Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.4
/
pp.59-73
/
2016
The demand for subsurface transport is increasing. The users and the operators of road tunnels are exposed to risks with different causes. One main cause, however, is the traffic situation in the event of accidents. The importance of a Quantified Risk Assessment is increasing to quantify the safety of road tunnels and to balance the requirements (capacity, reliability, availability, maintainability and safety) of various stakeholders. Although there are classical methods for risk assessments, such as ETA and FTA. These methods are used for relatively simple cases because it could not relevantly reflect the diversity and relationship of the parameters. Therefore, a quantitative risk assessment based on Bayesian Probabilistic Networks considering interdependence between the parameters of a complex underground system as a double deck tunnel is provided.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.11a
/
pp.139-140
/
2022
This study aims to present basic data for fire risk assessment. In the existing fire risk assessment, the operation of fire safety facilities is not considered. In addition, there is a lack of data on the fire growth rate to predict the spread of fire. Therefore, this study intends to build a fire scenario using fire statistics data. In addition, the fire growth rate is to be derived in consideration of the floor area of burnout and the cause of fire.
Journal of Korean Tunnelling and Underground Space Association
/
v.9
no.1
/
pp.63-74
/
2007
Unexpected ground conditions have always been a major problem for the construction of tunnel. Therefore, it is necessary to evaluate the risk capacity before and/or during construction of new tunnel. This paper presents the simplified risk assessment system using modified stability number (N), namely Underground Risk Index (URI) system, to evaluate the tunnel risk possibility in the design stage. URI is a scoring system for risk possibility by rating the each appraisal elements. The modified stability number (N) which is one of risk factor in the Interaction Matrix parameters such as RQD, UCS, weathering, overburden, stability number, ground water-table, RMR, permeability and so on, is used in the system. In addition, the case study is performed in order to verify the applicability of URI-system in practice.
Journal of Korean Tunnelling and Underground Space Association
/
v.10
no.1
/
pp.1-15
/
2008
Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.
We conducted a quantitative human health risk assessment with respect to inhalation of heavy metals for residents of housing developments in "new towns" where an incinerator will be operated within the area scheduled for construction thereof. To assess potential human health risk we calculated the amount of heavy metals emitted from the incinerator, and then forecasted the potential health impact on adjoining areas where new housing is to be developed (i.e. "new towns") at different altitudes by a using SCREEN-3 model. We assessed Cancer Risk (CR) caused by known carcinogens using the Inhalation Unit Risk criteria developed by the US Environmental Protection Agency. Notably, we assessed risk by determining concentrations of heavy metals on a floor by floor basis, as apartment buildings are to be constructed near the incinerator according to a pre-devised plan. Results indicated that cancer risk for most carcinogens exceeded US EPA standards for the highest locations at each collection point. This result indicates that construction of high buildings in areas adjoining incinerators is undesirable, and that measures to lower carcinogens are needed. The results of this study, which assessed health risk from exposure to heavy metals emitted from a nearby incinerator, can be useful in land use planning with respect to the location of housing developments in new towns, as well as the heights of any buildings constructed. Furthermore, the methodology deployed herein with respect to risk assessment can be helpful for policy makers and the general public in the event of conflicts regarding incinerator projects in the future. The results herein may also be of merit in determining priorities when establishing harm reduction measures for carcinogens at incinerators. However, the study does contain several limitations. The SCREEN-3 model, a kind of screening model that provides conservative results, can provide higher forecasted concentrations of air pollutants than other models. Moreover, although the incinerator in question is set to be a thermoselect type, domestic data for emissions from these incinerators is not available, and assumptions were based on a stoker type incinerator. Insufficient domestic data likewise compelled the use of data of USA, resulting in possible errors in results. Continued research will thus be required to develop systematic methodologies that address the foregoing factors and produce more reliable outcomes.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.6
/
pp.931-946
/
2018
In line with the increased usability of utility pipe conduits in urban areas, construction and R&D activities of utility tunnel, incorporated with the shield TBM method, are actively under way. The utility tunnels are installed through underground excavation, and thus are relatively weak in terms of construction safety. However, hazards associated with the utility tunnel construction have not been properly identified, despite the introduction of a policy to the 'Design for Safety' for the purpose of reducing accident rates in the construction industry. Therefore, in this study, following the derivation of hazards associated with utility tunnel, these hazards were then used as the basis to uncover key safety hazards requiring extensive management in a field, which were then used to conduct a risk assessment having applied the matrix method so that the results can be utilized in risk assessment during the stages of utility tunnel planning, design, and construction, while also serving as a data reference.
Purpose: The purpose of this study is to prevent construction safety accidents, and the design safety systems were reviewed. This paper aims to establish as an effective system by looking at the implementation procedures and contents of the design safety review system. Method: We reviewed the purpose and content of the law, accident statistics, etc. for the study. In addition, we looked at the implementation plans for actual construction sites using the 'design safety' assessment process as defined by the Act. Results: We divided it into the data review phase, the risk factor elicitation and alternative setup phase, and the design safety assessment report preparation stage. Conclusion: it is necessary to derive risk factors that take into account the diversity of construction sites. However, the effectiveness of other reports is questioned as they are often copied and written. Therefore, it is necessary to strengthen external verification procedures attended by construction safety experts.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.204-205
/
2015
Exterior insulation board in cast-in-place concrete form system could reduce construction period and improve quality in apartment construction. However, the method is progressed with insulation and concrete frame works at the same time, then risk is increased in duration control and quality management. Therefore, this paper analyzed risk factors through FMEA method. We found that the key risk factors delaying schedule was insulation material that soaked in the rain and quality defects on the insulation material joint. Based on this research, the risk management approach should be developed for improvement of method activation.
Journal of the Korean Professional Engineers Association
/
v.34
no.5
/
pp.77-81
/
2001
The industrial accident in subway of late is increasingly coming to the front as a serious problem of society because a scale of industrial accident is a large size, and powerfulness, while the percent of accident is decreasing as a result of industrial facilities with the largeness of equipment, automation, and high horse-powering. In this paper, a study on the estimation of accident loss prevention cost and risk analysis in subway construction is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using a risk assessment model is presented to drive value of risk and numerical example for risk analysis. A means for this does grasp the importance of educational factor by way of analyzing the causes of accident through statistical data of labor department, emphasizing the necessity and the importance of safety education, being helpful to act safety by decreasing insecure activity which ranks the majority of accident causes with putting the education program, form, method into practice that are suitable for a place of business.
Kim, Dong-Gyu;Kim, Min-Seung;Lee, Su-Min;Kim, Yu-Jin;Han, Seung-Woo
Proceedings of the Korean Institute of Building Construction Conference
/
2022.11a
/
pp.99-100
/
2022
As the danger of exposure to the asbestos has been revealed, the importance of demolition asbestos in existing buildings has been raised. Extensive body of study has been conducted to evaluate the risk of demolition asbestos, but there were confined types of variables caused by not reflecting categorical information and limitations in collecting quantitative information. Thus, this study aims to derive a model that predicts the risk in workplace of demolition asbestos by collecting categorical and continuous variables. For this purpose, categorical and continuous variables were collected from asbestos demolition reports, and the risk assessment score was set as the dependent variable. In this study, the influence of each variable was identified using logistic regression, and the risk prediction model methodologies were compared through decision tree regression and artificial neural network. As a result, a conditional risk prediction model was derived to evaluate the risk of demolition asbestos, and this model is expected to be used to ensure the safety of asbestos demolition workers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.