 위해서 다지점 보정 대상매개변수의 선정 및 적용 방법과 소유역 네트워크 정보를 설정하는 방법을 제시하였다. 또한 다지점 보정 모듈을 구현하기 위한 클래스를 설계하고 GUI를 개발하였으며, 소유역별로 설정된 매개 변수를 이용한 유출해석 절차를 정립하였다. 다지점 보정 모듈을 낙동강 수계 선산 유역($977km^2$)에 적용하였다. 적용결과 다지점 보정 모듈은 유역내 소유역에 대한 모형의 보정에 효과적으로 적용할 수 있었으며, 다지점 보정에 의해서 소유역의 유출해석 결과를 향상시킬 수 있었다.

BIM을 이용한 건설리스크 해결 가능성 도출 (Identifying Potential Opportunities of BIM for Construction Risk Management)

  • 원종성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

건설 현장의 초정밀 디지털 맵 생성 및 연계를 위한 정보체계 프로토타입 설계 (Design of an Information System Prototype for Generating and Linking Ultra-precision Digital Maps of Construction Sites)

  • 김종협;염동준;고현아;강태경
    • 한국산업융합학회 논문집
    • /
    • 제23권6_2호
    • /
    • pp.1015-1024
    • /
    • 2020
  • By nature, smart construction technology is a convergence technology, therefore aptly constructing and running an information system is needed in order to effectively develop and maintain it. Thus, in this study, an information system prototype was developed for the creation and linking of high precision digital maps at road construction sites for the effective performance of the development of the Information Collecting and Analyzing Techniques in the Construction Site (ICAT). For this, (1) defined input/output (I/O) data of each technical detail of ICAT, (2) analyzed the data flow, (3 ) proposed an information system prototype for high precision digital maps development and connection. Based on the information system prototype constructed in this study, it was inferred that each technique and its information for the Smart Construction Technique Development Business was in a consistent flow. Developed information system prototype would enable effective cooperation between subjects directly involved in the technique development, by defining I/O data in advance. Moreover, it would be of value to practitioners for refining the output data from each technique, thereby linking databases and forming Entity Relationship Diagram.

콘크리트 궤도의 시공 및 유지관리를 위한 침하관리 통합 시스템의 구축 및 활용 (Development and Application of Integrated Settlement Management System for Construction and Maintenance of Concrete Railway)

  • 우상인;천성호;정충기;이일화;권오정
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1196-1202
    • /
    • 2007
  • In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.

  • PDF

유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구 (The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular)

  • 이창재;임석호
    • KIEAE Journal
    • /
    • 제12권6호
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

지반조사 정보의 3차원 가시화 시스템 개발 (The Development of 3-D System for Visualizing Information on Geotechnical Site Investigation)

  • 홍성완;배규진;서용석;김창용;김광염
    • 지질공학
    • /
    • 제12권2호
    • /
    • pp.179-188
    • /
    • 2002
  • 최근 컴퓨터 성능 및 컴퓨터 가시화 기술의 발달에 힘입어 지반공학 분야의 지반조사결과를 가시화 할 수 있는 소프트웨어들이 출시되고 있다. 지반조사의 중요한 목적 중 하나는 건설대상 부지 내에 분포하는 건설에 불리하게 작용하는 불확실성을 예측하고 파악하는 것이다. 이들 불확실성은 시공의 안정성을 떨어뜨릴 뿐만 아니라 공기를 지연시키고 공사비를 증가시킨다. 3차원 가시화 기법은 이러한 지반의 불확실성을 극복할 수 있는 좋은 도구중 하나이다. 본 논문에서는 터널설계 및 시공분야에 3차원 가시화 기술, GIS 기술, 데이터베이스 기술을 적용하기위하여 새롭게 개발된 시스템을 소개한다. 가상현실과 3차원 가시화 기술은 지반구조 및 특성을 3차원 모델화 하는데 사용되었으며, 데이터베이스 기술과 GIS 기술을 접목하여 지반조사와 터널시공 중에 획득되는 지반정보를 데이트베이스화 하였다. 본 시스템을 이용함으로서 초목 엔지니어는 설계단계에서 계획을 세울 때 지반조사 정보를 유용하게 이용할 수 있고, 시공단계에서 공사의 안정성 및 경제성을 극대화시킬 있을 것이다.

현장측량시스템을 이용한 터널공사의 효용성 향상 (Improvement Efficiency of Tunnel Work using Site Surveying System)

  • 최석근;안원태
    • 대한공간정보학회지
    • /
    • 제14권3호
    • /
    • pp.31-37
    • /
    • 2006
  • 기존의 터널 측량 방법은 관측시간이 많이 소요되고, 이로 인한 공사비 증가 및 공사기간 지연 등의 문제점을 가지고 있기 때문에 터널측량에서의 오차요인과 시간 및 경비절감 문제 등을 해결할 수 있는 측량시스템을 개발하여 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book 컴퓨터를 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 터널 측량시 오차발생과 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공품질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.

  • PDF

사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 - (A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island -)

  • 조성민;조성희;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF