The application of simplified risk assessment for tunnel

터널 리스크 평가 기법의 적용성에 대한 연구

  • Published : 2007.03.31

Abstract

Unexpected ground conditions have always been a major problem for the construction of tunnel. Therefore, it is necessary to evaluate the risk capacity before and/or during construction of new tunnel. This paper presents the simplified risk assessment system using modified stability number (N), namely Underground Risk Index (URI) system, to evaluate the tunnel risk possibility in the design stage. URI is a scoring system for risk possibility by rating the each appraisal elements. The modified stability number (N) which is one of risk factor in the Interaction Matrix parameters such as RQD, UCS, weathering, overburden, stability number, ground water-table, RMR, permeability and so on, is used in the system. In addition, the case study is performed in order to verify the applicability of URI-system in practice.

불확실한 지반의 상태는 항상 터널 건설에 있어서 많은 문제점을 일으킨다. 그러므로 새로운 터널의 건설에 앞서 위험에 대한 평가가 필요하다. 이 논문은 수정된 안정계수를 이용한 간편 위험도 평가 시스템인 URI(Underground Risk Index)를 제안하였다. URI의 평가요소들은 각 요소의 등급에 따라 점수화하여 분석함으로서 설계단계에서 위험 가능성에 대한 평가에 이용이 가능하도록 하였으며, 기존의 Interaction Matrix에서 8개의 설계 요소 중(RQD, 일축압축강도, 풍화도, 안정계수, 토피고, 지하수위, RMR, 투수계수)안정계수 산정방법을 수정하여 보다 신뢰성을 높였다. 또한 현장적용에 대한 신뢰성을 검증하기위하여 URI 시스템을 실제현장에 적용하였다.

Keywords