• Title/Summary/Keyword: Construction Site Information

Search Result 829, Processing Time 0.03 seconds

Case study in application of DVR system for field data collection and analysis (DVR(Digital Video Recorder)을 활용한 현장정보 수집 및 분석에 관한 사례연구)

  • Shin Bong-Soo;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.486-489
    • /
    • 2002
  • Construction management has been a target of the result and the index which were decided by whether the resourecs(time, cost and progress...etc) were used. but this has been serious problems in time and cost because of the shortage of storage space, the incident, lowering of efficiency for works, working impossible of between work categories and the demage of finished products. Therefore I noticed that more correct and more objective establish of data collecting system was necessary. it was through the diversification of information for exchange and communication between the construction site and participants. DVR(Digital Video Recorder) and internet technology were suggested for a solution to this problem. the collected information by DVR was divided to 3 steps as how long it used and how much it processed for improving efficiency of using and storage of information. and then it was verified through applying to cases at construction site.

  • PDF

Prototype Structure of integrated Document Forms for Construction PMIS based on Analysis (건설 PMIS 현황분석에 기반한 통합양식체계 프로토타입)

  • Kim, Myeong-Jin;Jung, Tae-Hwan;Noh, Gyu-Tae;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.3-11
    • /
    • 2011
  • The Project Management Information System (PMIS), the core of construction information, performs the function of handling large volumes of data and information in the actual layout and construction, and supports the manager in making a prompt decision. The purpose of this study is to develop a construction PMIS integrated form system prototype for process and quality control forms, submitted between project groups, as the method of data sharing and communication among an owner, supervisor, and site manager. This study of the integrated form classification system was carried out with limited case studies and interviews of professionals due to lack of data from the previous thesis and related research material From the results of this study, an Excel-based integrated form system was established for a complete site.

Building waste management plan using BIM and RFID technology (BIM과 RFID 기술을 활용한 건설 폐기물 관리 방안)

  • Duan, Chen;An, Ie-sle;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.26-39
    • /
    • 2022
  • The purpose of this study is to establish a novel system for on-site management of construction and demolition waste. Construction waste has always been one of largest waste in the world and has long lacked an effective management system. Although various countries have planned the disposal of waste at the political level, the real-time and effective management of construction sites has not been mentioned. Especially in China, the continuous development of the construction industry also generates a large amount of waste, and China is not prepared for a large amount of construction waste. In order to alleviate the huge impact of construction waste on society and the environment, this study proposes a waste management method that combines Building Information Modeling technology and Radio Frequency Identification technology. Through this research, by using information technology to manage the generation and discharge of construction waste, and record the amount and information of waste generation, also improve the management method of construction waste.

Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work - (소규모 건축공사의 BIM 정보 활용을 위한 프로세스 제안 - 철골공사 중심으로 -)

  • Kim, Jin-Kwang;Yoo, Moo-Young;Ham, Nam-Hyuk;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.41-50
    • /
    • 2018
  • The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

A Study on the Development of the Guidelines for Supervision and Inspection of Earthworks Quantity Using 3D Scanning Technology (3D 스캐닝 기술을 이용한 토공사 기성관리 감독 및 검사 가이드라인 개발)

  • Lee, Young-ho;Yun, Won Gun;Park, Jae-woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.735-746
    • /
    • 2020
  • Recently, in Korea, various technology developments have been made to utilize 3D space and facility data such as unmanned aerial vehicles (UAV) and laser scanners with the goal of improving productivity at construction sites. However, the lack of related regulations for 3D laser scanner surveying has been a barrier to using the technology across the surveying industry. As a result, owners, contractors, and construction supervisors are reluctant to introduce and apply technology to the site. In this study, the guidelines (drafting and inspection work to be supervised by construction supervisors when constructing earthworks using laser scanners) was developed and presented so that the earth surveying and quantity calculation technology using a laser scanner could be applied and diffused in a construction site. Through the development of this guideline (proposal), it is judged that the supervision and inspection of earthworks quantity using a laser scanner will be activated in the field.

3D Spatial Information Acquisition for Construction Operation and Maintenance on a Construction Site (효율적인 건설공사와 유지관리를 위한 건설현장에서의 3차원 공간 정보 획득)

  • Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.188-193
    • /
    • 2004
  • 3D spatial-modeling can be used in various safety-enhancement applications and for as-built data acquisition in project-control systems. The objective of the research reported herein was to provide spatial-modeling methods that represent construction sites in an efficient manner and to validate the proposed methods by testing them in an actual construction environment. Algorithms to construct construction-site scenes and to carry out coordinate transformations in order to merge data from different acquisition locations are presented. Field experiments were conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.

  • PDF

Design of Network Architecture in Underground Structure Field Information Based on VI-GNSS (VI-GNSS 지하구조물 현장정보 네트워크 아키텍쳐 설계)

  • Jeon, Heung-Soo;Jang, Yong-Gu;Oh, Chang-Kyun;Kim, Min-Koan
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.18 no.1
    • /
    • pp.64-73
    • /
    • 2015
  • Recently, the integrated utilization of technology with IT is in demand for the effectiveness of field management together with the prevention and prompt action on safety accident at construction site. In addition, the establishment of construction site support system is necessary to implement the securing of worker's safety, smooth work instruction, efficiency in construction, and others. Data standardization and network architecture were designed regarding data and sound information for data transmission between systems and management. These were to construct USFSS based on integrated VI-GNSS technology in this research. In the stability test of data for each system constructed through it, around 98% stability was secured between workers and for transfer vehicle system within underground structure and field server system in regards to the data transmission stability, around 100% stability was secured between field server system and control system, respectively. Also, in the sound transmission stability test, around 99% reliability could be secured with 1km distance as its standard in case of sound transmission from underground structure construction site to field office near the field through wireless FRS system.

A Study on the Improvement of Safety Management at the Construction Stage using Design for Safety Results - Focusing on the Connection between Design for Safety and Safety Management Plan (설계 안전성 검토 결과를 활용한 시공단계 안전관리 업무 개선 - 설계 안전성 검토와 안전관리계획의 연계를 중심으로)

  • Lee, Goon Jae
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.54-60
    • /
    • 2020
  • Recently, the issue of construction safety is growing. In the construction industry, accidents have continued to increase since 2000. In particular, the number of accident deaths at small and medium-sized construction sites accounts for 72.11% of the total number of accident deaths in the construction industry. For construction safety, prior safety evaluation systems such as Design for safety and safety management plan preparation are in place. However, at construction sites, these systems are recognized as formal legal documents, and their effectiveness is greatly reduced. Therefore, in this study, a linkage model that links design safety review information and safety management plan information was presented so that the safety management plan can be efficiently established. In addition, the effectiveness of the proposed process was verified as an example of actual work. The linkage model will contribute to improving the safety management environment at the site by increasing the productivity of safety management work by enabling easy sharing of risk factor information in the construction stage safety management work. The results of this study will be used as basic information for the development of the integrated safety management system.